Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-II-15-025, NRC Schedules Open House April 22 to Discuss Agencys 2014 Assessment of Hatch Nuclear Plant + (ML15104A694)
- ML15104A699 + (ML15104A699)
- ML15104A703 + (ML15104A703)
- ML15104A727 + (ML15104A727)
- TMI-15-048, Submittal of the Update to the Fifth Ten-Year Interval Inservice Testing Program + (ML15104A734)
- Press Release-15-017, NRC Issues Final Environmental Report on Sequoyah Nuclear Plant License Renewal + (ML15104A742)
- ML15104A751 + (ML15104A751)
- Press Release-II-15-021, NRC Schedules Public Meeting to Discuss Safety Performance of Babcock & Wilcox Nuclear Operations Group Facility in Lynchburg + (ML15104A755)
- ML15104A759 + (ML15104A759)
- ML15104A782 + (ML15104A782)
- GNRO-2015/00023, Response to Request for Additional Information Response on Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2 Revision + (ML15104A784)
- ML15104A804 + (ML15104A804)
- ML15104A806 + (ML15104A806)
- ML15104A807 + (ML15104A807)
- ML15104A808 + (ML15104A808)
- ML15104A809 + (ML15104A809)
- ML15104A810 + (ML15104A810)
- ML15105A014 + (ML15105A014)
- ML15105A037 + (ML15105A037)
- ML15105A039 + (ML15105A039)
- 05000254/LER-2015-002, Regarding HPCI Interlock Doors Opened Simultaneously Cause Loss of Secondary Containment + (ML15105A040)
- NOC-AE-15003243, Voluntary Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees + (ML15105A041)
- ML15105A041 + (ML15105A041)
- CP-201500334, Revised Completion Date for the Multiple Spurious Operation Circuit Interactions Resolution Implementation Plan + (ML15105A042)
- ML15105A043 + (ML15105A043)
- RNP-RA/15-0026, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication + (ML15105A044)
- ML15105A057 + (ML15105A057)
- AEP-NRC-2015-01, Steam Generator Tube Inspection Report + (ML15105A074)
- ML15105A076 + (ML15105A076)
- ML15105A080 + (ML15105A080)
- ML15105A081 + (ML15105A081)
- ML15105A096 + (ML15105A096)
- ML15105A133 + (ML15105A133)
- ML15105A188 + (ML15105A188)
- ML15105A221 + (ML15105A221)
- ML15105A223 + (ML15105A223)
- ML15105A224 + (ML15105A224)
- ML15105A241 + (ML15105A241)
- 1CAN041501, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation + (ML15105A248)
- IR 05000302/2015007 + (ML15105A253)
- 05000374/LER-2015-002, Regarding Two Main Steam Safety Relief Valves Failed Inservice Inspection Pressure Test + (ML15105A268)
- ML15105A284 + (ML15105A284)
- ML15105A290 + (ML15105A290)
- ML15105A291 + (ML15105A291)
- ML15105A313 + (ML15105A313)
- ML15105A335 + (ML15105A335)
- ML15105A346 + (ML15105A346)
- ML15105A349 + (ML15105A349)
- ML15105A366 + (ML15105A366)
- AEP-NRC-2015-38, Submittal of Cycle 22 Core Operating Limits Report, Revision 0 + (ML15105A377)
- ML15105A381 + (ML15105A381)