Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15069A391 + (ML15069A391)
- RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel + (ML15069A432)
- AEP-NRC-2015-29, Follow Up Notification to Offsite Agencies of a Lube Oil Cooler Leak That Discharged Approximately 2000 Gallons of Light Turbine Lube Oil to Lake Michigan + (ML15069A434)
- GO2-15-024, Withdrawal of Inservice Inspection (ISI) Program Request 3ISI-16 + (ML15069A435)
- L-15-034, Water Withdrawal Report for the Davis-Besse Nuclear Power Station, Unit 1, for 2014 + (ML15069A436)
- BVY 15-006, Request for Partial Exemption from Record Retention Requirements + (ML15069A439)
- ML15069A488 + (ML15069A488)
- PNO-III-15-004, Byron Unit 1 Automatic Shutdown After Falling Ice Caused Main Power Transformer Short Circuit + (ML15069A489)
- ML15069A492 + (ML15069A492)
- ML15069A516 + (ML15069A516)
- ML15069A531 + (ML15069A531)
- CNL-15-023, Final Safety Analysis Report, Amendment 113 + (ML15069A533)
- ML15069A574 + (ML15069A574)
- ML15069A576 + (ML15069A576)
- ML15069A590 + (ML15069A590)
- Press Release-II-15-005, NRC Returns NFS Facility in Erwin, Tenn., to Normal Agency Oversight and Inspection + (ML15069A598)
- Press Release-I-15-006, NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th + (ML15069A614)
- ML15069A615 + (ML15069A615)
- ML15069A626 + (ML15069A626)
- Press Release-II-15-007, NRC Schedules Open House to Discuss Annual Assessment of Turkey Point Nuclear Plant + (ML15069A626)
- Press Release-II-15-008, NRC Schedules Open House to Discuss Annual Assessment of Watts Bar Nuclear Plant Unit 1 + (ML15069A630)
- ML15069A635 + (ML15069A635)
- NL-15-0433, Unit 2, Supplemental Response to Request for Additional Information from Mechanical and Civil Branch Regarding High Density Polyethylene (Hdpe) Piping Replacement RAI-13 + (ML15069A640)
- Press Release-II-15-006, NRC Schedules Open House to Discuss Annual Assessment of St. Lucie Nuclear Plant + (ML15069A643)
- ML15069A671 + (ML15069A671)
- ML15069A677 + (ML15069A677)
- L-2015-050, Annual Fitness-For-Duty-Program Report for the Period of January 1 Through December 31, 2014 + (ML15070A005)
- LIC-14-0121, ISFSI - License Amendment Request 14-08; Request Extension for Milestone 8 of Cyber Security Plan Implementation Schedule + (ML15070A007)
- 05000454/LER-2015-001, Inadequate Application of Technical Specifications Related to Main Steam Isolation Valves and Actuator Trains + (ML15070A013)
- IR 05000416/2015201 + (ML15070A057)
- ML15070A075 + (ML15070A075)
- ML15070A086 + (ML15070A086)
- ML15070A124 + (ML15070A124)
- IR 05000318/2015008 + (ML15070A127)
- IR 05000317/2015008 + (ML15070A127)
- ML15070A161 + (ML15070A161)
- ML15070A189 + (ML15070A189)
- ML15070A201 + (ML15070A201)
- ML15070A209 + (ML15070A209)
- ML15070A234 + (ML15070A234)
- ML15070A241 + (ML15070A241)
- ML15070A252 + (ML15070A252)
- ML15070A253 + (ML15070A253)
- Press Release-II-15-009, NRC Proposes $70,000 Fine for Violations at Sequoyah Nuclear Plant + (ML15070A264)
- ML15070A299 + (ML15070A299)
- ML15070A392 + (ML15070A392)
- ML15070A400 + (ML15070A400)
- ML15070A428 + (ML15070A428)
- ML15070A466 + (ML15070A466)
- ML15070A473 + (ML15070A473)
- ML15070A474 + (ML15070A474)