Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14211A389 + (ML14211A389)
- ML14211A403 + (ML14211A403)
- ML14211A412 + (ML14211A412)
- ML14211A447 + (ML14211A447)
- PNP 2014-073, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (ML14211A451)
- ML14211A454 + (ML14211A454)
- L-2014-253, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit + (ML14211A507)
- L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) + (ML14211A508)
- L-2014-251, Request for Extension of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink + (ML14211A509)
- ML14211A512 + (ML14211A512)
- PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events + (ML14211A524)
- ML14211A525 + (ML14211A525)
- 05000336/LER-2014-006, Regarding Millstone Power Station Dual Unit Reactor Trip on Loss of Offsite Power + (ML14211A526)
- NLS2014075, Supplement to License Amendment Request - Revision of Cyber Security Plan Implementation Schedule + (ML14211A527)
- ML14211A575 + (ML14211A575)
- ML14211A586 + (ML14211A586)
- LR-N14-0162, Submittal of Relief Request Associated with the Third Ten-Year Inservice Inspection (ISI) Interval + (ML14211A589)
- ML14211A590 + (ML14211A590)
- ML14211A600 + (ML14211A600)
- ML14211A602 + (ML14211A602)
- ML14211A662 + (ML14211A662)
- ML14211A663 + (ML14211A663)
- IR 05000382/2014010 + (ML14211A671)
- 05000325/LER-2014-005, Regarding Setpoint Drift in Main Steam Line Safety/Relief Valves Results in Two Valves Inoperable + (ML14212A031)
- BSEP 14-0073, Inservice Inspection Program Owners Activity Report for Unit 1 Refueling Outage 20 + (ML14212A035)
- 05000265/LER-2014-003, Regarding RPS Pressure Switch for Condenser Vacuum - Low Inoperable and Exceeded Technical Specifications + (ML14212A037)
- ML14212A038 + (ML14212A038)
- ENOC-14-00016, Response to Request for Voluntary Response to 2.206 Petition Regarding Financial Qualifications, + (ML14212A050)
- ML14212A053 + (ML14212A053)
- 05000387/LER-2013-006-01, 1 for Susquehanna Steam Electric Station, Unit 1, Regarding Loss of Secondary Containment Due to Differential Pressure Not Meeting Technical Specification 3.6.4.1 + (ML14212A062)
- ML14212A071 + (ML14212A071)
- IR 05000454/2014301 + (ML14212A099)
- GNRO-2014/00049, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 11 + (ML14212A109)
- IR 05000259/2014003 + (ML14212A112)
- GNRO-2014/00050, Correction of Technical Specification Typographical Error + (ML14212A113)
- IR 05000269/2014013 + (ML14212A123)
- PLA-7192, Th Rio Steam Dryer Visual Inspection Report + (ML14212A126)
- IR 05000250/2014003 + (ML14212A253)
- ML14212A255 + (ML14212A255)
- ML14212A264 + (ML14212A264)
- ML14212A307 + (ML14212A307)
- ML14212A308 + (ML14212A308)
- LR-N14-0173, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14212A355)
- ML14212A374 + (ML14212A374)
- ML14212A380 + (ML14212A380)
- L-2014-223, Approval of the Request for the Use of Copper Sulfate, Hydrogen Peroxide and a Bio-Stimulant in the Treatment and Control of Blue Green Algae in the Cooling Canal System (CCS) - NRC Notification + (ML14212A394)
- L-2014-227, RAI Reply for Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements + (ML14212A395)
- RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating + (ML14212A396)
- GO2-14-104, Response to Request for Additional Information Related to Relief Requests for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing Program + (ML14212A397)
- RBG-47479, Withdrawal of License Amendment Request + (ML14212A398)
- ML14212A401 + (ML14212A401)