Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-11-123, Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for Rcs + (ML112280281)
- JAFP-11-0102, Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers + (ML112280282)
- ML112280292 + (ML112280292)
- ML112280326 + (ML112280326)
- NRC-2011-0077, Emergency Response Data System (ERDS) Changes + (ML112280378)
- ML112280389 + (ML112280389)
- PNP 2011-058, License Amendment Request to Revise Calculated Peak Containment Internal Pressure + (ML112280430)
- ML112280501 + (ML112280501)
- ML112280536 + (ML112280536)
- ML112280554 + (ML112280554)
- ML112280573 + (ML112280573)
- ML112280599 + (ML112280599)
- ML112280604 + (ML112280604)
- ML112280623 + (ML112280623)
- ML11228A005 + (ML11228A005)
- RC-11-0104, License Amendment Request - LAR (10-03107) Proposed Change in Administrative Controls Section to Allow the Use of Westinghouse WCAP-12472-P-A, Addendum 1-A + (ML11228A009)
- L-2011-317, Errata to Technical Specification Changes for Amendments 244 and 240, Alternative Source Term + (ML11228A010)
- L-2011-277, Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H.1 + (ML11228A011)
- L-2011-304, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Balance of Plant Issues + (ML11228A012)
- ML11228A020 + (ML11228A020)
- ML11228A024 + (ML11228A024)
- SBK-L-11170, Inservice Inspection Examination Report + (ML11228A026)
- RNP-RA/11-0029, Withdrawal of Reactor Vessel Internals Aging Management Program Inspection Plan + (ML11228A027)
- 05000293/LER-2011-004, For Pilgrim Nuclear Power Station, Regarding Technical Specification Required Shutdown - Drywell to Torus Dp + (ML11228A028)
- ML11228A030 + (ML11228A030)
- 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR + (ML11228A032)
- ML11228A046 + (ML11228A046)
- ML11228A047 + (ML11228A047)
- ML11228A048 + (ML11228A048)
- ML11228A084 + (ML11228A084)
- ML11228A086 + (ML11228A086)
- ML11228A087 + (ML11228A087)
- RNP-RA/11-0067, Unit & ISFSI - Calculation No. NUH24PTH.0423, NUHOMS HSM-H Temperature Rise Vs. Decay Heat Calculation + (ML11228A088)
- ML11228A109 + (ML11228A109)
- ML11228A116 + (ML11228A116)
- ML11228A117 + (ML11228A117)
- ML11228A118 + (ML11228A118)
- NL-11-1559, NRC Request for Additional Information for License Amendment Request for Steam Generator Water Level High-High (P-14) Setpoint Change + (ML11228A119)
- ML11228A129 + (ML11228A129)
- Press Release-II-11-045, NRC Begins Special Inspection at Turkey Point Nuclear Power Plant + (ML11228A191)
- Press Release-III-11-029, NRC Begins Special Inspection at Palisades Nuclear Power Plant + (ML11228A197)
- BSEP 11-0064, Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations + (ML11228A198)
- ML11228A199 + (ML11228A199)
- DCL-11-088, Annual Commitment Change Summary Report + (ML11228A200)
- GO2-11-128, Cycle 21 Core Operating Limits Report (Colr), Revision 0 + (ML11228A201)
- ML11228A208 + (ML11228A208)
- ML11228A226 + (ML11228A226)
- ML11228A227 + (ML11228A227)
- ML11228A228 + (ML11228A228)
- ML11228A229 + (ML11228A229)
- ML11228A230 + (ML11228A230)