Letter Sequence Request |
---|
|
|
MONTHYEARML11228A2082011-08-10010 August 2011 ISFSI - Proposed Change to Technical Specifications Project stage: Request ML11287A0472011-10-12012 October 2011 Enclosunotice of Consideration of Issuance of Amendment to Facility Operating License (DPR-3), Proposed No Significant Hazards Determination, and Opportunity for a Hearing (TAC No. L24561) Project stage: Other ML11287A0262011-10-12012 October 2011 R. Mitchell Letter Yankee Atomic Electric Company Notice of Consideration of Issuance of Amendment to Facility Operating License (DPR-3), Proposed No Significant Hazards Determination, and Opportunity for a Hearing (TAC No. L24561) Project stage: Other ML1202606802012-01-24024 January 2012 Enclosure 2: Safety Evaluation (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606742012-01-24024 January 2012 Enclosure 1a: Yaeca a 159 License Page 3 (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606692012-01-24024 January 2012 Enclosure 1: Amendment No. 159 to DPR-3 (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606582012-01-24024 January 2012 R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561) Project stage: Approval ML12031A0832012-01-26026 January 2012 Yankee, Biweekly Notice Memo, Notice of Issuance of Amendment Revises License Condition C(3), Physical Protection. Project stage: Approval ML12075A0632012-03-15015 March 2012 Enclosusafety Evaluation Report (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Corrected Safety Evaluation Report for Amendment No. 159 to Operating License No. DPR-3 (TAC No. L24561)) Project stage: Approval ML12075A0562012-03-15015 March 2012 R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Corrected Safety Evaluation Report for Amendment No. 159 to Operating License No. DPR-3 (TAC No. L24561) Project stage: Approval 2012-01-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] Category:Technical Specification
[Table view] Category:Amendment
MONTHYEARML11228A2082011-08-10010 August 2011 ISFSI - Proposed Change to Technical Specifications 2011-08-10
[Table view] |
Text
YANKEE ATOMIC ELECTRIC COMPANY (r -frL 49 Yankee Road, Rowe, Massachusetts 01367 Q~oTANKE August 10, 2011 Docket No.50-029 Re: 10 CFR 50.90 BYR 2011-021
/
U. S. Nuclear Regulatory Commission /
Attention: Document Control Desk Washington, D. C. 20555-0001 I Yankee Rowe ISFSI Proposed Change to technical Specifications Yankee Atomic Electric Company Operating License (DPR-3)
In accordance with 10 CFR 50.90, Yankee Atomic Electric Company (YAEC) is submitting an amendment request to tlie Yankee Nuclear Power Station Operating License (DPR-3) for the Ya kee Atomic Electric Company Independent Spent Fuel Storage Installation (ISFSI).The proposed change reflects the proper title to Yankee Atomic Electric Company Physical Security Plan.
The proposed change of the Yankee Nuclear Power Station Operating License (DPR-3) is provided in Attachment 1. A description and evaluation of the proposed change is provided in Attaqhment 2.
There are no regulatory commitments contained within this letter.
If you should have any questions regarding this submittal, please contact me at (860) 267-6426 Ext. 301 or Robert Mitchell, Yankee Atomic Electric Company ISFSI Manager at (413) 424-5261 Ext. 303.
Sincerely, CEO an resident Yankee Atomic Electric Company
§Oo/+/-
Document Control Desk BYR 2011-021 Docket No.50-029 Subscribed and sworn before me this iO day of ,I t+ ,2011.
Notary Public My Commission Expires: /lo/b /)-
Attachments:
- 1. Proposed Change to the Yankee Nuclear Power Station Operating License (DPR-3).
- 2. Description and Evaluation of the Proposed Change to the Yankee Nuclear Power Station Operating License (DPR-3).
c: W. Dean, Regional Administrator, NRC Region1 J. Joustra, Decommissioning Branch Chief, NRC Region1 M. Roberts, NRC Region 1 Mr. J. Goshen, NRC, Project Manager
AI Document Control Desk BYR 2011-021 Docket No.50-029 Attachment 1 Yankee Atomic Electric Company ISFSI Proposed Change to the Yankee Nuclear Power Station Operatingq License (DPR-3)
and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Amdt The licensee is not authorized to operate the reactor. Fuel may not be #142 placed in the reactor vessel. 8/5/1992 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised Amdt through Amendment No. 158 are hereby incorporated in the License.
The licensee shall possess and maintain the facility in accordance with the Technical Specifications. 1#145 9/4/1992 (3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements Amdt.
revision to 10 CFR 73.55 (51 FR 27817 and 17822) and to the authority of 10 #156 CFR 50.90 and 10 CFR 50.54(p). The plan, which contain Safeguards 3/13/2002 Information protected under 10 CFR 73.21, is entitled, ",,O. REPL QStationA Sagurity, ln"w4e~ic~ the "GontiAgoncry P~lan" and theoQ upurd ISE ACE WITH rT BELOW Training and Qualifisetion PlSAn," W:ith rcr.ikiBOnz Subrnittzd 09fough Jur-: 120, 490-1-. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
(4) Fire Protection The licensee shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Final Safety Analysis rAmdt.
Report for the facility and as approved by NRC Safety Evaluation Reports #144 dated March 15, 1979, and as supplemented October 1, 1980, and August 27, 8/20/1992 1986, subject to the following provisions:
The licensee may make changes to the approved Fire Protection Program without prior NRC approval if these changes do not reduce the effectiveness of Amdt.
fire protection for facilities, systems, and equipment which could result in a #157 radiological hazard, taking into account the decommissioning plant conditions 4/18/2003 and activities.
INSERT:
"PhysicalSecurity Plan for Yankee Rowe Independent Spent Fuel Storage Installation".
Document Control Desk BYR 2011-021 Docket No.50-029 Attachment 2 Yankee Atomic Electric Company ISFSI Description and Evaluation of Proposed Changes to the Yankee Nuclear Power Station Operating License (DPR-3)
Document Control Desk BYR 2011-021 Docket No.50-029 Yankee Atomic Electric Company ISFSI Description and Evaluation of Proposed Changes to the Yankee Nuclear Power Station Operating License (DPR-3)
Description of the Change:
Pursuant, to 10 CFR 50.90, Yankee Atomic Electric Company (YAEC) proposes to amend its Operating License, DPR-3, by revising License Condition C (3),
"Physical Protection". This change of the Yankee Nuclear Power Station Operating License (DPR-3) would update the title of the Physical Security Plan, from the Yankee Nuclear Power Station Defueled Security Plan" Revision 0 dated October 13, 1992, and "Yankee Nuclear Power Station Defueled Security Training and Qualification Plan" Revision 0, dated October 13, 1992 to "Physical Security Plan for Yankee Rowe Independent Spent Fuel Storage Installation" which is the current NRC approved Physical Security Plan.
Technical Evaluation The proposed changes are administrative in nature and reflect current conditions at the Yankee Nuclear Power Station. These proposed changes do not reduce the commitments in the Physical Security Plan or adversely affect the operation of the ISFSI.
Determination of Impact The proposed Amendment of the Yankee Nuclear Power Station Operating License (DPR-3) is a title change only.
This change does not constitute a reduction in commitments in the Physical Security Plan.
Regulatory Evaluation This proposed change also reflects the current conditions at the site and clarifies that decommissioning of the former power plant was completed in 2007. The Yankee Rowe ISFSI is the correct description of the current facility under Operating License DPR-3.
A similar change was previously approved in 2010 for the Connecticut Yankee Atomic Power Company ISFSI.
Document Control Desk BYR 2011 - 021 Docket No.50-029 Significant Hazards Consideration Yankee Atomic Electric Company (YAEC) has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment is a title change only. There is no reduction in commitments in the Physical Security Plan therefore; the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed amendment is a title change only. There is no reduction in commitments in the Physical Security Plan therefore; the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed amendment is a title change only. There is no reduction in commitments in the Physical Security Plan therefore; the proposed amendment does not involve a significant reduction in a margin of safety.
Based on the above, Yankee Atomic Electric Company concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92 (c), and accordingly, a finding of "no significant hazards consideration" is justified.
Document Control Desk BYR 2011 - 021 Docket No.50-029 Environmental Consideration Yankee Atomic Electric Company has determined that the proposed amendment does not involve: (i) a significant hazards consideration; (ii) a significant change in the types or significant increases in the amounts of any effluent that may be released offsite; or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22 (c)(9).
Therefore, pursuant to 10 CFR 51.22 (c)(9), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
Conclusion Based on the results of this evaluation, the changes proposed (1) do not reduce the level of commitment in the Security Plan, (2) will be conducted in compliance with the Commission's regulations and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.