Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5, Appendix C, ANP-2903(NP), Revision 0, EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding + (ML103560434)
- ML103560434 + (ML103560434)
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report + (ML103560435)
- ML103560435 + (ML103560435)
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request Extended Power Uprate, Attachment 9; Core Operating Limits Report (Colr) Markups + (ML103560441)
- ML103560441 + (ML103560441)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Features Actuation and Control Systems + (ML103560442)
- ML103560442 + (ML103560442)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix F, Caldon Ultrasonics Engineering Reports + (ML103560443)
- ML103560443 + (ML103560443)
- ML103560448 + (ML103560448)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix H, Grid Stability Analysis and System Impact Study with Proposed EPU + (ML103560449)
- ML103560449 + (ML103560449)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5; Appendix I, Holtec Criticality Analysis Reports + (ML103560450)
- ML103560450 + (ML103560450)
- L-10-384, Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public Disclosure + (ML103560451)
- ML103560451 + (ML103560451)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 7; Summary of Regulatory Commitments + (ML103560452)
- ML103560452 + (ML103560452)
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request Extended Power Uprate, Attachment 8; 10 CFR 50.63 Station Balckout DC Coping + (ML103560453)
- ML103560453 + (ML103560453)
- ML103560456 + (ML103560456)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years + (ML103560511)
- ML103560531 + (ML103560531)
- IR 07200039/2010001 + (ML103560542)
- ML103560548 + (ML103560548)
- ML103560551 + (ML103560551)
- Press Release-10-222, NRC Advisory Committee on Reactor Safeguards to Meet Jan 13-15 in Rockville, Md., Posts 2011 Schedule + (ML103560552)
- IR 05000324/2010010 + (ML103560553)
- ML103560561 + (ML103560561)
- ML103560569 + (ML103560569)
- Press Release-10-223, NRC Accepts Toshiba Application to Renew Certification for Advanced Boiling Water Reactor Design + (ML103560574)
- ML103560592 + (ML103560592)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (ML103560593)
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (ML103560594)
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) + (ML103560595)
- CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (ML103560596)
- CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (ML103560597)
- NL-10-136, Submittal of 10 CFR 50.55a Relief Request IP2-ISI-RR-12 for 4th Ten-Year Inservice Inspection Interval + (ML103560598)
- L-10-339, Submittal of November 2010 NPDES Discharge Monitoring Report + (ML103560599)
- ML103560656 + (ML103560656)
- 05000373/LER-2010-003, Regarding Standby Liquid Control Test Tank Seismic Analysis + (ML103560658)
- ML103560661 + (ML103560661)
- ML103560662 + (ML103560662)
- RS-10-212, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate + (ML103560667)
- IR 05000249/2010010 + (ML103560677)
- ML103560681 + (ML103560681)
- ML103560707 + (ML103560707)
- ML103560745 + (ML103560745)
- ML103560752 + (ML103560752)
- ML103560758 + (ML103560758)