MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2017-12-19019 December 2017 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2017-139, License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2017-09-14014 September 2017 License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply 2023-06-14
[Table view] |
Text
St. Lucie Unit 1 L-2010- Docket No. 50-335 Attachment 9
___________________________________________________________________________________ St. Lucie Unit 1 EPU LAR Att. 9-1
ATTACHMENT 9 LICENSE AMENDMENT REQUEST EXTENDED POWER UPRATE CORE OPERATING LIMITS REPORT (COLR)
MARKUPS (For Information Only)
FLORIDA POWER & LIGHT ST. LUCIE NUCLEAR PLANT UNIT 1 This coversheet plus 11 pages Core Operating Limits Report (COLR) Markups St.. Lucie Unit 1 L-2010- Docket No. 50-335 LIST OF PAGES St. Lucie Unit 1 EPU LAR Att. 9-2 Core Operating Limits Report (COLR) Markups Core Operating Limits Report 5 of 13 Proposed COLR Table 3.2-1 (new page)
6 of 13 (replaced by Proposed COLR Figure 3.1.1a)
Proposed COLR Figure 3.1.1a 8 of 13 (replaced by Proposed COLR Figure 3.2.1)
Proposed COLR Figure 3.2.1
9 of 13 (replaced by Proposed COLR Figure 3.2.2)
Proposed COLR Figure 3.2.2
10 of 13 (replaced by Proposed COLR Figure 3.2.3)
Proposed COLR Figure 3.2.3
St. Lucie Unit 1 -
Proposed COLR Table 3.2-1
Table 3.2-1 DNB MARGIN LIMITS PARAMETER FOUR REACTOR COOLANT PUMPS OPERATING Cold Leg Temperature 551 0 F Pressurizer Pressure* 2225 psia Reactor Coolant System Total Flow Rate AXIAL SHAPE INDEX COLR Figure 3.2-4
- PC/M 08032, Rev 0 Attachment 14, Page 6 of 13 70 FIGURE 3.1-1a Allowable Time to Realign CEA vs.Initial F r T o 20 30 40 50 60 Time at Full Power to Realign CEA, MinutesI, t, ,t"1, I'.", , ,""",,..",'I*""",, ,t"" ,*I,""",, ,."I," I I'".",II I"I1**1.1....[**::.'***1***[.r.:***I***>*.I**;....J**1*.I*.'***j***:***[I**:**1]:.1**1*****1.*1*.1.:.1
- ,,, I*t I ,,*,I,,,,,,,1,,, f ,.,, ,,,"I.I.I ,."'I.,"""" I,.f___1"..__*..__......__",,__**"'__"'"."__"" A..
..r..__I.__"'...__,..,,_., ,.","" ,," l'"*t*," ,'" r",',',",', ,.., t ," ,." ,',', If'" ,,'.**I ," I"."", I*,1"",,""*I ,*j I.,,I.."II*I"'..,:T:LT::1+LIiI I LH'III:H::I:H:r:'H::I: o 1.60 1.62,, ,."I'**I',t I*1,**'" 1'I"",., , I I"""".".,"'" I ,."""",.," ,"*IIIII" I'l'",.""r---'"rr.'..TTT--'TTTT--'Trrr'--rrr"r'j-'rrTT
',',
',"-,".-'r"i"'j'""t"i"'j"'["'-"i"'j--'[-'-:'""';-"[-":"-j"-I"'["':'--1--
- ...____,+++-, ,++++..__+++.+" ,.++_+__1_J....
- __..+,:::::!:::!::!!(60, 1.70:: 1,70
..
---:--"1""-
'-r----: ":"rr---rr-:--T'
'-rrTr---"1""T"rr--oro;r-r-"rrTT"'*""I'"",, I*,**,"" ,,', It'*>,**"""" jt, I*,,*" t I"""'"*,I" , ,**, ,.,."""""" 1 I , I**1.1***J:*:.:'**:l**f.:r****:I**I::I**'***J.:I**'***"*.:.r.I*:.!}:
i i: i: i!: i j!i i::!:;i i:::: j j i i!::I:::::::::::: ,:: i::::::::..L.L.,L.LL.L-L.L
-__
.._.LL..L..L....
_.L..L..LL,.ILTH.:":r jI:r'I:'L:rr:.:L:j.IIL.itl:.........IL"'0 1.68 Q>c:.2">co<b 1.66"-a.."'0:J en m1.64St.Lucie Unit 1 Cycle 22 COLR Rev 0 Page 6 of 13 St. Lucie Unit 1 -
Proposed COLR Figure 3.1-1a
()()()()+(()()()(+
(60, 1.65)
PC/M 08032, Rev 0 Attachment 14, Page 8 of 13 EOl Cycle Life UNACCEPTABLE OPERATIO (Fuel+Clad+Moderator)
FIGURE 3.2-1 Allowable Peak Linear Heat Rate vs.Burnup 13.0-l-.-.-
BOl16.0+"" ro (J)Im 15.0....
c::i::s:.ro (J)Q..(J).0 ro 14.0-3=o<<St.Lucie Unit 1 Cycle 22 COLR Rev 0 Page 8 of 13 St. Lucie Unit 1 -
Proposed COLR Figure 3.2-1(-)(+)
0538~00 ~9~1!8
~00~1!8 0.6 0.4 PC/M 08032, Rev 0 Attachment 14, Page 9 of 13-0.2 0.0 O.Peripheral AXIAL SHAPE INO (Not Applicable Below 40%Power)FIGURE 3.2-2 AXIAL SHAPE INDEX VS.Maximum Allowable Power Level AXIALSHAPEINDEX limits for Linear Heat Rate when using Exeo Monitoring System)a.4 a-1-,
-0.6 Note:<D><D.....J 0.90"-<D s: 0 Q..Q).0 0.80 co s: 0<<E::::J E'x co\f-0.60 0 c 0:;:::#u co"-0.50 LL St.lucie Unit 1 Cycle 22 COlR Rev 0 Page 9 of 13
~>St. Lucie Unit 1 -
Proposed COLR Figure 3.2-2~:)::<)+)-),)),)-)+.!
PC1M 08032 1 Rev 0 Attachment 14, Page 10 of 131.721.731.741.75 1.76 1.771.781.79 Measure FIGURE 3.2-Allowable Combinations of THERM POWER and F r T 1.71::;I::I: I:::::t::::::r:::::L::r::::
- r-::t::::-T----1------T----j----r----r------r------T:::t:::
......: I_..-1_Unacceptable Operation Reg on.).-:::::::-:1:::::::::::::::1::::-
- --'---T-
+----1-------1-------1-----+----r:::l::::::::::::
,.__1..
F r::;1.7*[1+0.47 x (1-P)].-_Ij:.....)1J.-i**-l--J--..-..;...I..-i**-..-.L-..)-.-..
..---.L--.
1:::::::t:::::::t::
i:::::
- 1:::::::
..
0.89): I: I: I: I: I: I i I:I: """: """r;-"'-"':"""*r-****.;--r.-.--.;.
1"'"**r******r-**
i--***-*i**-**--r***----:**----*
..A e: table a Re io:*******[******"["******:*******r****-1-******
- I: I: I:;I: I: I: I::::::T:::::)1:::::::
J::::::: r::::::j:::::::
[:::::::[::::::r:':::I:::::J:
- 1:::::::r:
- r::::::
- t::::::r:::
- r:::::I::::::::!: I: I: I: I: I: I: 1.7 a:: w S 0 a..-J<<a:: w I t-0.9 0 w l-<<0:::\f-0 0.8 c: 0 13 C\'S l0-U.Q)0.7..0 C\'S 3: 0<<---------------
St.Lucie Unit 1 Cycle 22 COLR Rev 0 Page 10 of 13 St. Lucie Unit 1 -
Proposed COLR Figure 3.2-3(1.79, 0.82)+@*
()
()(()()()+*()()()()() .