Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031390564 + (ML031390564)
- ML031390621 + (ML031390621)
- ML031390642 + (ML031390642)
- ML031400002 + (ML031400002)
- ML031400005 + (ML031400005)
- ML031400013 + (ML031400013)
- ML031400019 + (ML031400019)
- ML031400023 + (ML031400023)
- ML031400027 + (ML031400027)
- ML031400028 + (ML031400028)
- JAFP-03-0067, April 2003 Monthly Operating Report for James A. Fitzpatrick Nuclear Power Plant + (ML031400031)
- JAFP-03-0068, March 2003 Monthly Operating Report for James A. FitzPatrick, Revision 1 + (ML031400034)
- NOC-AE-02001396, Proposed Amendment to Technical Specification 3/4.6.2, Depressurization and Cooling Systems. + (ML031400044)
- ML031400044 + (ML031400044)
- 05000298/LER-2003-003, Failure to Evaluate Heat-up Rate Leads to Technical Specifications Prohibited Operation + (ML031400047)
- ML031400051 + (ML031400051)
- ML031400056 + (ML031400056)
- 05000528/LER-2003-002, Manual Reactor Trip Due to Degraded Main Condenser Tube Plug + (ML031400058)
- ML031400059 + (ML031400059)
- LIC-03-0068, Annual Update to Application for Renewed Operating License + (ML031400060)
- ML031400095 + (ML031400095)
- ML031400119 + (ML031400119)
- NL-03-1090, Organization and Correspondence Routine Changes + (ML031400131)
- NL-03-1091, Organization and Correspondence Routine Changes + (ML031400133)
- ML031400137 + (ML031400137)
- ML031400164 + (ML031400164)
- ML031400174 + (ML031400174)
- ML031400177 + (ML031400177)
- ML031400181 + (ML031400181)
- RBG-46125, April 2003 Monthly Operating Report for River Bend Station + (ML031400201)
- 05000445/LER-2003-002, Regarding Actuation of Reactor Protection System + (ML031400205)
- 05000530/LER-2003-001, Regarding Main Steam Safety Valve as Found Lift Pressures Outside of TS Limits + (ML031400210)
- ML031400212 + (ML031400212)
- PNO-IV-03-026, Comanche Peak Steam Electric Station: Shutdown Greater than 72 Hours + (ML031400271)
- ML031400314 + (ML031400314)
- ML031400319 + (ML031400319)
- ML031400334 + (ML031400334)
- JAFP-03-0065, Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/2002 + (ML031400335)
- NLS2003056, Emergency Plan Implementing Procedures for Cooper Nuclear Station + (ML031400336)
- ML031400342 + (ML031400342)
- ML031400343 + (ML031400343)
- GNRO-2003/00029, One Time Extension on Integrated Leak Rate Test & Drywell Bypass Test Interval + (ML031400345)
- DCL-03-052, Rev 0 to WCAP-15958, Analysis of Capsule V from Pacific Gas & Electric Co Diablo Canyon Unit 1 Reactor Vessel Radiation Surveillance Program, Appendix a Through E + (ML031400347)
- ML031400360 + (ML031400360)
- ML031400391 + (ML031400391)
- PLA-5625, Comment (29) Submitted by PPL Susquehanna, LLC, Bryce L. Shriver on Proposed Rule PR-170 and 171 Re Revision of Fee Schedules; Fee Recovery for Fy 2003 + (ML031400392)
- NLS2003032, Clarification of License Amendment 196 Safety Evaluation Information + (ML031400397)
- ML031400399 + (ML031400399)
- NOC-AE-03001450, Units - License Amendment Request for Approval of Change in Analytical Methodology + (ML031400401)
- ML031400401 + (ML031400401)
- NLS2003055, April 2003 Monthly Operating Report for Cooper Nuclear Station + (ML031400475)