Semantic search

Jump to navigation Jump to search
 Issue dateTitle
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
ML22144A00214 September 2022Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan
ML20055F06024 March 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML19227A39915 August 2019Notification of Conduct of a Triennial Fire Protection Baseline Inspection Report Nos. 05000250/2019012 and 05000251/2019012
ML17088A29512 April 2018COL Without Appendices
ML17088A31112 April 2018COL Without Appendices
ML17320A6405 December 2017Revised Draft - Combined License for Turkey Point Unit 6
ML17320A6485 December 2017Revised Draft - Combined License for Turkey Point Unit 7
ML16224B11811 August 2016Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000250/2016008 and 05000251/2016011
L-2015-278, St7Lucie, Units 1 and 2, Turkey Point Units 3 and 4, Seabrook, Duane Arnold, Point Beach Units 1 and 2 - Commitment to Maintain Severe Accident Management Guidelines17 December 2015St7Lucie, Units 1 and 2, Turkey Point Units 3 and 4, Seabrook, Duane Arnold, Point Beach Units 1 and 2 - Commitment to Maintain Severe Accident Management Guidelines
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
L-2014-071, Response to Request for Additional Information License Amendment Request No. 216 - Transition 10 CFR 50.48(c)-NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants(2001 Edition)4 April 2014Response to Request for Additional Information License Amendment Request No. 216 - Transition 10 CFR 50.48(c)-NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants(2001 Edition)
ML13088A14127 March 2013Notification of Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 05000250-13-007 and 05000251-13-007)
L-2012-092, License Amendment Request No. 216, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). Part 1 of 428 June 2012License Amendment Request No. 216, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). Part 1 of 4
NRC-2010-0135, Commission Memorandum and Order (CLI-11-05) Regarding Pr 52 AP1000 Design Certification Amendment9 September 2011Commission Memorandum and Order (CLI-11-05) Regarding Pr 52 AP1000 Design Certification Amendment
ML1125211069 September 2011Commission Memorandum and Order (CLI-11-05) Regarding Pr 52 ESBWR Design Certification Amendment
ML1125210399 September 2011Commission Memorandum and Order (CLI-11-05) Regarding Pr 52 AP1000 Design Certification Amendment
IR 05000250/20110061 September 2011Mid-Cycle Performance Review and Inspection Plan for Turkey Point Inspection Report 05000250-11-006 05000251-11-006 (DRS)
IR 05000250/201100327 July 2011IR 05000250-11-003 & 05000251-11-003; Florida Power & Light Company; on 04/01/2011 - 06/30/2011; Turkey Point Nuclear Plant, Unit 3 & 4, Equipment Alignment, NRC Integrated Inspection Report
L-2011-199, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Fire Protection Issues9 June 2011Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Fire Protection Issues
ML1115303282 June 2011Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision
IR 05000250/201101013 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000250/2011010, 05000251/2011010
ML0721201702 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026
L-2004-111, Recovery Plan Revision 613 May 2004Recovery Plan Revision 6
L-2003-201, NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors8 August 2003NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors
ML0321305581 August 2003Evaluation of Relief Request Concerning risk-informed Inservice Inspection
L-2003-139, Emergency Plan & Implementing Procedure Changes4 June 2003Emergency Plan & Implementing Procedure Changes
ML03279052818 April 2003Revised Emergency Procedures, Including 0-EPIP-20101, 0-EPIP-20104, 0-EPIP-1212, and 0-EPIP-20132
L-2002-022, Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection (RI-ISI) Relief Request for Turkey Point Unit 415 January 2003Response to Request for Additional Information Regarding Risk-Informed Inservice Inspection (RI-ISI) Relief Request for Turkey Point Unit 4
ML02350039816 December 2002Request for Additional Information Concerning Risk Informed Inservice Inspection
L-2002-074, Emergency Plan Implementing Procedure Changes2 May 2002Emergency Plan Implementing Procedure Changes
ML02043062411 February 2002Denial of Exemption Request for the Post-Accident Hydrogen Monitors and Request to Modify the Revised Confirmatory
ML17354A94322 May 1998Forwards Rev 34 to Turkey Point Radiological Emergency Plan & Rev 2 to Recovery Plan.Change Summary Included
ML17354A94727 April 1998Rev 2 to Turkey Point Nuclear Plant Recovery Plan.
ML17354A84823 March 1998Informs NRC That Util Completed Implementation of Severe Accident Mgt Guidelines on 970701,as Stated in Licensee 950201 Ltr
ML17354A88513 October 1997FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013.
ML17354A5683 July 1997Forwards Revs to EPIPs 0-EPIP-20132, Technical Support Ctr (TSC) Activation & Operation & 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training. Description of Revs,Attached
ML17354A3829 January 1997Forwards Startup Rept for Turkey Points Units 3 & 4 IAW TS 6.9.1.1 Which Consists of Changes to Allow Operation at Core Thermal Power Level of 2300 Mwt
ML17353A87228 August 1996Forwards Rev 30 to Turkey Point Plant Radiological Emergency Plan & Revised EPIPs