Semantic search

Jump to navigation Jump to search
 Start dateSiteTitle
ENS 5566020 October 2021 13:05:00Browns FerryInvalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 552871 April 2021 18:02:00Browns Ferry60-Day Telephonic Notification of Invalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 549761 November 2020 10:34:00CooperManual Reactor Trip Due to an Un-Isolable Leak on the Turbine High Pressure Fluid System
ENS 546979 March 2020 01:21:00Browns FerryInvalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 5433220 August 2019 16:33:00Browns Ferry60-Day Optional Telephonic Notification of Invalid Specified System Actuation
ENS 5418527 July 2019 23:29:00PerryAutomatic Reactor Scram Due to Main Turbine Trip
ENS 5434129 December 2018 07:20:00Browns FerryInvalid Actuation of a Signal Affecting More than One System
ENS 5367619 October 2018 05:00:00Duane ArnoldAutomatic Reactor Trip Due to Feedwater Regulating Valve Failing Closed
ENS 5377613 October 2018 05:00:00Cooper60-Day Optional Telephonic Notification of Invalid Specified System Actuation
ENS 5356527 August 2018 04:00:00Nine Mile PointEn Revision Imported Date 8/29/2018
ENS 5366116 August 2018 05:00:00Browns FerryInvalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 531921 February 2018 16:57:00River BendManual Reactor Scram
ENS 529506 September 2017 15:57:00Nine Mile PointAutomatic Reactor Scram on Low Reactor Vessel Water Level
ENS 5307010 January 2017 09:00:00Browns FerryInvalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 5075426 November 2014 20:27:00Browns FerryInvalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 506017 November 2014 13:47:00PerryAutomatic Reactor Scram Due to Loss of Feedwater
ENS 5055120 October 2014 06:18:00PerryAutomatic Reactor Scram on Loss of Feedwater
ENS 5053213 October 2014 23:35:00FitzPatrickHigh Pressure Core Injection Degraded Accident Mitigation Capability
ENS 506587 October 2014 15:35:00Browns FerryInvalid Specified System Actuation
ENS 5056527 August 2014 16:09:00Browns FerryInvalid Actuation of General Containment Isolation Signals
ENS 4994221 January 2014 13:46:00Browns Ferry60 Day Optional Telephone Notification of an Invalid Primary Containment Isolation Signal
ENS 490779 April 2013 10:06:00Browns Ferry60 Day Report of an Invalid Primary Containment System Isolation Signal
ENS 4869023 November 2012 10:35:00Browns FerryPrimary Containment Isolation Actuation Signal During Surveillance
ENS 484877 November 2012 14:21:00FermiManual Reactor Shutdown Due to Hydrogen In-Leakage to Stator Water Cooling System
ENS 484816 November 2012 05:06:00Nine Mile PointHigh Pressure Coolant Injection Actuation Signal
ENS 4858718 October 2012 05:01:00Browns Ferry60-Day Telephone Notification of an Invalid System Actuation
ENS 485689 October 2012 16:50:00Browns Ferry60-Day Telephonic Notification of an Invalid System Actuation
ENS 4850517 September 2012 09:12:00Browns Ferry60-Day Optional Telephonic Notification of Invalid Actuation of Containment Isolation Signals
ENS 4800611 April 2012 20:15:00Browns FerryInvalid System Actuation Resulting from Post Maintenance Testing
ENS 4767920 February 2012 01:04:00Grand GulfManual Reactor Scram During Shutdown Due to Lowering Reactor Vessel Water Level (Rvwl)
ENS 4688127 March 2011 01:05:00Browns Ferry60-Day Telephonic Notification of Invalid Primary Containment Isolation Signal Due to Maintenance
ENS 4635924 October 2010 20:41:00FermiAutomatic Reactor Scram Due to a Turbine Trip Resulting from a Low Condenser Vacuum
ENS 4591812 May 2010 03:18:00PerryManual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps
ENS 4586622 April 2010 14:51:00SusquehannaReactor Scram on Low Reactor Vessel Water Level During Feedwater Integrated Control System Testing
ENS 4578925 March 2010 20:27:00FermiAutomatic Reactor Shutdown Due to Main Turbine Trip
ENS 4548911 November 2009 23:43:00CooperManual Reactor Scram After a Turbine Hydraulic Fluid Leak
ENS 4542511 October 2009 11:50:00Palo VerdeReactor Water Level Indication Inoperable
ENS 4539430 September 2009 15:09:00FermiManual Reactor Shutdown Due to Hydrogen In-Leakage to Stator Water Cooling System
ENS 4539130 September 2009 04:23:00Browns FerryUnit 2 Manually Scrammed After Trip of an Operating Condensate Pump and Rapidly Lowering Rvwl
ENS 4528221 August 2009 14:52:00Browns FerryLogic for Common Accident Signal Is Flawed for Safe Shutdown Instruction
ENS 4494228 March 2009 05:46:00FermiReactor Scram Due to Mode Switch Being Placed in Shutdown Following High Vibration on Main Turbine #1 Bearing
ENS 444029 August 2008 07:04:00CooperManual Reactor Scram Due to Failure of Reheat Stop Valve to Open During Turbine Valve Testing
ENS 4394831 January 2008 20:44:00FermiManual Reactor Scram in Response to Trip of Both Reactor Recirc Pumps
ENS 4378415 November 2007 08:13:00FermiReactor Scram - Initiation of Ari Caused by Level 2 Signal
ENS 4378013 November 2007 11:32:00Three Mile IslandUnusual Event Declared Due to Unexpected Reactor Vessel Water Level Change During a Refueling Outage with Irradiated Fuel in the Core
ENS 4361030 August 2007 19:13:00Vermont YankeeAutomatic Reactor Scram on Turbine Stop Valve Closure
ENS 4349517 July 2007 09:22:00Oyster CreekAutomatic Reactor Scram on Low Reactor Vessel Water Level (Rvwl)
ENS 4331524 April 2007 06:10:00LimerickAutomatic Reactor Scram with Eccs Injection on Lowering Reactor Vessel Water Level
ENS 432712 April 2007 16:25:00Duane ArnoldManual Reactor Scram Due to Lowering Reactor Vessel Water Level
ENS 433333 March 2007 13:14:00LaSalleInvalid Eccs Actuation During Refueling Outage