Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-16-0030, Duke Energy Response to GL 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | 31 October 2016 | Duke Energy Response to GL 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools |
ML16019A029 | 9 February 2016 | Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1 |
BSEP 16-0001, Status of Confirmatory Evaluation for Unit 1, Cycle 21 | 13 January 2016 | Status of Confirmatory Evaluation for Unit 1, Cycle 21 |
BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 | 19 February 2015 | Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 |
ML15023A044 | 13 January 2015 | Submittal of Confirmatory Calculation for Unit 2, Cycle 22 |
BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395) | 13 January 2015 | Enclosure 3 - Areva Operability Assessment. (CR #2014-7395) |
ML14056A124 | 12 March 2014 | Request for Withholding Proprietary Information from Public Disclosure Related to Operability Assessment |
ML14036A100 | 27 January 2014 | Submittal of Confirmatory Evaluation for Unit 1 Cycle 20 |
ML13037A551 | 1 March 2013 | Issuance of Amendments Regarding Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2 |
BSEP 13-0004, Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation | 29 January 2013 | Operability Assessment (CR #2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation |
BSEP 13-0002, Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact | 14 January 2013 | Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact |
ML12305A198 | 20 December 2012 | Request for Withholding Information from Public Disclosure |
ML12300A381 | 5 December 2012 | Request for Withholding Information from Public Disclosure (TAC TAC ME8135 and ME8136) |
BSEP 12-0104, Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. To.. | 21 September 2012 | Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr), and Rev. To.. |
ML12251A142 | 29 August 2012 | Response to Request for Additional Information Re License Amendment Request for Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report, & Rev. to Tech Spec 2.1.1.2.. |
ML12223A196 | 9 August 2012 | NRR E-mail Capture - Brunswick Units 1 and 2- RAIs Regarding TSs 2.1.1.2 and 5.6.5 and Revising a License Condition (ME8135 and ME8136) |
ML12062A282 | 16 March 2012 | Request for Withholding Information from Public Disclosure |
ML12076A062 | 6 March 2012 | Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr) and Revision to Technical Specification 2.1.1.2 |
BSEP 12-0031, Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 | 29 February 2012 | Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 |
ML12076A064 | 17 February 2012 | Areva Document No. 51-9177315-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 11 to BSEP 12-0031 |
ML12076A086 | 17 February 2012 | Areva Document No. 51-9177316-000, Brunswick Unit 2 Cycle 20 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 17 to BSEP 12-0031 |
BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 19 | 26 January 2012 | Submittal of Confirmatory Evaluation for Cycle 19 |
BSEP 14-0007, 1707-01-F03, Rev. 3, Operability Assessment (CR2013-8241) | 8 September 2011 | 1707-01-F03, Rev. 3, Operability Assessment (CR#2013-8241) |
ML11097A013 | 15 April 2011 | Request for Withholding Information from Public Disclosure. |
ML11097A016 | 15 April 2011 | Request for Withholding Information from Public Disclosure |
ML11101A043 | 8 April 2011 | Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 (TAC Nos. ME3858 and ME3859) - Redacted |
BSEP 11-0040, Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me... | 6 April 2011 | Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me... |
BSEP 11-0028, Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | 7 March 2011 | Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue |
ML12251A145 | 18 October 2010 | Enclosure 9 to BSEP 12-0098, Areva Report No. 51-9177315-001, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment |
BSEP 12-0098, Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment | 18 October 2010 | Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment |
IR 05000324/2010003 | 27 July 2010 | IR 05000325-10-003 & 05000324-10-003 on 04/01/10 - 06/30/10 for Brunswick, Units 1 & 2 |
IR 05000324/2009003 | 5 February 2010 | IR 05000325-09-003 & 05000324-09-003, on 07/30/09, Brunswick Steam Electric Plant |
IR 05000324/2009011 | 24 November 2009 | IR 05000325-09-011, 05000324-09-011 on 09/27/2009 - 10/20/2009 for Brunswick Steam Electric Plant, Units 1 & 2 |
ML092110250 | 30 July 2009 | IR 05000325-09-003, 05000324-09-003, on 4/01/2009 - 6/30/2009, Brunswick Steam Electric Plant, Units 1 & 2; Refueling and Other Outage Activities |
IR 05000324/2009008 | 27 March 2009 | IR 05000325-09-008, 0500324-09-008, on 01/20/2009 - 03/06/2009, Brunswick Steam Electric Plant Unit 1 and Unit 2, Special Inspection |
ML072960488 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (4 of 4) |
IR 05000324/2005002 | 29 April 2005 | IR 05000325-05-002 & IR 05000324-05-002, on 01/01 - 03/31/2005, Brunswick Units 1 & 2. Problem Identification & Event Followup |
IR 05000324/2004009 | 7 January 2005 | IR 05000324-04-009; 12/06/2004 - 12/10/2004; Brunswick Steam Electric Plant, Unit 2; Supplemental Inspection IP 95001 for a White Finding in the Mitigating Systems Cornerstone |
IR 05000325/2004011 | 26 September 2004 | IR 05000325-04-011, on 08/23/2004 - 08/27/2004, Brunswick Steam Electric Plant, Unit 1; Special Inspection Report |
IR 05000324/2004002 | 19 April 2004 | IR 05000324-04-002 & 05000325-04-002, on 12/21/04 Through 03/20/04, for Brunswick Steam Electric Plant Units 1 & 2, Southport, Nc; Problem Identification & Resolution |
ML033240610 | 9 October 2003 | IR 05000325-03-008, IR 05000324-03-008, on 08/11-15/2003 and 08/25-29/2003, Brunswick Steam Electric Plant, Units 1 and 2; Safety System Design and Performance Capability |
IR 05000324/2001005 | 25 April 2002 | IR 05000324/2001-005 & 05000325/2001-005, Brunswick Steam Electric Plant, Inspection on 12/30/2001-03/30/2002. No Findings of Significance Identified |
ML20196E893 | 16 June 1999 | Rev 0 to 2B11-0001, Core Shroud B214R1 Structural Evaluation |
IR 05000324/1998009 | 9 November 1998 | Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support |
IR 05000324/1998005 | 1 June 1998 | Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support |
IR 05000324/1998003 | 13 April 1998 | Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors |
ML20217E703 | 28 February 1998 | Rev 2 to ESR 97-00034, Engineering Evaluation B213R1 Core Shroud Insps |
ML20203M014 | 19 February 1998 | Rev 1 to ESR 9700706, Unit 1 Core Shroud Insp Results |
ML20197A928 | 12 February 1998 | Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake |
BSEP-97-0538, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108.Corrective Actions:Review Performed to Determine If Other Potential Areas Existed Where Water Could Be Introduced | 7 January 1998 | Responds to NRC Re Violations Noted in Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108.Corrective Actions:Review Performed to Determine If Other Potential Areas Existed Where Water Could Be Introduced |