Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21266A011 | 5 October 2021 | Staff Evaluation Related to Aging Management Program and Inspection Plan of Reactor Vessel Internals Per MRP-227, Revision 1-A |
RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A | 15 October 2020 | Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A |
ML20174A045 | 4 August 2020 | Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits |
ML20106E946 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20106E913 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables |
ML20106E923 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML20106E908 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems |
ML20106E914 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant and Connected Systems |
RA-20-0002, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits | 13 February 2020 | Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits |
RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits | 1 July 2019 | License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits |
CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report | 29 June 2017 | Mid-Cycle Power Uprate Ascension Startup Report |
ML16159A336 | 19 July 2016 | Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) |
CNS-16-045, Unit 2, Ufsar/Selected Licensee Commitment Changes | 14 June 2016 | Unit 2, Ufsar/Selected Licensee Commitment Changes |
ML16081A333 | 29 April 2016 | Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate |
ML16097A227 | 5 April 2016 | E-mail from J. Whited to L. Rudy Catawba Nuclear Station Draft SE Request for Approval of Measurement Uncertainty Recapture Uprate |
ML16102A156 | 11 March 2016 | Proposed Technical Specifications Amendments, TS 3.4.1, Reactor Coolant System Pressure, Temperature and Flow Departure from Nucleate Boiling Limits, Response to NRC Request for Additional Information |
ML16007A190 | 20 January 2016 | Request for Additional Information Regarding License Amendment Request to Change the RCS Minimum Required Flow Rates |
CNS-15-078, WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations | 30 November 2015 | WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations |
ML15324A083 | 16 November 2015 | License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate, Response to NRC Requests for Additional Information (Rais) |
ML15201A512 | 13 August 2015 | Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba, Unit 1 |
ML15203A490 | 21 July 2015 | Modification No. 001 to Task Order No. NRC-HQ-20-15-T-0014 Under Contract No. NRC-HQ-2514-D-0002 |
RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 | 15 July 2015 | License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 |
RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot | 15 July 2015 | Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn |
ML15141A099 | 20 May 2015 | NRR E-mail Capture - Presentation Slides for Duke Public Meeting |
CNS-15-049, Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations | 11 May 2015 | Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations |
IR 05000413/2015001 | 29 April 2015 | IR 05000413/2015001, 05000414/2015001; 01/01/2015 03/31/2015; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection Report |
CNS-15-024, WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations. | 23 April 2015 | WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations. |
ML15117A011 | 23 April 2015 | Response to NRC Requests for Additional Information (Rais) on License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate |
ML15027A366 | 25 March 2015 | Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML15030A460 | 9 February 2015 | Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate |
RA-15-0005, Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees | 5 February 2015 | Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees |
CNS-15-007, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate - Response to NRC Requests for Additional Information (Rals) | 22 January 2015 | License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate - Response to NRC Requests for Additional Information (Rals) |
ML15008A273 | 8 January 2015 | NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch) |
ML14353A027 | 15 December 2014 | License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate/Response to NRC Requests for Additional Information (Rals) |
ML14325A667 | 26 November 2014 | Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba, Unit 1 |
ML14303A279 | 4 November 2014 | Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba Unit 1 |
ML14253A477 | 10 September 2014 | NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch) |
ML14246A455 | 8 September 2014 | Acceptance Review of License Amendment Request Measurement Uncertainty Recapture Power Uprate |
CNS-14-098, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate | 26 August 2014 | License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate |
CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations | 30 June 2014 | WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations |
CNS-14-081, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI) | 27 June 2014 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI) |
CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate | 23 June 2014 | License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate |
ML14128A352 | 22 May 2014 | RAI LAR Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML14063A278 | 25 February 2014 | Duke Energy Carolinas, LLC (Duke Energy): Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model |
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology | 14 November 2013 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML12314A031 | 16 November 2012 | Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3)(ii) Re Significant ECCS Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation |
ML12079A180 | 16 March 2012 | Response to Information Request Pursuant to 10 CFR 50.54(f) Related to Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in Westinghouse-Furnished Realistic.. |