ML21266A0115 October 2021Staff Evaluation Related to Aging Management Program and Inspection Plan of Reactor Vessel Internals Per MRP-227, Revision 1-A
RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A15 October 2020Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A
ML20174A0454 August 2020Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits
ML20106E9462 April 20201 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML20106E9132 April 20201 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables
ML20106E9232 April 20201 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20106E9082 April 20201 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems
ML20106E9142 April 20201 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant and Connected Systems
RA-20-0002, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits13 February 2020Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits
RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits1 July 2019License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits
CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report29 June 2017Mid-Cycle Power Uprate Ascension Startup Report
ML16159A33619 July 2016Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486)
CNS-16-045, Unit 2, Ufsar/Selected Licensee Commitment Changes14 June 2016Unit 2, Ufsar/Selected Licensee Commitment Changes
ML16081A33329 April 2016Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate
ML16097A2275 April 2016E-mail from J. Whited to L. Rudy Catawba Nuclear Station Draft SE Request for Approval of Measurement Uncertainty Recapture Uprate
ML16102A15611 March 2016Proposed Technical Specifications Amendments, TS 3.4.1, Reactor Coolant System Pressure, Temperature and Flow Departure from Nucleate Boiling Limits, Response to NRC Request for Additional Information
ML16007A19020 January 2016Request for Additional Information Regarding License Amendment Request to Change the RCS Minimum Required Flow Rates
CNS-15-078, WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations30 November 2015WCAP-18060-NP, Revision 1, Response to RAIs Concerning the Use of RAPTOR-M3G for the Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations
ML15324A08316 November 2015License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate, Response to NRC Requests for Additional Information (Rais)
ML15201A51213 August 2015Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba, Unit 1
ML15203A49021 July 2015Modification No. 001 to Task Order No. NRC-HQ-20-15-T-0014 Under Contract No. NRC-HQ-2514-D-0002
RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 1115 July 2015License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11
RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot15 July 2015Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn
ML15141A09920 May 2015NRR E-mail Capture - Presentation Slides for Duke Public Meeting
CNS-15-049, Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations11 May 2015Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations
IR 05000413/201500129 April 2015IR 05000413/2015001, 05000414/2015001; 01/01/2015 03/31/2015; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection Report
CNS-15-024, WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations.23 April 2015WCAP-17993-NP, Revision 0-B, Justification for the Use of RAPTOR-M3G for the Catawba, Unit 1, Measurement Uncertainty Recapture (Mur) Power Uprate Fluence Evaluations.
ML15117A01123 April 2015Response to NRC Requests for Additional Information (Rais) on License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate
ML15027A36625 March 2015Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology
ML15030A4609 February 2015Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate
RA-15-0005, Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees5 February 2015Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees
CNS-15-007, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate - Response to NRC Requests for Additional Information (Rals)22 January 2015License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate - Response to NRC Requests for Additional Information (Rals)
ML15008A2738 January 2015NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch)
ML14353A02715 December 2014License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate/Response to NRC Requests for Additional Information (Rals)
ML14325A66726 November 2014Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba, Unit 1
ML14303A2794 November 2014Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba Unit 1
ML14253A47710 September 2014NRR E-mail Capture - Draft RAI for Mur (Steam Generator Branch)
ML14246A4558 September 2014Acceptance Review of License Amendment Request Measurement Uncertainty Recapture Power Uprate
CNS-14-098, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate26 August 2014License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate
CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations30 June 2014WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations
CNS-14-081, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI)27 June 2014License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI)
CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate23 June 2014License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate
ML14128A35222 May 2014RAI LAR Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology
ML14063A27825 February 2014Duke Energy Carolinas, LLC (Duke Energy): Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology14 November 2013License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology
ML12314A03116 November 2012Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3)(ii) Re Significant ECCS Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation
ML12079A18016 March 2012Response to Information Request Pursuant to 10 CFR 50.54(f) Related to Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in Westinghouse-Furnished Realistic..