Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21343A200 | 20 December 2021 | Authorization and Safety Evaluation for Alternative from Certain Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code of Buried Service Water Piping (EPID L-2021-LLR-0014) (Non-Proprieta |
RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping | 4 October 2021 | Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping |
ML21239A065 | 8 September 2021 | Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - Public |
ML19284C833 | 21 November 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
ML18172A258 | 18 September 2018 | Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+) |
ML16257A411 | 31 July 2016 | DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. |
BSEP 16-0024, Notification of Full Compliance with Order EA-12-049, and Order EA-12-051 | 19 May 2016 | Notification of Full Compliance with Order EA-12-049, and Order EA-12-051 |
BSEP 15-0100, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 11 December 2015 | Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML15049A266 | 10 March 2015 | Plan, Units 1 and 2 - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) |
BSEP 14-0066, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 26 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A | 31 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid |
ML13220A090 | 22 November 2013 | Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies |
ML13317A592 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 |
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 27 November 2012 | Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
BSEP 11-0028, Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | 7 March 2011 | Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue |
IR 05000324/2010009 | 23 November 2010 | IR 05000325-10-009, 05000324-10-009, & 07200006-10-003, on 09/20/10 - 10/8/10, Brunswick Steam Electric Plant, Units 1 & 2, Spent Fuel Pre-loading Demonstration & Initial Loading of the Independent Spent Fuel Storage Installation (ISFSI) |
ML072960488 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (4 of 4) |
BSEP 02-0146, Request for License Amendment Revision to License Condition - Alternative Source Term | 16 September 2002 | Request for License Amendment Revision to License Condition - Alternative Source Term |
BSEP 02-0016, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | 24 January 2002 | Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term |
ML20210N234 | 5 August 1999 | SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 |
ML20197A928 | 12 February 1998 | Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake |
BSEP-98-0017, Forwards Response to Telcon RAI Re 971106 Proposed License Amends Revising,For Limited Period of Time,Design Basis Qualification Requirements for CREVS & Crev Instrumentation. Calculations,Emergency Procedures & Plant Procedures Encl | 28 January 1998 | Forwards Response to Telcon RAI Re 971106 Proposed License Amends Revising,For Limited Period of Time,Design Basis Qualification Requirements for CREVS & Crev Instrumentation. Calculations,Emergency Procedures & Plant Procedures Encl |
BSEP-97-0454, Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time | 6 November 1997 | Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time |
ML20217H844 | 22 July 1997 | Rev 0 to 97-00362, IF-300 Cask Design,Testing & Insp |
ML20092G395 | 30 September 1995 | Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Seismic Evaluation Rept, Final Rept |
ML20092G389 | 30 September 1995 | Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept, Final Rept |
ML19204A209 | 30 June 1995 | Individual Plant Examination for External Events Submittal - Final Report |
ML20072M857 | 29 March 1994 | Rev 0 to Plan Mod 94-0077, Unit 2 Core Shroud Mod |
ML20058M445 | 31 December 1993 | Shroud Repair Hardware Stress Analysis, Rev 1 |
IR 05000324/1993045 | 21 October 1993 | Insp Repts 50-324/93-45 & 50-325/93-45 on 930920-24.No Violations Noted.Major Areas Inspected:Structural Steel Verification Program,Repairs to Unit 1 Drywell Liner,Control of Maint Trouble Tickets & Structural Integrity Items |
ML20046C385 | 31 July 1993 | Core Spray Crack Analysis for Bsep,Unit 1. |
ML20128B419 | 25 January 1993 | Provides Addl Info in Response to NRC Re Steam Electric Detection Instrumentation Numac Upgrade.Rev 001 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic, RWCU & RHR, Encl |
PM-92-108, Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements | 8 January 1993 | Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements |
ML20128H832 | 19 December 1992 | Rev 1 to Design Basis Document DBD-37, Control Building, Heating,Ventilating & Air Conditioning Sys |
ML20116P172 | 17 November 1992 | Forwards Responses to Questions Documented in NRC Relating to Util 920716 Submittal Re Seismic Qualification Issues,Per 920806 & 11 Telcons.Technical Evaluation Repts Encl |
ML20115A986 | 9 October 1992 | Forwards Response to NRC 920817 Telcon Request for Addl Info Re Svc Water Pump Seismic Qualification,As Followup to Util 920716 Submittal |
ML20101T963 | 16 July 1992 | Forwards Study Rept Criteria for Evaluating & Performing Computerized Piping Analyses of Existing Sys W/Minor Modifications (Applicable for NRC Bulletins IE 79-07 & 79-14), in Response to NRC RAI Re Masonry Block Walls |
ML20095G086 | 21 April 1992 | Requests Temporary Waiver of Compliance from TS 3.0.3 Based on Seismic Inoperability of Diesel Generator Bldg Wall 9d Due to Improperly Installed &/Or Missing Anchor Bolts |
ML20101A073 | 15 April 1992 | Forwards Response to NRC Containing Questions Re Masonry Block Walls at Facilities.Special Test Procedure 79-022 Written for Testing Concrete Expansion Anchors in Place to Ensure Anchors Meet or Exceed Design Strength |
ML20046A320 | 27 March 1992 | Rev 2 to SWS Hydraulic Analysis Rept for Bsep,Units 1 & 2. |
IR 05000324/1989022 | 22 September 1989 | Revised Pages to Insp Repts 50-324/89-22 & 50-325/89-22 |
ML20247D724 | 6 September 1989 | Insp Repts 50-324/89-22 & 50-325/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Open Items,Especially Issue of Svc Water Lube Water Support Operability |
ML20101T979 | 28 July 1989 | Study Rept Criteria for Evaluating & Performing Computerized Piping Analyses of Existing Sys W/Minor Modifications (Applicable for NRC Bulletins IE 79-07 & 79-14) |
IR 05000324/1989015 | 12 July 1989 | Insp Repts 50-325/89-15 & 50-324/89-15 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Rcic, F013 Valve Replacement,Temporary Instruction 2500/27,IE Bulletin 88-05,inspector Identified Items & LERs |
ML20235W216 | 27 February 1989 | Insp Repts 50-324/89-02 & 50-325/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Flow Restricting Orifices & Onsite LER Review |
ML20206B714 | 4 November 1988 | Requests Exemption from Requirements of ASME Boiler & Pressure Vessel Code,Section Xi.Fee Paid |