 Issue dateTitle
ML21343A20020 December 2021Authorization and Safety Evaluation for Alternative from Certain Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code of Buried Service Water Piping (EPID L-2021-LLR-0014) (Non-Proprieta
RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping4 October 2021Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping
ML21239A0658 September 2021Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - Public
ML19284C83321 November 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109
ML18172A25818 September 2018Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+)
ML16257A41131 July 2016DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus.
BSEP 16-0024, Notification of Full Compliance with Order EA-12-049, and Order EA-12-05119 May 2016Notification of Full Compliance with Order EA-12-049, and Order EA-12-051
BSEP 15-0100, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions11 December 2015Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML15049A26610 March 2015Plan, Units 1 and 2 - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents)
BSEP 14-0066, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)26 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid
ML13220A09022 November 2013Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML13317A59220 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident27 November 2012Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
BSEP 11-0028, Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue7 March 2011Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue
IR 05000324/201000923 November 2010IR 05000325-10-009, 05000324-10-009, & 07200006-10-003, on 09/20/10 - 10/8/10, Brunswick Steam Electric Plant, Units 1 & 2, Spent Fuel Pre-loading Demonstration & Initial Loading of the Independent Spent Fuel Storage Installation (ISFSI)
ML07296048831 January 2007July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (4 of 4)
BSEP 02-0146, Request for License Amendment Revision to License Condition - Alternative Source Term16 September 2002Request for License Amendment Revision to License Condition - Alternative Source Term
BSEP 02-0016, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term24 January 2002Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term
ML20210N2345 August 1999SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46
ML20197A92812 February 1998Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake
BSEP-98-0017, Forwards Response to Telcon RAI Re 971106 Proposed License Amends Revising,For Limited Period of Time,Design Basis Qualification Requirements for CREVS & Crev Instrumentation. Calculations,Emergency Procedures & Plant Procedures Encl28 January 1998Forwards Response to Telcon RAI Re 971106 Proposed License Amends Revising,For Limited Period of Time,Design Basis Qualification Requirements for CREVS & Crev Instrumentation. Calculations,Emergency Procedures & Plant Procedures Encl
BSEP-97-0454, Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time6 November 1997Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time
ML20217H84422 July 1997Rev 0 to 97-00362, IF-300 Cask Design,Testing & Insp
ML20092G39530 September 1995Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Seismic Evaluation Rept, Final Rept
ML20092G38930 September 1995Rev 0 to Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept, Final Rept
ML19204A20930 June 1995Individual Plant Examination for External Events Submittal - Final Report
ML20072M85729 March 1994Rev 0 to Plan Mod 94-0077, Unit 2 Core Shroud Mod
ML20058M44531 December 1993Shroud Repair Hardware Stress Analysis, Rev 1
IR 05000324/199304521 October 1993Insp Repts 50-324/93-45 & 50-325/93-45 on 930920-24.No Violations Noted.Major Areas Inspected:Structural Steel Verification Program,Repairs to Unit 1 Drywell Liner,Control of Maint Trouble Tickets & Structural Integrity Items
ML20046C38531 July 1993Core Spray Crack Analysis for Bsep,Unit 1.
ML20128B41925 January 1993Provides Addl Info in Response to NRC Re Steam Electric Detection Instrumentation Numac Upgrade.Rev 001 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic, RWCU & RHR, Encl
PM-92-108, Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements8 January 1993Rev 2 to Plant Mod PM 92-108, Cbeaf Improvements
ML20128H83219 December 1992Rev 1 to Design Basis Document DBD-37, Control Building, Heating,Ventilating & Air Conditioning Sys
ML20116P17217 November 1992Forwards Responses to Questions Documented in NRC Relating to Util 920716 Submittal Re Seismic Qualification Issues,Per 920806 & 11 Telcons.Technical Evaluation Repts Encl
ML20115A9869 October 1992Forwards Response to NRC 920817 Telcon Request for Addl Info Re Svc Water Pump Seismic Qualification,As Followup to Util 920716 Submittal
ML20101T96316 July 1992Forwards Study Rept Criteria for Evaluating & Performing Computerized Piping Analyses of Existing Sys W/Minor Modifications (Applicable for NRC Bulletins IE 79-07 & 79-14), in Response to NRC RAI Re Masonry Block Walls
ML20095G08621 April 1992Requests Temporary Waiver of Compliance from TS 3.0.3 Based on Seismic Inoperability of Diesel Generator Bldg Wall 9d Due to Improperly Installed &/Or Missing Anchor Bolts
ML20101A07315 April 1992Forwards Response to NRC Containing Questions Re Masonry Block Walls at Facilities.Special Test Procedure 79-022 Written for Testing Concrete Expansion Anchors in Place to Ensure Anchors Meet or Exceed Design Strength
ML20046A32027 March 1992Rev 2 to SWS Hydraulic Analysis Rept for Bsep,Units 1 & 2.
IR 05000324/198902222 September 1989Revised Pages to Insp Repts 50-324/89-22 & 50-325/89-22
ML20247D7246 September 1989Insp Repts 50-324/89-22 & 50-325/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Open Items,Especially Issue of Svc Water Lube Water Support Operability
ML20101T97928 July 1989Study Rept Criteria for Evaluating & Performing Computerized Piping Analyses of Existing Sys W/Minor Modifications (Applicable for NRC Bulletins IE 79-07 & 79-14)
IR 05000324/198901512 July 1989Insp Repts 50-325/89-15 & 50-324/89-15 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Rcic, F013 Valve Replacement,Temporary Instruction 2500/27,IE Bulletin 88-05,inspector Identified Items & LERs
ML20235W21627 February 1989Insp Repts 50-324/89-02 & 50-325/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Flow Restricting Orifices & Onsite LER Review
ML20206B7144 November 1988Requests Exemption from Requirements of ASME Boiler & Pressure Vessel Code,Section Xi.Fee Paid