Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000413/202300225 July 2023Integrated Inspection Report 05000413/2023002 and 05000414/2023002
IR 05000413/20230015 May 2023Integrated Inspection Report 05000413/2023001 and 05000414/2023001
ML20106E9022 April 20201 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Station
ML20106E9462 April 20201 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML20106E9292 April 20201 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML20106E9412 April 20201 to Updated Final Safety Analysis Report, Chapter 14, Tables
ML18278A28010 October 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018
RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating8 October 2018Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating
ML16124A6942 June 2016Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits
ML16102A15611 March 2016Proposed Technical Specifications Amendments, TS 3.4.1, Reactor Coolant System Pressure, Temperature and Flow Departure from Nucleate Boiling Limits, Response to NRC Request for Additional Information
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology14 November 2013License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology
ML12356A44017 December 2012301 Draft RO Written Exam
IR 05000413/201000429 October 2010IR 05000413-10-004, 05000414-10-004, 7/1/2010 - 9/30/2010, Catawba Nuclear Station, Units 1 and 2, Fire Protection
ML16102A15930 September 2010DPC-NE-3002-A Rev 4b, UFSAR Chapter 15 System Transient Analysis Methodology.
ML1025301339 June 2010Exercise - March 9, 2010 Final Report - Radiological Emergency Preparedness Program
ML10118024922 April 20102009 10CFR50.59 Summary Report
ML13071A63221 February 2010Monthly Operating Reports Data
ML16102A15831 May 2009DPC-NE-3001-A, Rev 0a, Multidimensional Reactor Transients & Safety Analysis Physics Parameters Methodology.
IR 05000413/200900228 April 2009IR 05000413-09-002, 05000414-09-002, on 01/01/2009 - 03/31/2008, Catawba Nuclear Station, Units 1 and 2; Design Control Integrated Inspection
IR 05000413/200600212 May 2006IR 05000413-06-002, 05000414-06-002; 1/1/2006 - 3/31/2006; Catawba Nuclear Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Evaluation and Other Activities
ML06067043628 February 2006LTR-CDME-06-17-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2 in Support of Cycle 15 Operation.
ML05363014531 December 2005LTR-CDME-05-180-NP, Rev 2, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2.
IR 05000413/200300516 January 2004IR 05000413-03-005 & 05000414-03-005, on 09/28/03 Through 12/20/03, for Catawba Nuclear Station; Maintenance Effectiveness, Post-Maintenance & Surveillance Testing & Other Activities
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.
ML20206T47731 May 1999Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology
ML20203L6309 February 1998Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support
ML20203J85831 January 1998Rev 2 to Catawba Nuclear Station PRA Summary Rept, for Jan 1998.W/one Diskette
ML20202D19231 December 1997Rev 2 to UFSAR Chapter 15 Transient Analysis Methodology
ML20197F28619 December 1997Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
Information Notice 1996-45, Potential Common-Mode Post-Accident Failure of Containment Coolers12 August 1996Potential Common-Mode Post-Accident Failure of Containment Coolers
ML20091L36218 August 1995Forwards Responses to NRC 950725 RAI Re DPC 940718 Submittal of Rev 1 to TR DPC-3002, FSAR Chapter 15 Sys Transient Analysis Methodology
IR 05000413/19930271 December 1993Insp Repts 50-413/93-27 & 50-414/93-27 on 931003-1106.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Previous Insp Findings & Licensee Event Repts
ML20059M26331 October 1993Monthly Operating Repts for Oct 1993 for Catawba Nuclear Station
ML20114A97130 November 1991FSAR Chapter 15 Sys Transient Analysis Methodology
ML20148D97614 January 1988Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Summary of Schedule for Responding to Bulletin for McGuire & Catawba Stated
NRC Generic Letter 1987-1612 November 1987NRC Generic Letter 1987-016: Transmittal of NUREG-1262, Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses
ML20214T4062 June 1987Safety Evaluation Supporting Util 860424 Submittal Re Turbine Sys Maint Program for Early Detection of Cracking in Low Pressure Turbine Wheels
ML20138L77517 December 1985Forwards Rev 14 to FSAR to Aid in NRC Review of FSAR Re Licensing of Unit 2.Rev Will Be Submitted as Amend 36 to Application for Licenses in Jan 1986
ML20083K62211 April 1984Affidavit of PM Abraham & WR Mccollum Supporting Motion for License to Load Fuel & to Conduct Certain Precritical Tests