Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000413/2023002 | 25 July 2023 | Integrated Inspection Report 05000413/2023002 and 05000414/2023002 |
IR 05000413/2023001 | 5 May 2023 | Integrated Inspection Report 05000413/2023001 and 05000414/2023001 |
ML20106E902 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Station |
ML20106E946 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20106E929 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML20106E941 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 14, Tables |
ML18278A280 | 10 October 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 |
RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating | 8 October 2018 | Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating |
ML16124A694 | 2 June 2016 | Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits |
ML16102A156 | 11 March 2016 | Proposed Technical Specifications Amendments, TS 3.4.1, Reactor Coolant System Pressure, Temperature and Flow Departure from Nucleate Boiling Limits, Response to NRC Request for Additional Information |
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology | 14 November 2013 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML12356A440 | 17 December 2012 | 301 Draft RO Written Exam |
IR 05000413/2010004 | 29 October 2010 | IR 05000413-10-004, 05000414-10-004, 7/1/2010 - 9/30/2010, Catawba Nuclear Station, Units 1 and 2, Fire Protection |
ML16102A159 | 30 September 2010 | DPC-NE-3002-A Rev 4b, UFSAR Chapter 15 System Transient Analysis Methodology. |
ML102530133 | 9 June 2010 | Exercise - March 9, 2010 Final Report - Radiological Emergency Preparedness Program |
ML101180249 | 22 April 2010 | 2009 10CFR50.59 Summary Report |
ML13071A632 | 21 February 2010 | Monthly Operating Reports Data |
ML16102A158 | 31 May 2009 | DPC-NE-3001-A, Rev 0a, Multidimensional Reactor Transients & Safety Analysis Physics Parameters Methodology. |
IR 05000413/2009002 | 28 April 2009 | IR 05000413-09-002, 05000414-09-002, on 01/01/2009 - 03/31/2008, Catawba Nuclear Station, Units 1 and 2; Design Control Integrated Inspection |
IR 05000413/2006002 | 12 May 2006 | IR 05000413-06-002, 05000414-06-002; 1/1/2006 - 3/31/2006; Catawba Nuclear Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Evaluation and Other Activities |
ML060670436 | 28 February 2006 | LTR-CDME-06-17-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2 in Support of Cycle 15 Operation. |
ML053630145 | 31 December 2005 | LTR-CDME-05-180-NP, Rev 2, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2. |
IR 05000413/2003005 | 16 January 2004 | IR 05000413-03-005 & 05000414-03-005, on 09/28/03 Through 12/20/03, for Catawba Nuclear Station; Maintenance Effectiveness, Post-Maintenance & Surveillance Testing & Other Activities |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. |
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology |
ML20203L630 | 9 February 1998 | Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support |
ML20203J858 | 31 January 1998 | Rev 2 to Catawba Nuclear Station PRA Summary Rept, for Jan 1998.W/one Diskette |
ML20202D192 | 31 December 1997 | Rev 2 to UFSAR Chapter 15 Transient Analysis Methodology |
ML20197F286 | 19 December 1997 | Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
Information Notice 1996-45, Potential Common-Mode Post-Accident Failure of Containment Coolers | 12 August 1996 | Potential Common-Mode Post-Accident Failure of Containment Coolers |
ML20091L362 | 18 August 1995 | Forwards Responses to NRC 950725 RAI Re DPC 940718 Submittal of Rev 1 to TR DPC-3002, FSAR Chapter 15 Sys Transient Analysis Methodology |
IR 05000413/1993027 | 1 December 1993 | Insp Repts 50-413/93-27 & 50-414/93-27 on 931003-1106.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Previous Insp Findings & Licensee Event Repts |
ML20059M263 | 31 October 1993 | Monthly Operating Repts for Oct 1993 for Catawba Nuclear Station |
ML20114A971 | 30 November 1991 | FSAR Chapter 15 Sys Transient Analysis Methodology |
ML20148D976 | 14 January 1988 | Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Summary of Schedule for Responding to Bulletin for McGuire & Catawba Stated |
NRC Generic Letter 1987-16 | 12 November 1987 | NRC Generic Letter 1987-016: Transmittal of NUREG-1262, Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses |
ML20214T406 | 2 June 1987 | Safety Evaluation Supporting Util 860424 Submittal Re Turbine Sys Maint Program for Early Detection of Cracking in Low Pressure Turbine Wheels |
ML20138L775 | 17 December 1985 | Forwards Rev 14 to FSAR to Aid in NRC Review of FSAR Re Licensing of Unit 2.Rev Will Be Submitted as Amend 36 to Application for Licenses in Jan 1986 |
ML20083K622 | 11 April 1984 | Affidavit of PM Abraham & WR Mccollum Supporting Motion for License to Load Fuel & to Conduct Certain Precritical Tests |