Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20073F186 | 6 March 2020 | Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) |
ML18278A280 | 10 October 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 |
IR 05000324/2018001 | 2 May 2018 | NRC Integrated Inspection Report 05000325/2018001 and 05000324/2018001 |
ML17024A036 | 31 December 2016 | Operating Data Report for 2016 |
BSEP 15-0008, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 27 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
IR 05000324/2013003 | 8 August 2013 | Integrated Inspection Report 05000325/13-003 and 05000324-13-003 |
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
IR 05000324/2012005 | 8 February 2013 | IR 05000325-12-005 & 05000324-12-005, 10/01/12 - 12/31/12, Brunswick Steam Electric Plant, Units 1 & 2, Post Maintenance Testing, Follow-up of Events, and Other Activities |
ML111020321 | 6 April 2011 | Initial Exam 2010-302 Draft SRO Written Exam |
ML13071A632 | 21 February 2010 | Monthly Operating Reports Data |
IR 05000324/2009011 | 24 November 2009 | IR 05000325-09-011, 05000324-09-011 on 09/27/2009 - 10/20/2009 for Brunswick Steam Electric Plant, Units 1 & 2 |
BSEP 09-0034, Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 2009 | 31 January 2009 | Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 2009 |
ML072960463 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (3 of 4) |
ML072960448 | 31 January 2007 | July-August Exam 50-325, 324/2007301 Draft Simulator Scenarios (2 of 4) |
IR 05000324/1999002 | 26 April 1999 | Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support |
BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 | 30 June 1997 | Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 |
BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 | 30 September 1996 | Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 |
BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 | 31 August 1996 | Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 |
Information Notice 1996-45, Potential Common-Mode Post-Accident Failure of Containment Coolers | 12 August 1996 | Potential Common-Mode Post-Accident Failure of Containment Coolers |
ML20091C286 | 31 July 1991 | Forwards Response to Request for Addl Info on 910324 Simulator Certification Submittal,Per NRC , Informing of Initial Review of Subj Submittal |
ML20006B601 | 26 January 1990 | Responds to Violation Noted in Insp Repts 50-324/89-40 & 50-325/89-40.Corrective Actions:Plant Mods 89-104 & 89-103 Have Been Installed in Unit 2 & Partially Installed in Unit 1 & Interim Operability Has Been Established |
ML20247G555 | 29 March 1989 | Application for Amends to Licenses DPR-62 & DPR-71, Implementing Expanded Operating Domain for Plant.Expansion Requires APRM Mods Designed to Upgrade rod-block Monitor Sys to Permit More Direct Thermal Limits Administration |
NRC Generic Letter 1987-16 | 12 November 1987 | NRC Generic Letter 1987-016: Transmittal of NUREG-1262, Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses |
ML20024F182 | 30 August 1983 | LER 83-064/03L-0:on 830709,during PT-12.1.1,w/diesel Generator 1 Already Tripped,Generator 2 Tripped on Generator Reverse Power.During PT-12.2b,generator 2 Inoperable When Svc Water Valve Would Not open.W/830830 Ltr |
ML19296C617 | 31 January 1980 | Supplemental Reload Licensing Submittal for Reload 3. |
ML19259B803 | 1 March 1979 | Suppl Reload Licensing Submittal,Reload 2 (Recirculation Pump Trip Feature), Revision 1 |
ML19259B414 | 31 January 1979 | Suppl Reload Licensing Submittal for Brunswick Steam Electric Plant Unit 2,Reload 2 (Recirculation Pump Trip Feature). |
ML19322A061 | 28 December 1978 | Mark I Containment Program Load Definition Rept. Provides Info to Define Hydrodynamic Loads Produced on Containment Sys of Domestic Mark I Plants During Locas,Safety/Relief Valve Discharges & Related Dynamic Events |
ML20010C659 | 27 February 1975 | Forwards Util Positions on QA Guidance Contained in Wash 1284,WASH 1309 & Wash 1283.Related Info Encl |