Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML20240A294 | 27 August 2020 | Davis Besse Perry | July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant |
L-18-093, Response to NRC Inspection Report 05000346/2018010, EA-18-008 | 16 March 2018 | Davis Besse | Response to NRC Inspection Report 05000346/2018010, EA-18-008 |
ML18093A461 | 16 March 2018 | Davis Besse | Response to NRC Inspection Report 05000346/2018010, EA-18-008 |
SVPLTR 15-0052, Response to Preliminary White Finding | 14 August 2015 | Dresden | Response to Preliminary White Finding |
ML15062A571 | 9 February 2015 | Dresden | (EA-15-001) Response to NRC Integrated Inspection Report 05000237/2014005; 05000249/2014005 |
SVPLTR 13-0019, Letter 05/17/2013 from Exelon Generation Dresden Nuclear Power Station Response to Preliminary White Finding from NRC Integrated Inspection Report 2013-002 | 17 May 2013 | Dresden | Letter 05/17/2013 from Exelon Generation Dresden Nuclear Power Station Response to Preliminary White Finding from NRC Integrated Inspection Report 2013-002 |
ML12213A362 | 4 January 2012 | Davis Besse | E-mail from J. Neurauter to M. Murphy, Et Al, Subject: Davis Besse Shield Building Issue Documents |
ML12200A228 | 5 December 2011 | Davis Besse | Email from V. Mitlyng, Rill to T. Briley, Rill Et Al. on Davis-Besse Coverage |
ML12213A359 | 2 December 2011 | Davis Besse | E-mail from V. Mitlyng to T. Briley, Et Al, Subject: Press Release Has Been Issued |
ML12213A358 | 2 December 2011 | Davis Besse | E-mail from T. Briley to M. Murphy, Et Al, Subject: Davis-Besse Shield Building |
ML12213A383 | 2 December 2011 | Davis Besse | E-Mail from J. Rutkowski, Riii, to T. Briley, Riii Et. Al., Subject: Licensee Project Timeline |
ML12213A382 | 1 December 2011 | Davis Besse | E-Mail from T. Briley, Riii, to M. Murphy, Nro/Dorl, Et. Al., Subject: Davis-Besse Shield Building Calculation References |
ML12213A381 | 21 November 2011 | Davis Besse | E-Mail from E. Sanchez-Santiago, Riii to M. Murphy, Nro/Dorl, Et. Al., Subject: Davis Besse Shield Building Issue Evaluation |
ML12213A380 | 16 November 2011 | Davis Besse | E-Mail from E. Sanchez-Santiago, Riii, to M. Murphy, Nro/Dorl, Et. Al., Subject: FW: Davis Besse Shield Building Technical Review Discussion Items |
ML12213A352 | 16 November 2011 | Davis Besse | E-mail from E. Sanchez Santiago to M. Murphy, Et Al, Subject: FW: Davis Besse Shield Building: Technical Review Discussion Items |
ML12213A350 | 9 November 2011 | Davis Besse | E-mail from E. Sanchez Santiago to M. Murphy, Et Al, Subject: FW: NRC Technical Reviewer Focus Questions |
ML12213A349 | 4 November 2011 | Davis Besse | E-mail from E. Sanchez Santiago to M. Murphy, Et Al, Subject: 11-2-2011 Conference Call Summary |
ML12213A347 | 19 October 2011 | Davis Besse | E-mail from E. Sanchez Santiago to M. Murphy, Et Al,: FW: Davis Besse Phone Call Feedback |
ML070880519 | 9 April 2007 | Palisades | Memo J Cameron, Request for Additional Information, Region III, TAR Requesting Assessment of Palisades Weld Flaw Analysis for Loaded Spent Fuel Cask Msb No. 4, TAC No. A10126 (Dsfst 20070005) |
ML062350108 | 18 August 2006 | LaSalle | Analytical Results for Five Water Samples, Batch Four, from the Vicinity of LaSalle Station, LaSalle, Illinois (Inspection Report No. 050-00373/2006-005)(RFTA No. 06-001) |
ML062340364 | 17 August 2006 | Zion | Report of Analytical Results for Six Water Samples, Batch Five, from the Vicinity of the Zion Nuclear Station, Zion, Illinois (Inspection Report No. 050-00295/2006-001) (Rfta No. 06-001) |
ML062340366 | 17 August 2006 | Byron | Analytical Results for Three Water Samples in Batch Six from the Vicinity of the Byron Generating Station, Byron, Illinois (Inspection Report No. 050-00454/2006-004) (Rfta No. 06-001) |
ML061810389 | 12 December 2005 | Braidwood | E-Mail from Hayden to Lynch, Revision 1 to Braidwood Communication Plan |
ML061000413 | 12 December 2005 | Braidwood | NRC Email from Anne Boland to James Lynch Et Al, Short Meeting This Morning |
ML061710141 | 12 December 2005 | Braidwood | NRC e-mail from Steven Orth to James Lynch, Et Al, Revision 1 to Braidwood Communications Plan |
ML061710173 | 12 December 2005 | Braidwood | NRC Email from Orth to Lynch Et Al Revision 1 to Braidwood Communications Plan |
ML061840450 | 12 December 2005 | Braidwood | E-mail from Hayden to Various Re Revision I to Braidwood Communications Plan |
ML060970598 | 6 December 2005 | Braidwood | NRC Email from Jan Strasma to Anne Boland Et Al, Exelon'S External Activities at Braidwood |
ML060970596 | 6 December 2005 | Braidwood | NRC Email from Richard Skokowski to Anne Boland Et Al, Braidwood Sample Pictures |
ML060970197 | 5 December 2005 | Braidwood | NRC Email from Jan Strasma to Anne Boland Et Al; News Media Coverage of Braidwood Tritium in the Environment |
ML061710203 | 1 December 2005 | Braidwood | NRC Email W/Att from Jan Strasma to Ann Boland, Et Al Revised Draft Braidwood Pn |
ML061710208 | 1 December 2005 | Braidwood | NRC Email W/Att from Jan Strasma to Anne Boland, Et Al Second Revision to Draft Braidwood Pn |
ML060870224 | 13 October 2005 | Palisades | Email, M. Gryglak to J. Ellegood, Subject: Palisades Potential Finding (Crane) |
ML052520314 | 25 August 2005 | La Crosse | 8/25/05 E-Mail from M. Johnsen/Dairyland Transmittal of White Paper, La Crosse Boiling Water Reactor - Reactor Pressure Vessel Removal - NUREG 0612 Compliance. |
ML051050149 | 30 June 2004 | Point Beach | E-mail from P. Krohn, Riii, to H. Chernoff, NRR, Et. Al., No Subject |
ML051050147 | 30 June 2004 | Point Beach | E-mail from P. Krohn, Riii, to H. Chernoff, NRR, Tdafwp Calc |
ML052590563 | 7 June 2004 | Point Beach | E-mail from James Heller to Jamnes Cameron, Micheal Kunowski, and Patrick Louder, RIII-2004-A-0061 |
ML052030468 | 7 June 2004 | Point Beach | E-mail from P. Krohn, Riii, to J. Cameron, P. Louden, Riii, Point Beach Unit 1 Leaking Main Stream Valve, CIV Compliance Question |
ML051050055 | 22 April 2004 | Point Beach | E-mail from D. Karjala, Riii, to J. Cameron, Riii, Et Al. Bullet Nose Cap |
ML20135B719 | 3 December 1996 | Forwards Written Techniques Exam J Cameron Completed at End of Course Conducted During Periods 960826-30 & 1022-24.W/o Encl | |
ML19320D457 | 10 July 1980 | South Texas Comanche Peak | Reviews 800702 Draft Transmission Svc Settlement Agreement. Document Found to Be Unacceptable Due to Provisions Making Austin Jurisdictional as Practical Matter for Wheeling. Postage Stamp Wheeling Rate Is Not Proper in Tx |