Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20262H55514 December 1973Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Watertight Door Assy. Sheet 1 of 3Other
ML20262H55814 December 1973Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Details:1,2,17 & 21 Thru 27,32,33 & 34. Sheet 2 of 3Other
ML20262H56114 December 1973Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Details:3,13,19,24,28,35 & 36. Sheet 3 of 3Other
ML20262H56718 June 1975Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
4 Ft X 8 Ft Opening Lhrb Door & Frame Assembly. Sheet 1 of 3Other
ML20262H56918 June 1975Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Details 1 & 6. Sheet 2 of 3Other
ML20262H57118 June 1975Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Details 2,3,4 & 5. Sheet 3 of 3Other
ML20054L8131 July 1982Southern Nuclear
Head G
Forwards Supplemental Responses to 10CFR50.48 & App R to 10CFR50 & Engineering Planning & Mgt,Inc Rept, DC Essential Cabinet Analysis, Per NRC 810220 Request (Generic Ltr 81-12)Supplement
ML20262H56320 August 1982Southern Nuclear
PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.)
Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision DateOther
ML20070V79914 February 1983Southern Nuclear
Gucwa L
Requests Meeting on or After 830329 W/Nrr to Appeal for Reconsideration of NRC Proposed Denial of App R Exemption Request.Addl Info Forthcoming to Clarify 820701 SubmittalMeeting
ML20073S17228 April 1983Southern Nuclear
Gucwa L
Clarifies Requests for Exemptions from 10CFR50.48 & App R Requirements in Response to NRC Request at 830330 Meeting. Rev to 820701 Response to Be Submitted by 830530Meeting
ML20071H92419 May 1983Southern Nuclear
Gucwa L
Submits Info on Compliance W/Branch Technical Position 9.5-1 Re Qualification of Fire Protection Engineers. Qualification Requirements Met Through Maint of Staff at Affiliated Svc Company,Southern Co Svcs,IncOther
ML20263B93018 August 1983INC.
SOUTHERN COMPANY SERVICES
Appendix R Fire Protection Modifications - CPM Schedule. Sheet 2 of 5Other
ML20263B9257 November 1983INC.
SOUTHERN COMPANY SERVICES
Appendix R Fire Protection Modifications - CPM Schedule. Sheet 4 of 5Other
ML20263B9277 November 1983INC.
SOUTHERN COMPANY SERVICES
Appendix R Fire Protection Modifications - CPM Schedule. Sheet 3 of 5Other
ML20263B93214 November 1983INC.
SOUTHERN COMPANY SERVICES
Appendix R Fire Protection Modifications - CPM Schedule. Sheet 1 of 5Other
ML20082D34216 November 1983Southern Nuclear
Gucwa L
Forwards Addl Info Justifying Three Requests for Exemption from 10CFR50.48 & App R as Discussed in 830330 Meeting.Rev to 820701 Response Will Be Submitted by 831130Meeting
ML20082J78330 November 1983Southern Nuclear
Gucwa L
Forwards Replacement Pages to Re Clarification of App R Exemption Requests,Reflecting Revised Sections of 820701 Response to 10CFR50.48Other
ML20083D75420 December 1983Southern Nuclear
Gucwa L
Forwards Revised Pages for Insertion Into 830701 Request for Exemption from 10CFR50.48 & 10CFR50,App R Requirements Re Sprinkler Head/Nozzle & Detector PlacementRequest
ML20083D77221 December 1983Southern Nuclear
Gucwa L
Forwards Payment of Fee Required for Review of 810319 Submittal on Safe Alternate Shutdown & Request for Schedular Exemption from Installation of Emergency LightingRequest
ML20079P71224 January 1984Southern Nuclear
Beckham J
Submits Info Documenting Addl Considerations of Projected Phased Improvement in Fire Protection & Mitigating Factors for Areas Unmodified During Extended Implementation Period. Tentative Completion Dates for App R Mods EnclOther
ML20091B73325 May 1984Southern Nuclear
Gucwa L
Notifies of Commitment to Meet on fire-area-by-fire-area Basis,Either Item 1 or 2 & 3 for Period of Time from Expiration of 10CFR50.48 Schedule Allowance Until Area Complies W/Paragraphs III.G.2 & III.G.3 of 10CFR50,App ROther
ML20197G5588 June 1984Office of Nuclear Reactor Regulation
Rivenbark G
Requests Addl Info on App R Implementation,Needed to Respond to 840525 Request for Schedular Exemption.Proposed Schedules Appear AcceptableApproval
ML20096F8124 September 1984Southern Nuclear
Gucwa L
Requests Notification of Determination Re Acceptability of Kaowool as Fire BarrierOther
ML20096F8384 September 1984Southern Nuclear
Gucwa L
Forwards Proposed Specific Compensatory Measures to Support 840525 Requested 10CFR50.48 Schedular Exemptions for nonoutage-related App R Mods,Per 840608 RequestOther
ML20093E4112 October 1984Southern Nuclear
Beckham J
Proposes Establishment of Roving Fire Watch to Pass Through Listed Sections of Control & Reactor Bldgs as Compensatory Measures to Support Schedular Extension of App R ModsOther
ML20106D35319 October 1984Southern Nuclear
Gucwa L
Requests Exemption from 10CFR50.48(c) to Allow Extension Until 861130 of Implementation Schedule for Listed App R Related Mods Which Can Be Implemented During Nonoutage PeriodOther
ML20101E37320 December 1984Southern Nuclear
Gucwa L
Submits Specific Info Re Compensatory Measures for nonoutage-related App R Mods Not Completed within 10CFR50.48 Time Frame,In Support of 841002 Request for Extension of Schedule to Complete Listed ModsRequest
ML20114B41817 January 1985Southern Nuclear
Gucwa L
Responds to 850116 Order & Provides Rev to Interim Mitigation Factors for Nonoutage Related App R Mods,Per 850117 TelconOther