Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements | 22 December 2022 | Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements | Nondestructive Examination |
CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 22 December 2022 | Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML22354A190 | 22 December 2022 | Response to Letter Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report | |
ML22356A298 | 22 December 2022 | Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report | |
ML22353A081 | 15 December 2022 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds | |
ML22348A097 | 14 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) | |
ML22348A044 | 13 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) | Pressure Boundary Leakage |
WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision | 12 December 2022 | Submittal of Emergency Plan Implementing Procedure Revision | |
ML22343A069 | 8 December 2022 | NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) | Anticipated operational occurrence |
ML22271A914 | 7 December 2022 | Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme | Operating Basis Earthquake Earthquake |
ML22329A138 | 5 December 2022 | Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 | |
IR 05000390/2022420 | 1 December 2022 | Security Baseline Inspection 05000390/2022420 and 05000391/2022420 Cover Letter | Affidavit |
CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat | 28 November 2022 | Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio | |
ML22327A190 | 28 November 2022 | Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000390 2023403; 05000391 2023403 | Cyber Security |
CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 | 28 November 2022 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 | Dissimilar Metal Weld |
ML22334A142 | 22 November 2022 | 11-14-2022 Watts Bar Integrated Inspection Report | |
ML22346A058 | 21 November 2022 | News Release-II-22-028: NRC Names New Resident Inspector at Watts Bar Nuclear Power Plant | New Resident Inspector |
ML22293A408 | 14 November 2022 | Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | |
ML22318A007 | 14 November 2022 | Integrated Inspection Report 05000390/2022003 and 05000391/2022003 | Boric Acid Non-Destructive Examination Commercial Grade Dedication Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Foreign Material Exclusion Fire Protection Program Downpower |
ML22318A104 | 14 November 2022 | Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation | Dissimilar Metal Weld |
ML22314A031 | 10 November 2022 | 2B | Probabilistic Risk Assessment Job Performance Measure |
ML22257A051 | 4 November 2022 | Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A | Shutdown Margin Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Fire Protection Program |
PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 | 3 November 2022 | Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 | |
WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies | 1 November 2022 | Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies | |
CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update | 31 October 2022 | Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update | |
IR 05000390/2022010 | 28 October 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000390/2022010 and 05000391/2022010 | Safe Shutdown Tornado Missile Large early release frequency Earthquake Very Low Safety Significance Issue Resolution |
ML22276A161 | 24 October 2022 | Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Cyber Security Fire Protection Program |
CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 | 17 October 2022 | Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 | |
WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions | 17 October 2022 | Unit 2 - Emergency Plan Implementing Procedure Revisions | |
WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) | 17 October 2022 | Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) | |
ML22272A568 | 12 October 2022 | Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code | Incorporated by reference |
CNL-22-004, Completion of Actions Required by NRC Confirmatory Order EA-17-022 | 5 October 2022 | Completion of Actions Required by NRC Confirmatory Order EA-17-022 |