CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements22 December 2022Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting RequirementsNondestructive Examination
CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions22 December 2022Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML22354A19022 December 2022Response to Letter Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report
ML22356A29822 December 2022Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report
ML22353A08115 December 2022NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds
ML22348A09714 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088)
ML22348A04413 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100)Pressure Boundary Leakage
WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision12 December 2022Submittal of Emergency Plan Implementing Procedure Revision
ML22343A0698 December 2022NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103)Anticipated operational occurrence
ML22271A9147 December 2022Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level SchemeOperating Basis Earthquake
Earthquake
ML22329A1385 December 2022Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2
IR 05000390/20224201 December 2022Security Baseline Inspection 05000390/2022420 and 05000391/2022420 Cover LetterAffidavit
CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat28 November 2022Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio
ML22327A19028 November 2022Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000390 2023403; 05000391 2023403Cyber Security
CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-0128 November 2022American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01Dissimilar Metal Weld
ML22334A14222 November 202211-14-2022 Watts Bar Integrated Inspection Report
ML22346A05821 November 2022News Release-II-22-028: NRC Names New Resident Inspector at Watts Bar Nuclear Power PlantNew Resident Inspector
ML22293A40814 November 2022Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule
ML22318A00714 November 2022Integrated Inspection Report 05000390/2022003 and 05000391/2022003Boric Acid
Non-Destructive Examination
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Foreign Material Exclusion
Fire Protection Program
Downpower
ML22318A10414 November 2022Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide PresentationDissimilar Metal Weld
ML22314A03110 November 20222BProbabilistic Risk Assessment
Job Performance Measure
ML22257A0514 November 2022Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-AShutdown Margin
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 23 November 2022Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2
WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies1 November 2022Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies
CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update31 October 2022Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
IR 05000390/202201028 October 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000390/2022010 and 05000391/2022010Safe Shutdown
Tornado Missile
Large early release frequency
Earthquake
Very Low Safety Significance Issue Resolution
ML22276A16124 October 2022Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Cyber Security
Fire Protection Program
CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 5517 October 2022Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55
WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions17 October 2022Unit 2 - Emergency Plan Implementing Procedure Revisions
WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)17 October 2022Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)
ML22272A56812 October 2022Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance CodeIncorporated by reference
CNL-22-004, Completion of Actions Required by NRC Confirmatory Order EA-17-0225 October 2022Completion of Actions Required by NRC Confirmatory Order EA-17-022