Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18249A33426 September 2018Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9435 and MF9436; EPID L-2016-LRC-0001)
IR 05000321/201801121 September 2018Nuclear Regulatory Commission Team Inspection Report 05000321/2018011 and 05000366/2018011FLEX
Spent Fuel Pool Instrumentation
ML18262A26418 September 2018Acceptance Review for Hatch 1 and 2 RHR Drywell Spray End State TS Change
ML18254A42810 September 2018NRR E-mail Capture - NRC Acceptance Review Regarding Changes to the Farley, Hatch, and Vogtle TS 5.2.2.g
NL-18-0906, Revision 36 to the Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, License Renewal Changes, & Revised NRC Commitments Report30 August 2018Revision 36 to the Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, License Renewal Changes, & Revised NRC Commitments ReportTemporary Modification
Qualified Offsite Circuit
Open Phase Condition
License Renewal
Fuel cladding
Offsite Circuit
ML18243A48329 August 2018Electric Power Research Institute - Submittal of BWRVIP-319NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hatch Unit 2 120 Degrees Surveillance Capsule
ML18222A29629 August 2018Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263)Safe Shutdown
Surveillance Frequency Control Program
Feedwater Controller Failure
Fire Protection Program
NL-18-1141, Registration of Spent Fuel Cask Use27 August 2018Registration of Spent Fuel Cask Use
IR 05000321/201800523 August 2018Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005License Renewal
ML18234A47123 August 2018NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018
ML18228A83522 August 2018Online Reference Portal for License Amendment Request to Adopt National Fire Protection Association Standard 805Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Multiple Spurious Operation
Fire Protection Program
Very Early Warning Fire Detection
IR 05000321/201841017 August 2018U.S. Nuclear Regulatory Commission Security Inspection Report 05000321/2018410, 05000366/2018410Affidavit
IR 05000321/201800210 August 2018Nuclear Regulatory Commission Integrated Inspection Report 05000321/2018002 and 05000366/2018002Hot Short
Safe Shutdown
Unanalyzed Condition
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Past operability
Enforcement Discretion
Operator Manual Action
Temporary Modification
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Operability Determination
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Power change
Unidentified leak
ML18226A0949 August 2018Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff TablesSafe Shutdown
Health Physics Network
Shutdown Margin
Minimum staff
NL-18-0601, Revision to Technical Specification End State for Residual Heat Removal Drywell Spray6 August 2018Revision to Technical Specification End State for Residual Heat Removal Drywell SprayProbabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
ML18183A07326 July 2018Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293)Health Physics Network
High winds
ML18205A45024 July 2018NRC Acceptance Review for Hatch Request for Alternative HNP-ISI-ALT-05-04
ML18204A14820 July 2018NRC Acceptance Review for Hatch LAR to Adopt 10 CFR 50.69Probabilistic Risk Assessment
NL-18-0966, Withdrawal of Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing18 July 2018Withdrawal of Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing