Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J27 September 2018Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J
1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval24 September 2018Snubber Testing Program for Fifth Inservice Test IntervalSafe Shutdown
Anchor Darling
ML18263A30219 September 2018NRR E-mail Capture - ANO-1 - Final RAI License Amendment Request to Adopt TSTF-425, Revision 3High winds
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
0CAN091801, Response to Request for Additional Information Related to the Application for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 617 September 2018Response to Request for Additional Information Related to the Application for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6Safe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Annual Radioactive Effluent Release Report
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML18263A14811 September 2018NRR E-mail Capture - ANO-2 - Final RAI #2 LAR to Update the RCS Pressure-Temperature Limits
IR 05000313/201800531 August 2018Updated Inspection Plan for Arkansas Nuclear One (Report 05000313/2018005 and 05000368/2018005)Cyber Security
Open Phase Condition
NRC-2017-0188, Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-0328 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
ML18240A13228 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval27 August 2018Inservice Testing Plan for the Fifth 10-Year IntervalSafe Shutdown
Boric Acid
Ultimate heat sink
Stroke time
Incorporated by reference
FLEX
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
1CAN081806, Response to Request for Additional Information (RAI) Regarding Relief Request ANO1-ISI-03122 August 2018Response to Request for Additional Information (RAI) Regarding Relief Request ANO1-ISI-031
ML18192A10415 August 2018Alternative to Examination of Reactor Pressure Vessel Flange ThreadsIncorporated by reference
ML18228A50115 August 2018NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC ResponseExemption Request
ML18226A31514 August 2018NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-031
1CAN081801, Response to Request for Additional Information Related to License Amendment Request - Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves10 August 2018Response to Request for Additional Information Related to License Amendment Request - Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply ValvesStroke time
IR 05000368/20180109 August 2018Post-Approval Site Inspection for Licensee Renewal Inspection Report 05000368/2018010Boric Acid
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
Significance Determination Process
License Renewal
Maintenance Rule Program
Biofouling
ML18173A1797 August 2018OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan CNondestructive Examination
Incorporated by reference
Large early release frequency
Fuel cladding
ML18218A5012 August 2018NRR E-mail Capture - ANO-2 - Final RAI License Amendment Request to Adopt TSTF-425, Revision 3High winds
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fire Protection Program
Very Early Warning Fire Detection
ML18218A2212 August 2018NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Adopt EAL Scheme Change Per NEI 99-01 Revision 6Safe Shutdown
Offsite Dose Calculation Manual
Fuel cladding
ML18173A1752 August 2018OEDO-17-00070/SRM-DD-18-03 - Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan CastingNondestructive Examination
Incorporated by reference
Large early release frequency
Fuel cladding
2CAN081802, Responses to the Request for Additional Information Regarding License Amendment Request to Update the Reactor Coolant System Pressure-Temperature Limits1 August 2018Responses to the Request for Additional Information Regarding License Amendment Request to Update the Reactor Coolant System Pressure-Temperature Limits
1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)25 July 2018Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)
ML18199A32318 July 2018NRR E-mail Capture - ANO-1 - Final RAI #2 License Amendment Request to Revise EFW System TS Bases
ML18163A41811 July 2018Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi AccidentUnanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
ML18180A2185 July 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018Cyber Security
Pressure and Temperature Limits Report
Large early release frequency
Exemption Request
Fuel cladding
Recently irradiated fuel
Fire Protection Program
NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20185 July 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018