Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22335A41421 December 2022Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02
IR 05000338/202200320 December 2022Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022003 and 05000339/2022003Unanalyzed Condition
Boric Acid
Non-Destructive Examination
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
ML22353A62019 December 2022Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code
IR 05000338/202200115 December 2022Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022001 and 05000339/2022001 and 07200056/2022001Safe Shutdown
Unanalyzed Condition
Boric Acid
Non-Destructive Examination
Fire Barrier
Multiple Spurious Operation
Functionality Assessment
FLEX
Significance Determination Process
Large early release frequency
Operability Determination
Earthquake
Liquid penetrant
Fire Protection Program
Power change
Coast down
ML22346A09015 December 2022Revision of Schedule for the Conduct of Environmental Review of the North Anna Power Station Subsequent License Renewal Application
ML22350A06215 December 2022Comment (1) of Harmon Curran on Notice of Intent to Conduct Scoping Process and Prepare Supplement to Draft Environmental Impact Statement Virginia Electric and Power Company North Anna Power, Units 1 and 2License Renewal
Subsequent License Renewal
Earthquake
ML22342B1478 December 2022NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162)
ML22353A1267 December 2022GL Registration from Dominion Virginia PowerStatic Eliminator
ML22335A4841 December 2022NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166)
ML22339A24121 November 2022Comment (1) E-mail Regarding North Anna Suppl Scoping
ML22346A05215 November 2022News Release-22-047: NRC to Review North Anna Subsequent License Renewal Report; Seeks Public Input on Environmental Issues
ML22316A0029 November 2022Core Operating Limits Report, Cycle 30, Patterson Doa, Revision 0Shutdown Margin
ML22316A0039 November 2022Core Operating Limits Report (Colr), Cycle 30, Pattern Aod, Revision 1Shutdown Margin
ML22294A1898 November 2022Federal Register Notice - Notice of Intent to Prepare EIS and to Conduct EIS Scoping for North Anna Power StationLicense Renewal
Subsequent License Renewal
ML22312A5507 November 2022Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation TimesHealth Physics Network
Offsite Dose Calculation Manual
Anticipated operational occurrence
Operating Basis Earthquake
Incorporated by reference
FLEX
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Siren
ML22312A4437 November 2022NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI
ML22311A5427 November 2022Integrated Inspection Report 05000338/2022003 and 05000339/2022003Unanalyzed Condition
Boric Acid
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Fire Protection Program
ML22307A3173 November 2022Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment SumpBoric Acid
Hydrostatic
Surveillance Frequency Control Program
Earthquake
ML22263A45414 October 2022NRC Acceptance of FEMA Approval of North Anna ANS Change to IPAWSIntegrated Public Alert and Warning System
Siren
ML22303A0199 October 2022Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d