Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22342B28028 December 2022Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1
ML22353A61219 December 2022March 2023 Emergency Preparedness Exercise Inspection - Request for InformationSiren
IR 05000415/202230119 December 2022NRC Examination Report 05000415/2022301Locked High Radiation Area
ML22340A6726 December 2022Request to Update ASME Code Relief Request Safety Evaluations with NRC Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)
ML22334A09930 November 2022Report Pursuant to 10CFR71.95(b) to Report a Failure to Comply with Conditions of Certificate of Compliance During a Shipment
ML22312A5838 November 2022Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401Cyber Security
PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet4 November 2022Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet
IR 05000416/20220033 November 2022Integrated Inspection Report 05000416/2022003Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
IR 05000416/20224031 November 2022Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only)Affidavit
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)Affidavit
GNF3
Water rod
ML22301A14127 October 2022Overview of 10 CFR Part 21- Tim Steadham SRI Region IV
IR 05000416/202201324 October 2022Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013Stroke time
Probabilistic Risk Assessment
Anchor Darling
Significance Determination Process
Power-Operated Valves
IR 05000416/202205020 October 2022Special Inspection Reactive Report 05000416/2022050Commercial Grade Dedication
Significance Determination Process
Operability Determination
Commercial Grade
ML22342B25914 October 202210 Post Examination Analysis
ML22342B26014 October 202210 Public FormsJob Performance Measure
ML22280A02911 October 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013Stroke time
Probabilistic Risk Assessment
Anchor Darling
Significance Determination Process
Time Critical Operator Action
Power-Operated Valves
ML22271A8573 October 2022Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for InformationCommercial Grade Dedication