Issue date | Title | Topic | |
---|---|---|---|
ML20357B133 | 30 December 2020 | Transmittal Memo - Delivery of Partial Deliverable Associated with the Trace Code Maintenance, Plant Model Maintenance, and Plant Model Development to Support Licensing Actions and Emergent Technical Issues User Need | |
PMNS20201404, Pre-Submittal Meeting for Subsequent License Renewal Application for Oconee Nuclear Station, Units 1, 2, and 3 - Safety | 22 December 2020 | Pre-Submittal Meeting for Subsequent License Renewal Application for Oconee Nuclear Station, Units 1, 2, and 3 - Safety | License Renewal |
ML20344A004 | 17 December 2020 | Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0180 (Covid 19)) | Safeguards Contingency Plan Exemption Request Pandemic Coronavirus COVID-19 |
RA-20-0387, EAL Technical Bases Document Revision 002 | 16 December 2020 | EAL Technical Bases Document Revision 002 | |
ML20303A024 | 9 December 2020 | Issuance of Amendments 419, 421, 420 TSTF-272, Refueling Boron Concentration Clarification | Surveillance Frequency Control Program |
ML20336A310 | 1 December 2020 | Letter to Aaron Ahern from NRC Secretary Annette Vietti-Cook Regarding Request for Hearing | |
ML20296A281 | 25 November 2020 | Issuance of Amendment Nos. 418, 420 and 419 TSTF-421, Revision to RCP Flywheel Inspection Program | Probabilistic Risk Assessment Overspeed trip |
ML20323A407 | 18 November 2020 | NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) | Safeguards Contingency Plan Exemption Request Pandemic Coronavirus COVID-19 Grace period |
ML20304A369 | 17 November 2020 | Documentation of the Completion of Required Action Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit Seismic Walkdown Report |
IR 05000269/2020401 | 13 November 2020 | Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401 | Coronavirus COVID-19 |
RA-20-0349, Transmittal of Core Operating Limits Report (COLR) for Cycle 32 (Revision 0) | 11 November 2020 | Transmittal of Core Operating Limits Report (COLR) for Cycle 32 (Revision 0) | Boric Acid Shutdown Margin |
ML20300A206 | 9 November 2020 | Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
IR 05000269/2020003 | 4 November 2020 | Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 | Safe Shutdown Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Aging Management Missed surveillance Significance Determination Process Operability Determination Annual Radiological Effluent Release Report License Renewal Earthquake Coronavirus COVID-19 Fire Protection Program |
ML20266G219 | 3 November 2020 | Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building | Safe Shutdown FLEX Time Critical Operator Action License Renewal Commercial Grade GOTHIC |
ML20302A432 | 28 October 2020 | 2A-3 Combined Delayed Release Exam Admin Items.Pdf | Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment Downpower Loss of condenser vacuum |
ML20300A090 | 27 October 2020 | Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation | License Renewal Subsequent License Renewal |
ML20300A087 | 27 October 2020 | Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation | Probabilistic Risk Assessment Large early release frequency License Renewal Subsequent License Renewal |
PMNS20201206, Subsequent License Renewal Environmental Pre-Application Meeting | 26 October 2020 | Subsequent License Renewal Environmental Pre-Application Meeting | Subsequent License Renewal |
ML20302A266 | 26 October 2020 | File 2A-2 Exam Final Items Delayed Release | Unanalyzed Condition Shutdown Margin Grab sample Time to boil Arc flash Job Performance Measure Power change |
ML20302A251 | 26 October 2020 | File 2A-1 Exam Draft Items Delayed Release | Boric Acid Shutdown Margin Loop seal High Radiation Area Grab sample Slow transfer Time to boil Arc flash Locked High Radiation Area Job Performance Measure Operability Determination Power change Overspeed trip |
PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes | 22 October 2020 | Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes | |
ML20289A470 | 15 October 2020 | Security Inspection Report Cover Letter 05000269/2020420, 05000270/2020420, 05000287/2020420 | |
IR 05000269/2020420 | 15 October 2020 | Security Inspection Report 05000269/2020420, 05000270/2020420 and 05000287/2020420 | |
ML20297A310 | 13 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) | Incorporated by reference |
ML20297A308 | 7 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) | Incorporated by reference |
ML20297A309 | 6 October 2020 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) | Incorporated by reference |