Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20357B13330 December 2020Transmittal Memo - Delivery of Partial Deliverable Associated with the Trace Code Maintenance, Plant Model Maintenance, and Plant Model Development to Support Licensing Actions and Emergent Technical Issues User Need
PMNS20201404, Pre-Submittal Meeting for Subsequent License Renewal Application for Oconee Nuclear Station, Units 1, 2, and 3 - Safety22 December 2020Pre-Submittal Meeting for Subsequent License Renewal Application for Oconee Nuclear Station, Units 1, 2, and 3 - SafetyLicense Renewal
ML20344A00417 December 2020Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0180 (Covid 19))Safeguards Contingency Plan
Exemption Request
Pandemic
Coronavirus
COVID-19
RA-20-0387, EAL Technical Bases Document Revision 00216 December 2020EAL Technical Bases Document Revision 002
ML20303A0249 December 2020Issuance of Amendments 419, 421, 420 TSTF-272, Refueling Boron Concentration ClarificationSurveillance Frequency Control Program
ML20336A3101 December 2020Letter to Aaron Ahern from NRC Secretary Annette Vietti-Cook Regarding Request for Hearing
ML20296A28125 November 2020Issuance of Amendment Nos. 418, 420 and 419 TSTF-421, Revision to RCP Flywheel Inspection ProgramProbabilistic Risk Assessment
Overspeed trip
ML20323A40718 November 2020NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180)Safeguards Contingency Plan
Exemption Request
Pandemic
Coronavirus
COVID-19
Grace period
ML20304A36917 November 2020Documentation of the Completion of Required Action Taken in Response to the Lessons Learned from the Fukushima Dai-ichi AccidentUnanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
Seismic Walkdown Report
IR 05000269/202040113 November 2020Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401Coronavirus
COVID-19
RA-20-0349, Transmittal of Core Operating Limits Report (COLR) for Cycle 32 (Revision 0)11 November 2020Transmittal of Core Operating Limits Report (COLR) for Cycle 32 (Revision 0)Boric Acid
Shutdown Margin
ML20300A2069 November 2020Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
IR 05000269/20200034 November 2020Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002Safe Shutdown
Fire Barrier
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Aging Management
Missed surveillance
Significance Determination Process
Operability Determination
Annual Radiological Effluent Release Report
License Renewal
Earthquake
Coronavirus
COVID-19
Fire Protection Program
ML20266G2193 November 2020Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment BuildingSafe Shutdown
FLEX
Time Critical Operator Action
License Renewal
Commercial Grade
GOTHIC
ML20302A43228 October 20202A-3 Combined Delayed Release Exam Admin Items.PdfUnanalyzed Condition
Shutdown Margin
Probabilistic Risk Assessment
Downpower
Loss of condenser vacuum
ML20300A09027 October 2020Subsequent License Renewal Environmental Pre-Application Meeting - NRC PresentationLicense Renewal
Subsequent License Renewal
ML20300A08727 October 2020Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy PresentationProbabilistic Risk Assessment
Large early release frequency
License Renewal
Subsequent License Renewal
PMNS20201206, Subsequent License Renewal Environmental Pre-Application Meeting26 October 2020Subsequent License Renewal Environmental Pre-Application MeetingSubsequent License Renewal
ML20302A26626 October 2020File 2A-2 Exam Final Items Delayed ReleaseUnanalyzed Condition
Shutdown Margin
Grab sample
Time to boil
Arc flash
Job Performance Measure
Power change
ML20302A25126 October 2020File 2A-1 Exam Draft Items Delayed ReleaseBoric Acid
Shutdown Margin
Loop seal
High Radiation Area
Grab sample
Slow transfer
Time to boil
Arc flash
Locked High Radiation Area
Job Performance Measure
Operability Determination
Power change
Overspeed trip
PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes22 October 2020Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes
ML20289A47015 October 2020Security Inspection Report Cover Letter 05000269/2020420, 05000270/2020420, 05000287/2020420
IR 05000269/202042015 October 2020Security Inspection Report 05000269/2020420, 05000270/2020420 and 05000287/2020420
ML20297A31013 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126)Incorporated by reference
ML20297A3087 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124)Incorporated by reference
ML20297A3096 October 2020NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125)Incorporated by reference