ML103620544 | 28 December 2010 | Request for Additional Information Relief Request RR-ENG-3-02 | |
ML103620556 | 28 December 2010 | Request for Additional Information, Relief Request RR-ENG-3-02 | |
ML103620567 | 28 December 2010 | Request for Additional Information, Relief Request RR-ENG-2-55 | Nondestructive Examination |
TAC:ME6058 | 21 December 2010 | ||
NOC-AE-10002626, Response to Request for Additional Information Related to Part 1, Administrative Information, License Renewal Application | 21 December 2010 | Response to Request for Additional Information Related to Part 1, Administrative Information, License Renewal Application | |
NOC-AE-10002623, Proposed Revision to Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlotm Cladding | 21 December 2010 | Proposed Revision to Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlotm Cladding | Exemption Request Fuel cladding |
NOC-AE-10002629, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts | 16 December 2010 | Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts | |
ML103020399 | 23 November 2010 | Receipt and Availability of the License Renewal Application for the South Texas Project Electric Generating Station Units One and Two (LTR) | |
ML103360179 | 23 November 2010 | FRN: General Notice. Us NRC STP Nuclear Operating Co. Notice of Receipt and Availability of Application for Renewal of South Texas Project Units 1 and 2 | |
ML103090389 | 23 November 2010 | Maintenance of Reference Materials at the Bay City Public Library Related to the Review of South Texas Project, Units 1 and 2, License Renewal Application | |
ML103020406 | 23 November 2010 | FRN: General Notice. Notice of Receipt and Availability of Application for Renewal of South Texas Project, Units 1 and 2 for South Texas Units 1 and 2 | |
NOC-AE-10002605, License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System. | 22 November 2010 | License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System. | Safe Shutdown Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Fuel cladding |
PNO-IV-10-005, A: Update - South Texas Project Unit 2 Reactor Trip and Notification of Unusual Event | 12 November 2010 | PNO-IV-10-005A: Update - South Texas Project Unit 2 Reactor Trip and Notification of Unusual Event | |
Press Release-10-202, NRC Announces Availability of License Renewal Application for South Texas Project Nuclear Power Plant | 4 November 2010 | Press Release-10-202: NRC Announces Availability of License Renewal Application for South Texas Project Nuclear Power Plant | |
IR 05000498/2010004 | 2 November 2010 | IR 05000498-10-004, 05000499-10-004, on 09/30/10, South Texas Project Electric Generating Station, Units 1 and 2, Integrated Inspection | High winds Mission time Weld Overlay Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment Tornado-Generated Missile Significance Determination Process Large early release frequency Operability Determination Through-Wall Leak Fire Protection Program Operability Assessment |
NOC-AE-10002614, Submittal of Operations Quality Assurance Plan Change QA-071 | 28 October 2010 | Submittal of Operations Quality Assurance Plan Change QA-071 | Fitness for Duty Offsite Dose Calculation Manual Nondestructive Examination Cyber Security Process Control Program Large early release frequency Exemption Request Fire Protection Program |
ML103270165 | 28 October 2010 | Project, Units 1 & 2 - License Renewal Application Scoping Drawings | |
IR 05000498/2010006 | 28 October 2010 | IR 05000498-10-006; 05000499-10-006; 08/30/10 - 09/16/10; South Texas Project Units 1 and 2: Identification and Resolution of Problems | Functionality Assessment Significance Determination Process Operability Determination Operability Assessment |
ML103010315 | 28 October 2010 | Request for Additional Information Email, Relief Request RR-ENG-3-01, from ASME Code Requirements for Class 2 Piping for the Third 10-Year Inservice Inspection Interval | Nondestructive Examination |
ML103270184 | 28 October 2010 | Drawing LR-STP-Index, Revision 0B, Index of License of License Renewal Boundary Drawings, Sheet 1 | |
ML103270185 | 28 October 2010 | Drawing LR-STP-Symbols, Revision 0 License Renewal Boundary Drawing Symbols & Notes, Sheet 1 | |
ML110560622 | 27 October 2010 | FEMA South Texas Project Final Informational Exercise Report, Drill Date - October 27, 2010 | Grab sample |
ML110560624 | 27 October 2010 | FEMA South Texas Project Final Abridged Exercise Report, Drill Date - October 27, 2010 | Grab sample |
TAC:ME4938 | 25 October 2010 | ||
ML103010257 | 25 October 2010 | Project, Units 1 & 2, Transmittal of License Renewal Application | |
ML102990029 | 25 October 2010 | Acceptance Review Email, Relief Request RR-ENG-3-01, RR-ENG-3-02, and RR-ENG-3-03 from ASME Code Requirements for Third 10-Year Inservice Inspection Interval (TAC ME4766-ME4767, ME4764-ME4765, ME4762-ME4763) | Nondestructive Examination |
NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) | 18 October 2010 | Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) | |
ML102810345 | 13 October 2010 | 9/13/2010 Summary of Conference Call with STP Nuclear Operating Company to Discuss Request for Additional Information Responses for South Texas Project, Units 1 and 2 on Generic Letter 2004-02 | Mission time Coatings Foreign Material Exclusion |
IR 05000498/2010403 | 7 October 2010 | IR 05000498-10-403 and 05000499-10-403 on 08/26/10 for South Texas Project, Units 1 and 2, Security Inspection | Affidavit |
NOC-AE-10002591, Response to Request for Additional Information Reactor Coolant System Pressure Transmitter Replacement | 5 October 2010 | Response to Request for Additional Information Reactor Coolant System Pressure Transmitter Replacement | |
ML102780155 | 4 October 2010 | Amended Relief Request RR-ENG-2-55 from ASME Section XI Code Requirements for Weld Examinations Dated September 29, 2010 |