ML103270184
From kanterella
Jump to navigation
Jump to search
ML103270184 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 10/28/2010 |
From: | South Texas |
To: | Office of Nuclear Reactor Regulation |
References | |
NOC-AE-10002611 LR-STP-Index, Rev 0B | |
Download: ML103270184 (1) | |
Similar Documents at South Texas | |
---|---|
Category:Drawing
MONTHYEARML22140A0582022-04-28028 April 2022
[Table view]1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted) ML22140A0622022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4 ML22140A0752022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted) ML22140A0742022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4 ML20133J9442020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted) ML20133J9412020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4) ML20133J9432020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4) ML20133J9422020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted) ML18130A0482018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 3 ML18130A0462018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 1 ML18130A0472018-04-30030 April 2018 Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 2 ML16207A6462016-04-28028 April 2016 Revision 18 to Updated Safety Analysis Report, Section 1.2, Figure 1.2-1 Through Figure 1.2-4 ML16207A6442016-04-28028 April 2016 Revision 18 to Updated Safety Analysis Report, Section 1.1, Figure 1.1-1 Through Figure 1.1-3 ML13070A2132013-03-29029 March 2013 3/5/13 Summary of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML11318A1332011-11-0303 November 2011 Drawing No. LR-STP-CV-5R179F05008#2, Rev. 16, Piping an Instrumentation Diagram Chemical and Volume System Birs Sub System. ML11318A1302011-11-0303 November 2011 Drawing No. LR-STP-CT-5S199F00020#1, Rev. 1, Piping and Instrumentation Diagram Condensate Storage ML11318A1532011-11-0303 November 2011 Drawing No. LR-STP-FC-5R219F05029#1, Revision 1, Piping & Instrumentation Diagram Spent Fuel Pool Cooling & Cleanup System. ML11318A1522011-11-0303 November 2011 Drawing No. LR-STP-EW-5R289F05038#2-1, Revision 1, Piping & Instrumentation Diagram Essential Cooling Water System Train 2A ML11318A1312011-11-0303 November 2011 Drawing No. LR-STP-CT-5S199F00020#2, Rev. 1, Piping and Instrumentation Diagram Condensate Storage ML11318A1322011-11-0303 November 2011 Drawing LR-STP-CV-5R179F05008#1, Rev. 1, Piping and Instrumentation Diagram Chemical and Volume Control System Btrs Sub System ML11318A1492011-11-0303 November 2011 Drawing No. LR-STP-ED-7Q069F90016#1, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Mab Floor Drains El. 41'-0 and Above. ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. ML11318A1472011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#1, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. ML11318A1382011-11-0303 November 2011 Drawing LR-DTP-DG-5Q159F22546 #1, Rev. 21, Piping & Instrumentation Diagram Standby Diesel Starting Air. ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. ML11318A1452011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #1, Rev. 18, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. ML11318A1442011-11-0303 November 2011 Drawing LR-STP-DW-5S199F05034 #2, Rev. 14, Piping & Instrument Diagram Demineralized Water Distribution System Rcb Fhb, and Mead. ML11318A1432011-11-0303 November 2011 Drawing LR-DTP-DW-5S199F05034 #1, Rev. 15, Piping & Instrumentation Diagram Demineralized Water Distribution System Rcb. Fhb and Meab. ML11318A1352011-11-0303 November 2011 Drawing No. LR-STP-CV-5R179F05009, Rev. 22, Piping and Instrumentation Diagram Chemical and Volume Control System. ML11318A1422011-11-0303 November 2011 Drawing LR-STP-DR-6Q069F20005 #2, Rev. 25, Piping and Instrument Diagram Non-Radioactive Drains Mech. and Elec. Aux. Bldg. and Turbine Gen. Bldg. ML11318A1362011-11-0303 November 2011 Drawing LR-STP-CV-5R179F05009 #2, Rev. 21, Piping and Instrumentation Diagram Chemical and Volume Control System. ML11318A1402011-11-0303 November 2011 Drawing LR-STP-CV-159F00045 #1, Rev. 32, Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer System. ML11318A1392011-11-0303 November 2011 Drawing LR-STP-DG-5Q159F22546 #2, Rev. 15, Piping & Instrumentation Diagram Standby Diesel Starting Air. ML11318A1692011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#1, Rev. 1, Piping & Instrumentation Diagram Reactor Makeup Water System. NOC-AE-11002749, Drawing No. LR-STP-SB-7S209F200032, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System2011-11-0303 November 2011 Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System ML11318A1822011-11-0303 November 2011 Drawing No. 1218E40, Fuel Transfer System Hydraulic Power Unit Outline ML11318A1812011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#2, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System ML11318A1752011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#1, Rev. 1, Piping an Instrumentation Diagram Liquid Waste Processing System ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) ML11318A1732011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#1, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. ML11318A1712011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. ML11318A1572011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F00048#1-2, Rev. 1, Piping and Instrumentation Diagram Instrument Air Dryers 11, 12 & 13. ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. ML11318A1672011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#1, Rev. 1, Piping and Instrumentation Diagram RCS Pressurizer Relief Tank. ML11318A1662011-11-0303 November 2011 Drawing No. LR-STP-PS-9Z329Z00047#2, Rev. 1, Piping and Instrument Diagram Primary Sampling System. ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. 2022-04-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML103270184&oldid=956821"