Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML12069A126 | 31 December 2010 | 2010 Perry Nuclear Power Plant Initial License Examination Proposed Admin Job Performance Measure | Job Performance Measure |
IR 05000440/2010007 | 30 December 2010 | IR 05000440-10-007, on 11/01/2010 - 11/30/2010, Perry Nuclear Power Plant, Unit 1, Routine Biennial Problem Identification and Resolution (Pi&R) Inspection | Half scram Significance Determination Process Operability Determination Scaffolding |
ML103420138 | 22 December 2010 | Uniti 1, and Perry Nuclear Power Plant, Unit No. 1 - Request for the Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection Suits | Mururoa |
ML11126A031 | 16 December 2010 | Operations Manual, Offsite Dose Calculation Manual, Revision 18 | Safe Shutdown Time of Discovery Grab sample Offsite Dose Calculation Manual Coatings Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML103500174 | 15 December 2010 | Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
TAC:ME5192 | 15 December 2010 | ||
ML103510031 | 15 December 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
L-10-339, Submittal of November 2010 NPDES Discharge Monitoring Report | 15 December 2010 | Submittal of November 2010 NPDES Discharge Monitoring Report | |
L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 | 15 December 2010 | License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 | Hydrostatic Incorporated by reference Abnormal operational transient |
L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 | 15 December 2010 | License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 | Hydrostatic Abnormal operational transient Fuel cladding |
ML103400182 | 10 December 2010 | Request for Withholding Information from Public Disclosure | |
L-10-324, Ohio EPA Incident No. 1010-43-2695, National Response Center Incident No. 958358 and 958362, Perry Nuclear Power Plant | 24 November 2010 | Ohio EPA Incident No. 1010-43-2695, National Response Center Incident No. 958358 and 958362, Perry Nuclear Power Plant | |
L-10-323, NPDES Permit No. 3IB00016*ID Minor Modification | 24 November 2010 | NPDES Permit No. 3IB00016*ID Minor Modification | |
IR 05000440/2010403 | 24 November 2010 | IR 05000440-10-403, (Drs), 10/25/2010 - 11/03/2010, Perry Nuclear Power Plant, Routine Security Baseline Inspection - Cover Letter | |
ML103220360 | 19 November 2010 | Firstenergy Nuclear Operating Company (Fenco) Fleet - Project Manager Reassignment | |
ML103200668 | 19 November 2010 | Relief Request VR-7, One Time Replacement Frequency Extension | |
ML103140411 | 12 November 2010 | Project Manager Reassignment | |
L-10-306, October NPDES Discharge Monitoring Report | 10 November 2010 | October NPDES Discharge Monitoring Report | |
ML103140688 | 9 November 2010 | Requalification Program Inspection | |
IR 05000440/2010004 | 9 November 2010 | IR 05000440-10-004, on 07/01/2010 09/30/2010, Surveillance Testing, Problem Identification and Resolution | Stroke time Significance Determination Process |
ML103120653 | 8 November 2010 | Letter to R.J. Fuller (Performance Demonstrative Initiative Meeting 6/17 & 6/18 | Dissimilar Metal Weld |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |
ML103020254 | 29 October 2010 | IR 05000440-10-004, on 07/01/2010 - 09/30/2010; Surveillance Testing; Problem Identification and Resolution | High Radiation Area Stroke time Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Fire Protection Program |
L-10-297, Quarterly Report for the Period July 1 - September 30, 2010 | 25 October 2010 | Quarterly Report for the Period July 1 - September 30, 2010 | |
IR 05000440/2010502 | 22 October 2010 | IR 05000440-10-502, on 09/27/2010 - 10/01/2010; Perry Nuclear Power Plant, Unit 1; Baseline Emergency Preparedness Biennial Exercise Inspection | Significance Determination Process |
TAC:ME4925 | 21 October 2010 | ||
ML102980446 | 21 October 2010 | License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient Fuel cladding |
ML102950281 | 20 October 2010 | Part 21 Notification - Crack Indications in Marathon Control Rod Blades | |
ML102930505 | 20 October 2010 | GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades | |
L-10-291, September 2010 Npde Discharge Monitoring Report | 14 October 2010 | September 2010 Npde Discharge Monitoring Report | |
ML102850436 | 7 October 2010 | S. Wastler Memo Technical Assistance Request - Review of Proposed Amendment to the Perry Nuclear Power Plant Physical Security Plan (TAC L24480) | |
TAC:L24480 | 7 October 2010 |