Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML12069A12631 December 20102010 Perry Nuclear Power Plant Initial License Examination Proposed Admin Job Performance MeasureJob Performance Measure
IR 05000440/201000730 December 2010IR 05000440-10-007, on 11/01/2010 - 11/30/2010, Perry Nuclear Power Plant, Unit 1, Routine Biennial Problem Identification and Resolution (Pi&R) InspectionHalf scram
Significance Determination Process
Operability Determination
Scaffolding
ML10342013822 December 2010Uniti 1, and Perry Nuclear Power Plant, Unit No. 1 - Request for the Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection SuitsMururoa
ML11126A03116 December 2010Operations Manual, Offsite Dose Calculation Manual, Revision 18Safe Shutdown
Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML10350017415 December 2010Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
TAC:ME519215 December 2010
ML10351003115 December 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
L-10-339, Submittal of November 2010 NPDES Discharge Monitoring Report15 December 2010Submittal of November 2010 NPDES Discharge Monitoring Report
L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 015 December 2010License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0Hydrostatic
Incorporated by reference
Abnormal operational transient
L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 115 December 2010License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1Hydrostatic
Abnormal operational transient
Fuel cladding
ML10340018210 December 2010Request for Withholding Information from Public Disclosure
L-10-324, Ohio EPA Incident No. 1010-43-2695, National Response Center Incident No. 958358 and 958362, Perry Nuclear Power Plant24 November 2010Ohio EPA Incident No. 1010-43-2695, National Response Center Incident No. 958358 and 958362, Perry Nuclear Power Plant
L-10-323, NPDES Permit No. 3IB00016*ID Minor Modification24 November 2010NPDES Permit No. 3IB00016*ID Minor Modification
IR 05000440/201040324 November 2010IR 05000440-10-403, (Drs), 10/25/2010 - 11/03/2010, Perry Nuclear Power Plant, Routine Security Baseline Inspection - Cover Letter
ML10322036019 November 2010Firstenergy Nuclear Operating Company (Fenco) Fleet - Project Manager Reassignment
ML10320066819 November 2010Relief Request VR-7, One Time Replacement Frequency Extension
ML10314041112 November 2010Project Manager Reassignment
L-10-306, October NPDES Discharge Monitoring Report10 November 2010October NPDES Discharge Monitoring Report
ML1031406889 November 2010Requalification Program Inspection
IR 05000440/20100049 November 2010IR 05000440-10-004, on 07/01/2010 09/30/2010, Surveillance Testing, Problem Identification and ResolutionStroke time
Significance Determination Process
ML1031206538 November 2010Letter to R.J. Fuller (Performance Demonstrative Initiative Meeting 6/17 & 6/18Dissimilar Metal Weld
ML10306010229 October 2010Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag ValvesBoric Acid
ML10302025429 October 2010IR 05000440-10-004, on 07/01/2010 - 09/30/2010; Surveillance Testing; Problem Identification and ResolutionHigh Radiation Area
Stroke time
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Fire Protection Program
L-10-297, Quarterly Report for the Period July 1 - September 30, 201025 October 2010Quarterly Report for the Period July 1 - September 30, 2010
IR 05000440/201050222 October 2010IR 05000440-10-502, on 09/27/2010 - 10/01/2010; Perry Nuclear Power Plant, Unit 1; Baseline Emergency Preparedness Biennial Exercise InspectionSignificance Determination Process
TAC:ME492521 October 2010
ML10298044621 October 2010License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio ValuesReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML10295028120 October 2010Part 21 Notification - Crack Indications in Marathon Control Rod Blades
ML10293050520 October 2010GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades
L-10-291, September 2010 Npde Discharge Monitoring Report14 October 2010September 2010 Npde Discharge Monitoring Report
ML1028504367 October 2010S. Wastler Memo Technical Assistance Request - Review of Proposed Amendment to the Perry Nuclear Power Plant Physical Security Plan (TAC L24480)
TAC:L244807 October 2010