ML12069A126
| ML12069A126 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/31/2010 |
| From: | Mcneil D Operations Branch III |
| To: | |
| References | |
| Download: ML12069A126 (10) | |
Text
OT-3701-ADM NRC10-A4 JOB PERFORMANCE MEASURE SETUP SHEET Rev 0 System:
Time Critical:
Applicability:
Safety Function:
Setting:
Validated:
References:
Tasks:
Task Standard:
K/ A Data:
Administrative No RO/SRO Radiation Control Classroom 15 minutes OBP-OP-4009 rev 0 (p.12), GE C-RWT200901_PY, Attached: Survey Maps A57042, A57403B; RWPs 100002,100005.
299-502-03-01 Maintain Radiation Exposure as Low as Reasonably Achievable (ALARA) 299-848-01-01 Comply with the Administrative Requirements for the Perry Plant Radiation Dose Control Program Calculate maximum stay-time using conect RWP and Survey Map for RHR A walk-down.
2.3.7 Ability to comply with radiation work pem1it requirements during n01111al or abnonnal conditions.
3.5/3.6 Required Materials: Calculator
(
1.
Setup Instructions: N/A 2.
Location / Method: Classroom / Perfonn 3.
Initial Condition:
The plant is at 100% power. HP reports water leakage in the "A" RHR pump room.
4.
Initiating Cue:
You are to walk-down and inspect the "A" RHR pump and piping. In preparation for this you are to:
Detennine which, of the two provided survey maps, is the conect survey map to use Detennine which, of the two provided RWPs, is the conect RWP to use Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.
State your required actions if the MG-DRD alanns on Dose Limit.
Start Time:
(,
Candidate:
End Time:
(
OT-3701-ADM NRC10-A4 JPM BODY SHEET Rev 0 Standard: Perfo1111er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc...
before perfonning task.
Standard: Perfonner follows management expectations with regards to safety and communication standards.
Step 1 Determine the appropriate survey map.
Critical Step:
Instructor Cue:
Notes:
Operator detem1ines that survey map #57403B is the COlTect map.
(
SAT UNSAT Comment(s):
Step 2 Dete1111ine the appropriate RWP.
Critical Step:
Instructor Cue:
Notes:
Operator detennines that RWP 100002 is the COlTeet RWP.
None RWP 100005 is not for High Rad areas. The survey map shows the RHR room is posted High Rad.
SAT UNSAT Comment(s):
(
OT-3701-ADM NRC10-A4 Step 3 Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.
Rev 0 Critical Step:
Instructor Cue:
Notes:
Operator divides 25 (the dose limit alarm) by 32 (the east side pump dose) and multiples by 60 (minutes/hour) to obtain 46.875 minutes.
None 46 to 47 minutes is acceptable.
SAT UNSAT Comment(s):
Step 4 Required actions if the MG-DRD alanns on Dose Limit
(
Critical Step:
Instructor Cue:
Notes:
Operator determines that immediate exit and HP notification is required.
None None SAT UNSAT Comment(s):
Terminating Cue: Operator has selected an RWP, Survey Map, performed a dose calculation and stated actions on an alarm.
Evaluation Results:
End Time:
SAT UNSAT 1
RADIOLOGICAL SURVEY FORf
{SURVEY Nl},.1l8ER-----r,,.AI-' #
-1 RV,/P' UMBI.i~- --;
1001126
, 7 02 10-0621
_oj 1-.
I'?* !P..::1B11-o.1.B.eY
~_.:..._ _
IBun Dl.G
__ J r.LEV5'l~ _
I _~RE
~QO~ST~~
D:r_03/~1/20~
rPfj"- '---'---- -- ----_. -
f PURPOSE Quarterty Taskca'
.__.~.__
H*__ __ __......_..;..=."'--_
__--***----:---r----
(
I~
I I
A 574' - 02 P/,GE OF
....~. __...::...._.