Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110691280 | 30 December 2010 | Letter to M. Pacilio, Exelon, Subj: Oyster Creek... Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Fitness for Duty Operator Manual Action Emergency Lighting Job Performance Measure Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
ML110040076 | 30 December 2010 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection, Dated December 30, 2010 | Safe Shutdown Fitness for Duty Operator Manual Action Emergency Lighting Job Performance Measure Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
RA-10-099, Annual Sea Turtle Incidental Take Report - 2010 | 30 December 2010 | Annual Sea Turtle Incidental Take Report - 2010 | |
RA-10-099, Oyster Creek, Submittal of Annual Sea Turtle Incidental Take Report - 2010 | 30 December 2010 | Oyster Creek, Submittal of Annual Sea Turtle Incidental Take Report - 2010 | |
ML110040140 | 30 December 2010 | Oyster Creek, Submittal of Annual Sea Turtle Incidental Take Report - 2010 | |
RA-10-103, Cyber Security Plan RAI Response | 21 December 2010 | Cyber Security Plan RAI Response | Cyber Security |
ML110700156 | 16 December 2010 | E-mail from K. Sullivan, BNL to D. Frumkin, NRR Et Al. J-4242A Task Order 1 | |
TAC:ME5341 | 15 December 2010 | ||
ML103510031 | 15 December 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
RA-10-096, Submittal of Analytical Evaluation for a Reactor Recirculation Line Weld | 15 December 2010 | Submittal of Analytical Evaluation for a Reactor Recirculation Line Weld | Non-Destructive Examination Safe Shutdown Earthquake |
ML103500174 | 15 December 2010 | Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML103120332 | 14 December 2010 | Emergency Action Level Scheme Change to NEI 99-01; Revision 5 | |
ML103481100 | 10 December 2010 | G20100729/EDATS: OEDO-2010-1001 - Mark Edward Leyse Ltr. Re 2.206 - Lower Licensing Basis Peak Cladding Temperatures of Oyster Creek and Nine Mile, Unit 1 | Fuel cladding |
RA-10-090, Submittal of Exelon Cyber Security Plan | 18 November 2010 | Submittal of Exelon Cyber Security Plan | Cyber Security |
ML103210508 | 16 November 2010 | Units 1 & 2 - Electronic Transmission, Draft Request for Additional Information Regarding Request to Implement Emergency Action Level Scheme Change to NEI 99-01, Revision 5 | |
ML103350128 | 16 November 2010 | Core Operating Limits Report for Reload 22, Cycle 23, Revision 5 | Anticipated operational occurrence |
RA-10-087, Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation | 11 November 2010 | Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation | |
ML103190426 | 8 November 2010 | Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML102920019 | 5 November 2010 | Correction Letter Relief Request for System Pressure Test Examinations on Class 1 Component Pressure Boundaries | |
ML103090567 | 5 November 2010 | Electronic Transmission, Draft Request for Additional Information Regarding License Amendment Request to Modify Required Actions for Inoperability of an Emergency Diesel Generator | |
NRC-2010-0302, Comment (8) of Deborah Brancato, on Behalf of Riverkeeper, Inc., on NRC-2010-0001, Evaluation of the Groundwater Task Force Report: Public Meeting | 3 November 2010 | Comment (8) of Deborah Brancato, on Behalf of Riverkeeper, Inc., on NRC-2010-0001, Evaluation of the Groundwater Task Force Report: Public Meeting | License Renewal |
IR 05000219/2010004 | 2 November 2010 | IR 05000219-10-004, on 07-31-10 - 09-30-10, Oyster Creek Generating Station - NRC Integrated Inspection Report | High winds High Radiation Area Fire Barrier Temporary Modification Missed surveillance Maintenance Rule Program Unidentified leak |
RA-10-083, Independent Spent Fuel Storage Installation - Annual Report | 1 November 2010 | Independent Spent Fuel Storage Installation - Annual Report | |
ML103050463 | 30 October 2010 | Sea Turtle Logbook Entry for 10/30/2010 | |
RA-10-077, Secondary Containment Capability Test | 20 October 2010 | Secondary Containment Capability Test | |
ML102950281 | 20 October 2010 | Part 21 Notification - Crack Indications in Marathon Control Rod Blades | |
ML102930505 | 20 October 2010 | GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades | |
RA-10-078, Response to Draft Request for Additional Information Re License Amendment Request on Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable | 18 October 2010 | Response to Draft Request for Additional Information Re License Amendment Request on Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable | |
ML102430551 | 18 October 2010 | Issuance of Amendment Secondary Containment Boundary Definition During Shutdown Conditions | Safe Shutdown Anticipated operational occurrence Temporary Modification Surveillance Frequency Control Program Fire Protection Program |
TAC:ME2418 | 15 October 2010 | ||
RA-10-080, Supplemental Information Regarding License Amendment Request to Allow Changes to Secondary Containment Boundary During Shutdown Conditions | 15 October 2010 | Supplemental Information Regarding License Amendment Request to Allow Changes to Secondary Containment Boundary During Shutdown Conditions | Surveillance Frequency Control Program |
RA-10-079, Supplemental Information Regarding License Amendment Request to Allow Changes to Secondary Containment Boundary During Shutdown Conditions | 14 October 2010 | Supplemental Information Regarding License Amendment Request to Allow Changes to Secondary Containment Boundary During Shutdown Conditions | Surveillance Frequency Control Program |
ML102860035 | 11 October 2010 | Sea Turtle Logbook Entry for October 11, 2010 | |
IR 05000219/2010008 | 7 October 2010 | IR 05000219-10-008, on 08/03/2010 - 08/27/2010; Exelon Energy Company, LLC, Oyster Creek Generating Station; Component Design Bases Inspection | Packing leak Stroke time Internal Flooding Condition Adverse to Quality Significance Determination Process Design basis earthquake Scaffolding |