Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110040428 | 27 December 2010 | FEMA, Submittal of Revision to the Illinois Plan for Radiological Accidents (IPRA) - Dresden Nuclear Power Station, Volume II, Dated March 2011 | |
IR 05000249/2010010 | 22 December 2010 | IR 05000249-10-010, on 10/18/2010 - 11/19/2010, Dresden Nuclear Power Station, Unit 3, Post Approval Site Inspection for License Renewal | Safe Shutdown Non-Destructive Examination Coatings Aging Management Significance Determination Process License Renewal Fire Protection Program Power Uprate |
RA-10-103, Cyber Security Plan RAI Response | 21 December 2010 | Cyber Security Plan RAI Response | Cyber Security |
ML103570042 | 16 December 2010 | Notification of Completion of Commitments Required Prior to Entry Into Period of Extended Operation, Associated with License Renewal | |
ML103510031 | 15 December 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML103500174 | 15 December 2010 | Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
RS-10-208, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | 13 December 2010 | Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Safe Shutdown Shutdown Margin Time to boil Spiral reload Recently irradiated fuel |
ML103470720 | 10 December 2010 | Ltr. 12/10/10 Dresden Heat Sink Request for Information | Ultimate heat sink |
SVPLTR 10-0048, Core Operating Limits Report for Unit 3 Cycle 22, Revision 0 | 24 November 2010 | Core Operating Limits Report for Unit 3 Cycle 22, Revision 0 | Minimum Critical Power Ratio MELLLA |
ML103270521 | 23 November 2010 | Draft NRC RAI Exelon Fleet Cyber Security Plan LAR | Cyber Security |
ML103160538 | 19 November 2010 | Project Manage Reassignment | |
RA-10-090, Submittal of Exelon Cyber Security Plan | 18 November 2010 | Submittal of Exelon Cyber Security Plan | Cyber Security |
IR 05000237/2010403 | 16 November 2010 | IR 05000237-10-403 & 05000249-10-403, on 10/08/2010, Dresden Nuclear Power Station, Security Baseline Inspection | |
RS-10-194, Withdrawal of Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System | 16 November 2010 | Withdrawal of Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System | |
ML103190426 | 8 November 2010 | Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000237/2010004 | 4 November 2010 | IR 05000237-10-004, 05000249-10-004, on 07/01/2010 - 09/30/2010, Dresden Nuclear Power Station, Units 2 & 3, Operability Evaluations, Identification and Resolution of Problems | Safe Shutdown High winds Offsite Dose Calculation Manual Commercial Grade Dedication Internal Flooding Probabilistic Risk Assessment Temporary Modification Tornado-Generated Missile Significance Determination Process Annual Radiological Environmental Operating Report Deep Dose Equivalent Through Wall Leak Fire Protection Program Unidentified leakage |
ML102810247 | 1 November 2010 | Preview of a Flaw Evaluation Report of Recirculation Pump a Tee-to-Valve Weld PS2-TEE/202-4B | |
SVPLTR 11-0018, Offsite Dose Calculation Manual | 31 October 2010 | Offsite Dose Calculation Manual | Unanalyzed Condition Time of Discovery Grab sample Offsite Dose Calculation Manual Missed surveillance Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent Power change |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |
RS-10-191, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report | 29 October 2010 | Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report | |
ML102930505 | 20 October 2010 | GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades | |
ML102950281 | 20 October 2010 | Part 21 Notification - Crack Indications in Marathon Control Rod Blades | |
IR 05000237/2010202 | 15 October 2010 | Letter to Robert C. Johnson 05000237-10-202 and 05000249-10-202 | Affidavit |
IR 05000237/2010201 | 14 October 2010 | IR 05000237-10-201, IR 05000249-10-201; on May 10 - 13, 2010; Dresden Nuclear Power Station, Units 2 and 3; Target Set Inspection. - Cover Letter | Affidavit |
RS-10-172, Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | 12 October 2010 | Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | Safe Shutdown High Radiation Area Anticipated operational occurrence Time to boil Enforcement Discretion Probabilistic Risk Assessment Large early release frequency Control of Heavy Loads Fuel cladding Scaffolding Backfit Power change |
ML102230390 | 9 October 2010 | Initial License Exam, Admin JPMs | Job Performance Measure |
RS-10-165, Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | 6 October 2010 | Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Reactor Vessel Water Level Met Tower Condition Adverse to Quality Significance Determination Process Fatality |
TAC:ME4844 | 4 October 2010 | ||
RS-10-021, License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | 4 October 2010 | License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | Anticipated operational occurrence Scram Discharge Volume Fuel cladding Power change |