 Issue dateTitleTopic
NLS2010111, ISFSI - Sixty-Day Follow-Up Report29 December 2010ISFSI - Sixty-Day Follow-Up Report
ML10351003115 December 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10350017415 December 2010Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
IR 05000298/201040314 December 2010IR 05000298-10-403, on 11/18/2010, Cooper Nuclear Station - NRC Security InspectionAffidavit
NLS2010109, ISFSI, Thirty-Day Notification Pursuant to 10 CFR 72.212, for Storage of Spent Fuel14 December 2010ISFSI, Thirty-Day Notification Pursuant to 10 CFR 72.212, for Storage of Spent Fuel
ML10281053123 November 2010G20100667/LTR-10-0482/EDATS: SECY-2010-0532 - Ltr. Said Abdel-Khalik Report on the Safety Aspects of the License Renewal Application for the Cooper Nuclear StationAging Management
NLS2010103, ISFSI, Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 72.210 for Storage of Spent Fuel23 November 2010ISFSI, Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 72.210 for Storage of Spent Fuel
NLS2010102, Clarification to Revision to License Renewal Commitment Cooper Nuclear Station18 November 2010Clarification to Revision to License Renewal Commitment Cooper Nuclear Station
Press Release-IV-10-038, NRC Names New Senior Resident Inspector at Cooper Nuclear Station17 November 2010Press Release-IV-10-038: NRC Names New Senior Resident Inspector at Cooper Nuclear StationNew Resident Inspector
NLS2010099, ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212 for Storage of Spent Fuel15 November 2010ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212 for Storage of Spent Fuel
NLS2010100, Revision to License Renewal Commitment15 November 2010Revision to License Renewal Commitment
ML10319073011 November 2010Notification of Potential Part 21 on External Leakage in Solenoid Valve
IR 05000298/20100045 November 2010IR 05000298-10-004; on 06/24/2010 - 09/23/2010; Cooper Nuclear Station, Integrated Resident and Regional Report; Maintenance Effectiveness, Exercise Evaluation, Event Follow-upFitness for Duty
High winds
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Maintenance Rule Program
Biofouling
Fire Protection Program
Downpower
Unidentified leak
Siren
ML10307000931 October 2010NUREG-1944 Safety Evaluation Report Related to the License Renewal of Cooper Nuclear Station.
NLS2010043, License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements29 October 2010License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance RequirementsSafe Shutdown
Anticipated operational occurrence
Battery sizing
ML10292046329 October 2010Summary of Pre-Licensing Meeting with Nebraska Public Power District to Discuss Future License Amendment Request for Cooper Nuclear Station TSTF-493, Revision 4, Clarify Application of Setpoint Methodology for LSSS Functions
TAC:ME497429 October 2010
ML10295028120 October 2010Part 21 Notification - Crack Indications in Marathon Control Rod Blades
ML10293050520 October 2010GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades
ML10292029619 October 2010Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station
ML10294003318 October 2010Notification of Potential Part 21 on External Leakage in Solenoid Valve
ML10299030718 October 2010Part 21 Report Regarding External Leakage in NP8320 Solenoid Valve
ML1022204498 October 2010Request for Relief No. RI-04 for the Fourth 10-Year Inservice Inspection Interval Regarding Inspection of Reactor Vessel Nozzle-to-Vessel Shell WeldsIncorporated by reference
TAC:ME48867 October 2010
ML1028000027 October 2010Notice of Forthcoming Meeting with Nebraska Public Power District to Discuss Future License Amendment Request for Cooper Nuclear Station Related to TSTF-493, Revision 4, Clarify Application of Setpoint Methodology for LSSS Functions
NLS2010088, 10 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2008 to 07/31/20107 October 201010 CFR 50.59(d)(2) Summary Report of Evaluations Performed from 08/01/2008 to 07/31/2010Ultimate heat sink
Fuel cladding
Downpower
ML1028505177 October 2010S. Wastler Memo Technical Assistance Request - Review of Proposed Amendment to the Cooper Power Station Physical Security Plan (TAC L24478)
TAC:L244787 October 2010