Issue date | Title | Topic | |
---|---|---|---|
ML090080512 | 31 December 2008 | E-mail #1, Licensee'S Response to Request for Additional Information, Exigent License Amendment Request, Revise Technical Specification 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time (TAC No. ME0271 | |
ML090080487 | 31 December 2008 | E-mail #2, Licensee'S Response to Request for Additional Information, Exigent License Amendment Request, Revise Technical Specification 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time | |
ML083450162 | 24 December 2008 | Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 19, 2008 | |
ML083590221 | 24 December 2008 | Acceptance Review E-Mail, One-Time Exigent Change, Extension to Allowed Outage Time for Technical Specification 3.7.1.7, Main Feedwater System | |
ML083570486 | 23 December 2008 | Individual Notice of Consideration of Issuance of Amendment, 14-day Exigent Circumstances, Revise TS 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time | |
ML083570464 | 23 December 2008 | Letter, Individual Notice of Consideration of Issuance of Amendment, 14-day Exigent Circumstances, Revise TS 3.7.1.7, Main Feedwater System, to Allow One-Time Allowed Outage Time | |
TAC:ME0271 | 19 December 2008 | ||
NOC-AE-08002378, License Amendment Request for Proposed One-time Exigent Change to Technical Specification 3.7.1.7, Main Feedwater System. | 19 December 2008 | License Amendment Request for Proposed One-time Exigent Change to Technical Specification 3.7.1.7, Main Feedwater System. | Probabilistic Risk Assessment Power change |
NOC-AE-08002372, Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720) | 11 December 2008 | Supplement 4 to the Response to Generic Letter 2004-02, (TAC Nos. MC4719 & MC4720) | Ultimate heat sink Safe Shutdown Earthquake Coatings Operating Basis Earthquake Exemption Request Earthquake Fuel cladding |
ML083400255 | 10 December 2008 | Vendor Challenges for New Reactor Construction, Industry Perspective | Commercial Grade Dedication |
ML082750220 | 9 December 2008 | Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 | Incorporated by reference |
TAC:MD8097 | 9 December 2008 | ||
ML083440685 | 9 December 2008 | Closure of Investigation (OI 4-2008-035) | |
ML083230637 | 2 December 2008 | Revised Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b) | Surveillance Frequency Control Program |
ML083510258 | 25 November 2008 | Letter Dated 11/25/08, from FEMA to STP Regarding Revised Final RAIs | |
ML083510257 | 24 November 2008 | FEMA Region VI, Radiological Emergency Preparedness (Rep), South Texas Project (REP) Combined License Review, List of 55 RAIs | |
NOC-AE-08002363, Supplement to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation | 24 November 2008 | Supplement to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation | Shutdown Margin |
ML083170477 | 17 November 2008 | Corrections to Amendments 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5-b) | Surveillance Frequency Control Program |
ML083180440 | 17 November 2008 | Corrections to Amendments 187 and 174 Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 | |
ML083190861 | 13 November 2008 | IR 05000498-08-007, 05000499-08-007, South Texas Project Electric Generating Station - Site Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies Temporary Instruction Inspection | B.5.b Mitigating Strategies |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML091610361 | 12 November 2008 | Map, Drawing U0-P-PP-001-1, Revision E, Plot Plan. Sheet 1 of 2 | |
ML082770785 | 12 November 2008 | Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems | Hydrostatic VT-2 Incorporated by reference |
ML082750337 | 10 November 2008 | Correction to Pages Issued for Amendment Nos. 185 and 172, Adoption of Technical Specifications Task Force (TSTF) Traveler No. TSTF-448, Revision 3, Control Room Envelope Habitability | |
IR 05000498/2008004 | 6 November 2008 | IR 05000498-08-004 & 05000499-08-004 on 6/29-/2008 - 9/27/2008 for South Texas Project Electric Generating Station, Units 1 and 2 | Safe Shutdown High winds High Radiation Area Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Locked High Radiation Area Significance Determination Process Severe Accident Management Guideline Fuel cladding Biofouling Fire Protection Program Siren |
NOC-AE-08002360, Cycle 14 Core Operating Limits Report | 4 November 2008 | Cycle 14 Core Operating Limits Report | Shutdown Margin |
ML082830172 | 31 October 2008 | Issuance of Amendment Nos. 188 and 175, Relocate Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (Risk-Informed Initiative 5b) | Shutdown Margin Ultimate heat sink Grab sample Hydrostatic Probabilistic Risk Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Large early release frequency Backfit |
ML082970736 | 28 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
ML082810286 | 16 October 2008 | License Amendment Nos. 187 and 174, Revise TS 3.3.1, Reactor Trip Instrumentation, to Establish Required Action for Inoperable Extended Range Neutron Flux Instrumentation | Shutdown Margin |
ML082960801 | 14 October 2008 | Ltr. to Elmo E. Collins, Dated 10-14-2008, from FEMA Region 6, Denton, Texas, Copy of the Radiological Emergency Preparedness Final Report to STP Plume Pathway Exercise Evaluated on 7-23-2008 | Fuel cladding |
NOC-AE-08002355, Nine-Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 13 October 2008 | Nine-Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | High Radiation Area Hydrostatic |
ML082890498 | 9 October 2008 | Request for Review of Proposed Changes to Updated Final Safety Analysis Report Section 13.7 for Assessment of Risk Significance | |
NOC-AE-08002353, CFR 50.46 Annual Report of ECCS Model Revisions | 8 October 2008 | CFR 50.46 Annual Report of ECCS Model Revisions |