Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NRC 2002-0110, Security Plan Revisions | 20 December 2002 | Security Plan Revisions | |
NRC 2002-0109, Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 212 | 20 December 2002 | Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 212 | |
ML031110188 | 19 December 2002 | E-mail from J. Dozier to Deirdre Spaulding Regarding Point Beach INES Reporting | |
ML031110180 | 13 December 2002 | E-mail from Geoffrey Grant to Cynthia Carpenter Regarding Point Beach | |
ML030830151 | 12 December 2002 | Possible Common Mode Failure of Aux Feed Recirculation Lines, RCE00019l Draft | |
ML023250094 | 12 December 2002 | Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 15-Day Response | |
ML030760097 | 11 December 2002 | CA003702 Review the Description of the AFW Recirculation Line Function in the FSAR, DBD-01, and the IST Program for Consistency and Accuracy, and Initiate Revisions as Required. Printed 12/11/2002 | Probabilistic Risk Assessment Coast down |
Press Release-02-143, NRC Approves Power Uprate for Point Beach Nuclear Plant | 11 December 2002 | Press Release-02-143: NRC Approves Power Uprate for Point Beach Nuclear Plant | |
NRC 2002-0106, November 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 | 10 December 2002 | November 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 | |
ML030620247 | 10 December 2002 | E-mail from Paul Krohn to Kenneth Riemer Point Beach Papers for DRP Director Visit | |
ML030620246 | 9 December 2002 | E-mail from Kenneth O'Brien to Paul Krohn Fwd: Draft Exit Summary for Point Beach Sit. Partially Withheld | |
ML030830108 | 9 December 2002 | E-mail from Paul Krohn to Ken Riemer Et. Al. Regarding: Pb AFW Interim Exit Time. | |
ML030830106 | 9 December 2002 | E-mail from Ken O'Brien to Fritzie Flentje, Wisconsin Electric Regarding: AFW Corrective Actions. Confirms Receipt of Documents Provided in 12/09/2002 E-mail | |
ML030830102 | 9 December 2002 | E-mail from Fritzie Flentje, Wisconsin Electric, to Ken O'Brien Regarding: AFW Corrective Actions. | Temporary Modification |
ML030830058 | 9 December 2002 | E-mail from Krohn to Goldfeiz and Houghton, Fwd: CSP-H.1 Unit 1 | |
ML030830064 | 9 December 2002 | E-mail from Krohn to Goldfeiz and Houghton, Fwd: CSP-H.1 Unit 2 | |
NRC 2002-0107, Emergency Plan Implementing Procedure Revisions for Point Beach Nuclear Plant, Units 1 & 2 | 6 December 2002 | Emergency Plan Implementing Procedure Revisions for Point Beach Nuclear Plant, Units 1 & 2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Grab sample Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Operating Basis Earthquake Severe Accident Management Guideline Safeguards Contingency Plan Earthquake Turbine Missile Fuel cladding Power change |
ML030830057 | 5 December 2002 | E-mail Riemer to Ramirez Et Al., Fwd: Strategic Plan Measure Related to Significant Precusors (Sic) | |
ML031110195 | 5 December 2002 | E-mail from Kenneth Riemer to Various Addressees, Regarding Strategic Plan Measure Related to Significant Precusors. | |
ML030620240 | 4 December 2002 | E-mail from Kenneth Riemer to Deidre Spaulding Et,Al Point Beach Information. Partially Withheld | |
ML031110178 | 4 December 2002 | E-mail from Eliezer Goldfeiz to Kenneth O'Brien Regarding FR-H.1 Response to Loss of Secondary Heat Sink | |
ML030830053 | 3 December 2002 | E-mail from James Masterlark, Wisconsin Electric, to Sonia Burgess Et. Al. Regarding, Risk Estimates for Pbnp AFW Issues. | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML030620221 | 2 December 2002 | E-mail from Kenneth O'Brien to Kenneth Riemer Et,Al Draft Exit Summary for Point Beach Sit. Partially Withheld | |
ML031080561 | 2 December 2002 | E-mail from Michael Cheok to Cynthia Carpenter, Subject: Strategic Plan Measure Related to Significant Precusors | |
ML030790388 | 30 November 2002 | CA026917 - Review of QA-scope Flow Restricting Devices at Pbnp | |
ML030790394 | 30 November 2002 | NMC Open Issues Table | |
ML030790408 | 30 November 2002 | Control of AFW JITT | |
ML030790392 | 30 November 2002 | NMC Open Issues Table | |
ML030790399 | 30 November 2002 | Aux Feed Pump mini-recire Issue | |
ML023370460 | 29 November 2002 | Technical Specifications for Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level | Shutdown Margin Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report |
ML023370133 | 29 November 2002 | Safety Evaluation for Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Finite Element Analysis Pressure and Temperature Limits Report Exemption Request Flow Induced Vibration |
ML031110176 | 29 November 2002 | E-mail from Gary Holahan to Brian Sheron and Samuel Collins Regarding Strategic Plan Measure Related to Significant Precusors | |
ML023370093 | 29 November 2002 | License Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level | |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023120091 | 27 November 2002 | Withholding from Public Disclosure, WCAP-14787, | |
ML023260125 | 27 November 2002 | Withholding from Public Disclosure, MPR-1619, Rev. 0 - Feedwater Flow Measurement with LEFM Chordal Systems, MB4956 and MB4957 | |
ML023260133 | 27 November 2002 | Withholding from Public Disclosure, 1.4% Mur Power Uprate Support NRC RAI Responses Set 1 Question 4 | |
ML023260141 | 27 November 2002 | Withholding from Public Disclosure, WCAP-14787, Revision 2, MB4956 and MB4957 | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
TAC:MB3870 | 26 November 2002 | ||
ML030870888 | 26 November 2002 | Fax from T. C. Kendall, Wisconsin Electric Company, to Ken O'Brien, USNRC, Re Mss Meetings 92-09, 92-11, 92-12 Excerpts, & Excerpts from Revision 0 of AFW Design Basis Document Addressing Recirculation AOV & AFW Recirculation Flow Control O | Safe Shutdown |
ML023080127 | 26 November 2002 | License Amendment, Change of Containment Maximum Pressure TS Limit from 3 PSIG to 2 PSIG | Shutdown Margin |
ML023360451 | 26 November 2002 | Tech Specs for Amendment Nos. 206 and 211 | |
ML030830173 | 25 November 2002 | Fax, Summary of Post-TM I AFW Licensing Correspondence | |
ML023370369 | 25 November 2002 | GFE Registration Letter - February 2003 Examination | Generic Fundamentals Examination |
ML030800604 | 25 November 2002 | Power Supplies and Failure Modes for Auxiliary Feedwater System Electrical Components | |
ML030870885 | 25 November 2002 | Fax, Krohn to Kunowski, Ops Notebook Entries to Address 11/22/2002 Emergent AFW Issues | Mission time |
ML030870882 | 24 November 2002 | Control Room Log Entries Report | |
ML030870880 | 23 November 2002 | Operations Notebook-4 Documents. Includes Contingency Strategy for Failure of One B Train EDG in Regards to Issue Raised by CAP030227 | Mission time |
ML030800583 | 22 November 2002 | 1 Page of Handwritten Notes |