Issue date | Title | Topic | |
---|---|---|---|
IR 05000317/2002012 | 27 December 2002 | IR 05000317-02-012, IR 05000318-02-012; on 11/04-22/2002; Calvert Cliffs Nuclear Power Plant, Units 1 & 2; Biennial Baseline Inspection of the Identification and Resolution of Problems | Boric Acid Non-Destructive Examination Probabilistic Risk Assessment Temporary Modification Significance Determination Process Operability Determination Operability Assessment Siren |
ML030020498 | 23 December 2002 | Comment from Charles H. Cruse Endorsing the NEI Comments and Adding to the Observations Which Have Been Addressed on the Third Year of Implementation of the Reactor Oversight Process | |
ML030020046 | 19 December 2002 | Technical Specifiation Pages for Amendments 255 & 232 Safety Injection Tank Surveillance Frequency | |
ML023600485 | 19 December 2002 | Tech Spec Bases, Rev 13, for Calvert Cliffs Nuclear Power Plant | |
ML023530642 | 19 December 2002 | Calvert Cliff, Unit Nos. 1 & 2, License Amendments 225 & 232 Safety Injection Tank Surveillance Frequency | Boric Acid Probabilistic Risk Assessment Large early release frequency |
ML023600286 | 18 December 2002 | Response to NRC Request for Additional Information Regarding ASME Section XI Relief Request to Use Alternative Techniques for Reactor Vessel Head Repair | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML023510056 | 13 December 2002 | License Amend Request: Removal of Charging Pumps from Emergency Core Cooling System Technical Specification | |
ML023520414 | 13 December 2002 | November 2002 Monthly Operating Report for Calvert Cliffs, Units 1 & 2 | |
ML023510053 | 12 December 2002 | Response to Request for Additional Information Concerning the License Amendment Request to Revise the Refueling Operations Section of the Technical Specifications | |
ML023450407 | 11 December 2002 | Request for Additional Information, Related to Revision of Technical Specification 3.7.11 to Adopt Technical Specification Task Force-51 | |
TAC:MB5414 | 11 December 2002 | ||
ML022400245 | 6 December 2002 | Environmental Assessment, Calvert Cliffs Request for an Exemption Dated August 6, 2002 That Would Allow Up to Four Lead Fuel Assemblies Manufactured by Framatome Anp, Inc., with Fuel Rods Clad With... (Tac No. MB4064) | Fuel cladding |
TAC:MB6792 | 6 December 2002 | ||
ML023290166 | 20 November 2002 | Emergency Response Data System, Revision | |
ML023230447 | 19 November 2002 | Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Request for Additional Information | Boric Acid VT-2 Pressure Boundary Leakage |
ML023190384 | 15 November 2002 | 2002 Assessment Follow-Up - Calvert Cliffs Nuclear Power Plant | |
ML023240259 | 15 November 2002 | October 2002 Monthly Operating Report for Calvert Cliffs Units 1 & 2 | |
ML023190089 | 12 November 2002 | Third Interval Inservice Inspection Program Relief Request No. RR-RI-ISI-2; Risk Informed Inservice Inspection (ISI) Program | |
IR 05000317/2002011 | 7 November 2002 | IR 05000317-02-011; 05000318-02-011, on October 8-11, 2002; Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Actions on White Finding in Area of Elevated Radiation Dose Rates on Package Exterior | |
ML023100166 | 6 November 2002 | Request for Additional Information, Related to Relief Request | Nondestructive Examination |
IR 05000317/2002005 | 6 November 2002 | IR 05000317-02-005, 05000318/2002-005, on 06/30 - 09/28/2002, Calvert Cliffs Nuclear Plant, Inc.; Calvert Cliffs Nuclear Power Plant, Units 1 & 2. Radioactive Material Processing and Transportation | Fire Barrier Temporary Modification Significance Determination Process Operability Determination Power-Operated Valves Exclusive Use |
ML023110124 | 4 November 2002 | Emergency Response Data System | |
ML023050012 | 29 October 2002 | Request for Relief from ASME Code Requirements to Authorize Use of Mechanical Seal Assemblies at Calvert Cliffs Nuclear Power Plant as an Alternate Repair Method | VT-2 |
ML023020140 | 25 October 2002 | Transmittal of Foreign Ownership Control or Influence and Standard Practice Procedures Plan | |
ML023240395 | 24 October 2002 | Task Order No. 129 Under Contract No. NRC-03-98-021 | |
ML022810341 | 23 October 2002 | Request for Withholding Information from Public Disclosure (TAC Nos. MB5646 & MB5647) | Fuel cladding |
TAC:MB5646 | 23 October 2002 | ||
ML022980062 | 22 October 2002 | ASME Section XI Relief Request to Use Alternative to Inservice Inspection Requirements for Replacement Steam Generator Girth Welds | |
ML022940014 | 15 October 2002 | September 2002 Monthly Operating Report for Calvert Cliffs Units 1 & 2 | |
ML022880116 | 15 October 2002 | Evaluation of the Risk Assessment Information Provided by Calvert Cliffs Nuclear Power Plant in Support of Its Request to Decrease the Surveillance Testing Interval for Verifying Boron Concentration in the Safety Injection Tanks from Once E | Boric Acid Large early release frequency |
ML022890492 | 9 October 2002 | Calver Cliffs Units 1 & 2 Response to a Notice of Violation - NRC IR 05000317-02-010; 05000318-02-010 | |
ML071970241 | 2 October 2002 | Drawing 60726, Rev. 59, Nitrogen Generating & Blanketing System. |