Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group December 13, 2002 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-3 18 November 2002 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions, please contact Mr. Thomas S. O'Meara at (410) 495-6940.
-- _VQ~y ruly yourq~
for Kevin J. Nietmann Plant General Manager KJN/PSF/bjd Attachments cc:
J. Petro, Esquire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC D. M. Skay, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR J. Wright, INPO K. N. Larson, ANI
OPERATING DATA REPORT Docket No.
50-317 Calvert Cliffs Unit 1 December 5, 2002 Prepared by Herman 0. Olsen Telephone: (410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
NOVEMBER 2002 845 825 This month NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH) 546.6 537.6 0.0 458,028 Year to-Date 4,813.3 4,766.0 0.0 3,997,849 Cumulative to Date 182,545.4 179,381.7 0.0 146,519,932
- 1.
- 2.
- 3.
4.
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - UI December 5, 2002 Herman 0. Olsen (410) 495-6734 REPORTING MONTH November 2002
' Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
I - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other NO.
[I DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN 2 COMMENTS02-005 02/11/09 5
182.4 H
1 On 11/08/02 at 2140 a reduction in power was commenced in preparation for a scheduled shutdown to repair a Pressurizer Safety Valve (RV-200 seat leakage) and replace the 1 IB Reactor Coolant Pump (RCP) seal.
The outage commenced on 11/09/02 at 0108. The Pressurizer Safety Valve and 1 IB RCP seal were both replaced and tested. The outage ended on 11/16/02 at 1402.
I _____________
J ____________________
J ________________
I ________________
I L
NO.
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I December 5, 2002
SUMMARY
OF OPERATING EXPERIENCE November 2002 The unit began the month at 100% power.
On 11/08/02 at 2140 power was reduced in preparation for a scheduled outage to repair the Pressurizer Safety Valve (RV-200) due to seat leakage and 11 B Reactor Coolant Pump (RCP) mechanical seal. The unit was removed from the grid on 11/09/02 at 0108. The unit was cooled down and entered Mode 5 at 1630. The Pressurizer Safety Valve and 1 B RCP mechanical seal were replaced.
The unit was heated up and taken critical on 11/16/02 at 0649. The unit was paralleled to the grid at 1402.
The unit reached 100% power on 11/17/02 at 0120 and continued to operate at 100% power for the remainder of the month.
OPERATING DATA REPORT Docket No.
50-318 Calvert Cliffs Unit 2 December 5, 2002 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
NOVEMBER 2002 845 835 This month
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED(MWH) 720.0 720.0 0.0 620,810 Year-Cumulative to-Date to Date 8,016.0 176,815.8 8,016.0 174,960.7 0.0 0.0 6,835,564 143,941,442
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 December 5, 2002 Herman 0. Olsen (410) 495-6734 REPORT MONTH November 2002
' Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
I - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.
e
DOCKET NO. 50-3 18 CALVERT CLIFFS - UNIT 2 December 5, 2002
SUMMARY
OF OPERATING EXPERIENCE November 2002 The unit began the month at 100% reactor power.
Power was reduced to 90% on 11/02/02 at 0103 to perform Main Turbine Valve Testing. Following completion of the testing, power was returned to 100% at 0530.
The unit operated at 100% power for the remainder of the month.