ML18295A19924 September 2018Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146
NRC-2018-0045, Duane Arnold Energy Center - FRN -Notice of Withdrawal21 September 2018Duane Arnold Energy Center - FRN -Notice of Withdrawal
ML18250A05521 September 2018FRN -Notice of Withdrawal
ML18250A03821 September 2018Withdrawal of Amendment Request for Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate
ML18255A29211 September 2018NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420
ML18254A2547 September 2018Submittal of Core Operating Limits Report for DAEC Cycle 27 Operation
ML18255A0677 September 2018NextEra Energy Duane Arnold, LLC - Emergency Preparedness Department Document Transmittal Dated 08/01/18
NG-18-0112, NextEra Energy Duane Arnold, LLC - Emergency Plan Preparedness Dated 08/01/187 September 2018NextEra Energy Duane Arnold, LLC - Emergency Plan Preparedness Dated 08/01/18
NG-18-0110, Core Operating Limits Report for DAEC Cycle 27 Operation31 August 2018Core Operating Limits Report for DAEC Cycle 27 OperationMELLLA
NG-18-0106, NextEra Energy Duane Arnold, LLC, Withdrawal of License Amendment Request TSCR-178, Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers30 August 2018NextEra Energy Duane Arnold, LLC, Withdrawal of License Amendment Request TSCR-178, Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers
IR 05000331/201800528 August 2018Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005)
NG-18-0103, Emergency Preparedness Department Document Transmittal Dated 08/01/201822 August 2018Emergency Preparedness Department Document Transmittal Dated 08/01/2018
ML18247A20021 August 2018E-Mailed Request for Information for Duane Arnold, Dated 08/21/18 (DRS-M.Holmberg)
NG-18-0101, Withdrawal of License Amendment Request TSCR-179 to Add Technical Specification 3.2.3, Linear Heat Generation Rate21 August 2018Withdrawal of License Amendment Request TSCR-179 to Add Technical Specification 3.2.3, Linear Heat Generation Rate
ML18179A18416 August 2018Issuance of Amendment 306 to Revise Technical Specification 3.5.1, ECCS-OperatingSurveillance Frequency Control Program
Fire Protection Program
NG-18-0099, Revision to Generic Schedule Provided in NEI 13-12, Open Phase Condition Industry Guidance Document13 August 2018Revision to Generic Schedule Provided in NEI 13-12, Open Phase Condition Industry Guidance DocumentOpen Phase Condition
IR 05000331/20180023 August 2018NRC Integrated Inspection Report 05000331/2018002Tornado Missile
Internal Flooding
Enforcement Discretion
Functionality Assessment
FLEX
Tornado-Generated Missile
Test box
Significance Determination Process
Tornado Missile Protection
Process Control Program
Operability Determination
Maintenance Rule Program
Fire Protection Program
Scaffolding
Power change
Downpower
ML18212A23226 July 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (PaSafe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Fire Barrier
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
Design basis earthquake
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Overtravel
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Grace period
Backfit
Unidentified leakage
ML18212A22726 July 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (Pa
ML18212A22926 July 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (PaTime of Discovery
Probabilistic Risk Assessment
Earthquake
Fuel cladding
Grace period
Backfit
ML18212A23126 July 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (PaSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
NG-18-0090, Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (26 July 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (Pa
ML18199A60326 July 2018Audit Summary for Duane Arnold and Point Beach, License Amendment Requests to Adopt Title 10 of the Code of Federal Regulations Part 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear PowerProbabilistic Risk Assessment
NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)25 July 2018Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)
ML18211A30225 July 2018Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11 KLVS146
ML18192C18324 July 2018Fifth 10-Year Inservice Relief Request RR-05Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Exemption Request
Fire Protection Program
IR 05000331/201841217 July 2018NRC Security Baseline Inspection Report 05000331/2018412 (DRS-G.Bonano)Affidavit