Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16265A009 | 23 September 2016 | Acceptance of Requested Licensing Action License Amendment Request to Change Technical Specifications to Allow the Use of Optimized Zirlo Fuel Rod Cladding Material | |
ML16262A213 | 20 September 2016 | LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 | Significance Determination Process Preliminary White Finding |
IR 05000244/2016009 | 20 September 2016 | LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 | Significance Determination Process Preliminary White Finding |
CAC:MF8238 | 20 September 2016 | ||
ML16253A125 | 20 September 2016 | Fleet License Amendment Request to Revise Technical Specification Requirements for Inservice Testing Program (CAC Nos. MF8238 - MF8256) | |
ML16258A386 | 15 September 2016 | EN-16-021, Issuance of Final Significance Determination and Notice of Violation to Ginna, (EA-16-128) | Significance Determination Process |
ML16230A237 | 6 September 2016 | Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) | Incorporated by reference Through-Wall Leak |
ML16321A450 | 31 August 2016 | Part 21 Notification - Flowserve Swing Check Valves | Anchor Darling |
IR 05000244/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant, (Report 0500244/2016005) | Spent Fuel Pool Instrumentation |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML16235A148 | 29 August 2016 | Project Manager Assignment | |
ML16243A474 | 26 August 2016 | Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16229A239 | 26 August 2016 | R. E. Ginna Nuclear Power Plant - Correction Letter to License Amendment No. 115 Issuance of Amendment to Conform the Renewed Facility Operating License to Reflect the Direct Transfer of Operating Authority | |
CAC:MF2588 | 26 August 2016 | ||
ML16236A096 | 26 August 2016 | R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3 | Surveillance Frequency Control Program |
CAC:MF8300 | 22 August 2016 | ||
CAC:MF8299 | 22 August 2016 | ||
ML16236A300 | 22 August 2016 | License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding | Shutdown Margin Hydrostatic Pressure and Temperature Limits Report Exemption Request Fuel cladding |
IR 05000244/2016002 | 18 August 2016 | LLC - Integrated Inspection Report 05000244/2016002 with Preliminary White Finding, and Independent Spent Fuel Storage Installation Report 07200067/2016001 | Fire Barrier Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Process Control Program Operability Determination Preliminary White Finding Operability Assessment |
ML16228A062 | 15 August 2016 | Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin | Tornado Generated Missile |
ML16229A445 | 15 August 2016 | Interim Part 21 Report Regarding Internal Pump Tolerances Between the Impeller Hub and a Wear Ring | |
ML16232A604 | 15 August 2016 | Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16238A186 | 15 August 2016 | Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 | |
ML16209A496 | 26 July 2016 | Relief Request for Alternative to ASME Code | Incorporated by reference |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
ML16207A113 | 14 July 2016 | Radiological Emergency Plan Annex Revisions | Safe Shutdown Health Physics Network High Radiation Area Grab sample Offsite Dose Calculation Manual Cyber Security Emergency Lighting B.5.b Severe Accident Management Guideline Earthquake Minimum staff Scaffolding Inadvertent Siren Activation Siren Exclusive Use Overexposure |
ML16209A054 | 14 July 2016 | Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R.E. Ginna, Nuclear Radiological Emergency Plan Annex Revisions | Safe Shutdown Cyber Security |
ML16124A038 | 14 July 2016 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Earthquake Fire Protection Program Coast down |
ML16190A385 | 8 July 2016 | EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure | Safe Shutdown Health Physics Network Ultimate heat sink FLEX Severe Accident Management Guideline Minimum staff |