Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000331/201301030 September 2013Preliminary White Choice Letter and Inspection Report 05000331-13-010Safe Shutdown
Mission time
Past operability
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Earthquake
Preliminary White Finding
ML13274A65130 September 2013Inspection Report (IR) 05000331-13-010, 04/08/2013 - 09/05/2013; Duane Arnold Energy Center, Maintenance Effectiveness (Cover Letter)Past operability
Significance Determination Process
Preliminary White Finding
NG-13-0382, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for the Duane Arnold Energy Center30 September 201310 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature for the Duane Arnold Energy Center
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13261A14416 September 2013Official Service List Distribution for Safeguards Information
ML13255A19816 September 2013Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Spent Fuel Pool Instrumentation
TAC:MF012113 September 2013
NG-13-0368, NextEra Energy Duane Arnold, LLC - Revision to Seismic Walk Down Report13 September 2013NextEra Energy Duane Arnold, LLC - Revision to Seismic Walk Down ReportFukushima Dai-Ichi
IR 05000331/201340512 September 2013IR 05000331-13-405; 07/29/2013 - 08/02/2013; Duane Arnold Energy Center; Routine Security Baseline Inspection (Cover Letter Only)Affidavit
NG-13-0364, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sites11 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SitesFukushima Dai-Ichi
ML13210A44910 September 2013Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c)Hot Short
Safe Shutdown
Fire Barrier
Time to boil
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
License Renewal
Power Operated Valves
Fire Protection Program
Exclusive Use
NG-13-0274, License Renewal Commitment Changes6 September 2013License Renewal Commitment ChangesHydrostatic
Aging Management
ML13246A2223 September 20132013 Duane Arnold Energy Center Mid-Cycle Letter Combined
TAC:MF276329 August 2013
NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.429 August 2013License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4Surveillance Frequency Control Program
Battery sizing
NG-13-0341, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants28 August 2013Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating PlantsCyber Security
Fire Protection Program
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
NG-13-0324, First Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation27 August 2013First Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
NG-13-0328, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)27 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)FLEX
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13233A24721 August 2013Ltr 8/21/13 Duane Arnold Lr Request for InformationAging Management
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
NG-13-0318, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants5 August 2013Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation PlantsFire Protection Program
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13210A45830 July 2013Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating PlantsProbabilistic Risk Assessment
Fire Protection Program
ML13189A07125 July 2013Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522Safe Shutdown
Surveillance Frequency Control Program
Fire Protection Program
IR 05000331/201300322 July 2013IR 05000331-13-003; 04/01/2013 - 06/30/2013; Duane Arnold Energy Center; Integrated InspectionUltimate heat sink
Past operability
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Siren
NG-13-0298, CFR 72.48 Report of Changes, Tests, and Experiments22 July 2013CFR 72.48 Report of Changes, Tests, and Experiments
ML13196A1143 July 2013FEMA, Final After Action Report for the May 23, 2013, Medical Service Drill Offsite Radiological Emergency Response Plans Site-Specific to Duane Arnold
NG-13-0287, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2 July 2013Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating PlantsFire Protection Program
NG-13-0281, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2 July 2013Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating PlantsFire Barrier
L-2013-208, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 131 July 2013Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 13Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate