PLA-6553, Notice of Deviation from BWRVIP Guidelines30 September 2010Notice of Deviation from BWRVIP Guidelines
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10278050022 September 2010Revision 8 to Technical Requirements Manual, Unit 1Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML10278049922 September 2010Revision 64 to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hourly Fire Watch
ML10265046122 September 2010Correction to Examination Date: Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Steam Electric Station, Units 1 and 2
ML10253021310 September 2010Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Steam Electric Station, Units 1 and 2
Press Release-I-10-041, NRC Assigns New Resident Inspector to Susquehanna Nuclear Power Plant8 September 2010Press Release-I-10-041: NRC Assigns New Resident Inspector to Susquehanna Nuclear Power PlantNew Resident Inspector
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1025700542 September 2010Revisions to Technical Specification Bases ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
Fuel cladding
ML1025713952 September 2010Technical Specifications Bases ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
Fuel cladding
ML1024404621 September 2010IR 05000387-10-001 and 05000388-10-001 on 08/11/2010 for Susquehanna Steam Electric Station, Units 1 & 2, Mid-Cycle Assessment Letter 2010
PLA-6643, Registration for the Use of Dry Fuel Storage Module B-201 September 2010Registration for the Use of Dry Fuel Storage Module B-20
PLA-6645, Registration for the Use of Dry Fuel Storage Module B-211 September 2010Registration for the Use of Dry Fuel Storage Module B-21
ML10242060530 August 2010ME4068 & ME4069, Draft RAI from Cptb RR-02, Revision 1 for MSRV Test Frequency in the Third 10-Year IST PlanGrace period
TAC:ME442023 August 2010
ML10235002823 August 2010ME4420 & ME4421, Acknowledgment of Withdrawal and Acceptance of Revised LAR Cyber Security PlanCyber Security
ML10215018919 August 2010ME3451, Letter-Proprietary Information Determination Finding for Dryer Data @ 107%, 110.5%, PLA-6612, and PLA-6633Flow Induced Vibration
IR 05000387/201000313 August 2010IR 05000387-10-003, 05000388-10-003, on 04/01/2010 - 06/30/2010; Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Effectiveness, Maintenance Risk Assessment and Emergent Work Control, Operability Evaluations, and Post-MaintenaSafe Shutdown
Mission time
Fire Barrier
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Annual Radiological Effluent Release Report
Pressure boundary leak
Fire Protection Program
Incremental Core Damage Probability Deficit
Operability Assessment
Power Uprate
ML10230065110 August 2010Technical Requirements Manual Unit 2Shutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML10230065010 August 2010Technical Requirements ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
PNO-I-10-005, Susquehanna Alert Due to High Refrigerant Levels in Unit 1 Reactor Bldg10 August 2010PNO-I-10-005 - Susquehanna Alert Due to High Refrigerant Levels in Unit 1 Reactor Bldg
Press Release-I-10-037, NRC Monitoring 'Alert' Declared at Susquehanna Nuclear Power Plant10 August 2010Press Release-I-10-037: NRC Monitoring 'Alert' Declared at Susquehanna Nuclear Power Plant
PNO-I-10-004, A: Update: Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding Event4 August 2010PNO-I-10-004A: Update: Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding EventInternal Flooding
PLA-0066, Learning Center, Response to RIS-2010-08 Preparation and Scheduling of Operator License Examinations2 August 2010Learning Center, Response to RIS-2010-08 Preparation and Scheduling of Operator License ExaminationsGeneric Fundamentals Examination
PLA-6624, Annual Financial Report25 July 2010Annual Financial ReportIncorporated by reference
Earthquake
Grace period
PLA-6637, Registration for the Use of Dry Fuel Storage Module C-1925 July 2010Registration for the Use of Dry Fuel Storage Module C-19
ML10222003022 July 2010Leaks & Spills at Ppl'S Nuclear Power Plant
ML10222003322 July 2010Nuclear Plant Unit Could Be Down for Extended Time
PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan22 July 2010Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security PlanCyber Security
Incorporated by reference
Fuel cladding
ML10214011221 July 2010Revision to Technical Requirements ManualShutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML10214011121 July 2010Technical Specifications Bases Unit 2 Manual ChangesShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Fuel cladding
ML10202035020 July 2010PNO-I-10-004: Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding EventInternal Flooding
PLA-6633, Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been Met15 July 2010Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been MetFlow Induced Vibration
PLA-6629, Letter Regarding Information Related to the Condensate Pump Trip Test Performed on May 28, 201015 July 2010Letter Regarding Information Related to the Condensate Pump Trip Test Performed on May 28, 2010
PLA-6632, Guarantee of Payment of Deferred Premiums - 10 CFR 140.2114 July 2010Guarantee of Payment of Deferred Premiums - 10 CFR 140.21
PLA-6627, Supplemental Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems.14 July 2010Supplemental Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems.
ML10201041212 July 2010Revisions to Technical Requirements ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Annual Radiological Environmental Operating Report
ML10201041112 July 2010Revisions to Technical Specification Bases ManualShutdown Margin
Ultimate heat sink
Stroke time
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML10201038712 July 2010Revision to Technical Requirements ManualShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Annual Radiological Environmental Operating Report
ML10201038512 July 2010Revision 100 to Technical Specifications Bases Unit 2 ManualShutdown Margin
Stroke time
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML1018807517 July 2010Acceptance of Requested Licensing Action Susquehanna Units 1 and 2 Relief Request RR-02 (TAC No. ME4068 & ME4069)Grace period
ML1018907391 July 2010Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm
ML1018201601 July 2010Notification of Potential Part 21 Reportable Condition Re Failure of HPCI Turbine Overspeed Reset Control Valve Diaphragm