ML102300651
ML102300651 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 08/10/2010 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML102300651 (28) | |
Text
Aug. 10, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-34109 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 08/10/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/20/2010 ADD MANUAL TABLE OF CONTENTS DATE: 08/09/2010 CATEGORY: DOCUMENTS TYPE: TRM2 A001/
Aug. 10, 2010 Page 2 of 2 ID: TEXT B3.3.10 REMOVE: REV:I ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 63 REMOVE: REV:62 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 08/09/2010 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 63 08/09/2010
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 18 07/20/2010
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 9 02/12/2010
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Report Date: 08/09/10 Pagel Page 1 of of i~.
15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6 07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION!
TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 .12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP. MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Report Date: 08/09/10 Page 2Z of of 15 1.
15 Report-Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 0 07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT. SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 . 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES-TEXT 3.7.3.8 8 01/20/2010 Tiftle: PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 08/09/10 Page 4 Page 4 of of 15 15 Report Date: 08/09/10
SSES MANUAL
- Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR' OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS
- TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page a of 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 8.3 1 04/05/2010
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/,2002
Title:
REFUELING OPERATIONS DECAY TIME -
TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Report Date: 08/09/10 Page 6~
Page of of 15 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID'WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 .11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 08/09/10 Page2.7 Page of of 15.
15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY, COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY-LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES- & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 08/09/10 Page8 Page -~ of of 15 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4 -05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 ý 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007
Title:
INSTRUMENTATION BASES SEISMiC'MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/2010
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Report Date: 08/09/10 Page ~
Page9 of of 15 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 2 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW:PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 0 07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 08/09/10 Page ~&
Page 10 of of 15 15 Report Date: 08/09/10
SSES MANUAL
. Manual
Title:
Manual Name: TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RC I C BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 I
Title:
ECCS AND RC C BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 I
Title:
ECCS AND RC C BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEIM ES BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEIMd IS BASES ULTIMATE 'HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEIM IS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEI MIS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEI MIS BASES C02 SYSTEMS Report Date: 08/09/10 Page ii11 of of 15 15 Report Date: 08/09/10
SSES MANUJAL.
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 1 04/26/2006
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES. LIQUID HOLDUP TANKS TEXT B3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS BASES ESSW PUIMPHOUSE.VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3 06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS Report Date: 08/09/10 ii Page 12 of of 15 15 Report Date: 08/09/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9 .1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Report Date: 08/09/10 Page 13.
13 of of 15 15 Report Date: 08/09/10
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE. LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Report Date: 08/09/10 Page JA Page 14 of of 15 15 Report Date: 08/09/10
SSES M4ANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3 07/09/2010
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 :11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 08/09/10 Page j5.
15 of of 15 15 Report DatO: 08/09/10
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 07/15/2010 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 04/15/2009 Page TRM / 2.0-9 11/15/2004 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/17/2009 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 TRM / LOES-1 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / LOES-1 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.3-9 and TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Pages TRM / 3.3-11 and TRM / 3.3-11a 06/30/2010 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 07/15/2010 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 TRM / LOES-2 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / LOES-2 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 10/05/2006 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009 Page TRM / 3.7-56 04/01/2009 TRM / LOES-3 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 22 TRM / LOES-3 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 TRM / LOES-4 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / LOES-4 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM 13.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM 1(3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA-- UNIT 2 TRM / LOES-5 SUSQUEHANNA UNIT 2 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/31/2007 Page TRM / B 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 08/03/2010 I Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 TRM / LOES-6 EFFECTIVE DATE 08/03/2010 UNIT 2 SUSQUEHANNA-- UNIT SUSQUEHANNA 2 TRM / LOES-6 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM / B 3.4-7 07/15/2010 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM I B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-10a through TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Page TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-1 la 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM/ B 3.11-20 04/02/2002 Page TRM / B 3.1 1-20a 04/02/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 08/03/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 63 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 06/30/2010 Pages TRM / B 3.11-31 and TRM / B 3.11-32 08/31/1998 Page TRM / B 3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM / B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 8/3/2010 TRM / LOES-9 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 2 2 TRM / LOES-9 EFFECTIVE DATE 08/03/2010
Reactor Recirculation Pump MG Set Stops PPL Rev. 2 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES TRO In the case of recirculation control system failures (e.g., transistors, resistors, etc.) causing upscale signal failure, the reactor is protected by high pressure or high flux scram. Such faults have been analyzed in Chapter 15 and include both MG sets going to full speed simultaneously.
For this analysis, the master flow controller is assumed to fail such that it causes a speed increase for both recirculation pumps.
Pump overspeed occurs during the course of a LOCA due to blowdown through the broken loop pump. Design studies determined that rotating component failure missiles caused by the overspeed was not sufficient to cause damage to the containment or to vital equipment, consequently no protective or preventative provision is made for this pump overspeed condition.
Normally, operator implementation or procedural controls maintains the recirculation system within the system design limits and initial conditions of analyzed events. The reactor recirculation pump MG set stops are set with some operating margin above these limits. As such, the stops serve as backups to the operator control over normal operation. Additionally, in the event of a fault that results in inadvertent MG set speed increases above the normal operating limits, the stops can provide protection from the automatic reactor scram that terminate the analyzed worse case events. Therefore, the MG set stops also serve to provide additional plant reliability protection.
The electrical stop is the primary means for backing up procedural controls and for automatically limiting recirculation flow. The electrical stop is the MG Set Positioner Controller Program Stop. The mechanical stop provides a diverse and redundant automatic backup to the electrical stop flow limiting mechanism.
ACTIONS The Actions are modified by a Note allowing separate Condition entry for each recirculation pump. The Required Actions provide appropriate compensatory measures for each recirculation loop independent of the other loop.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-20 EFFECTIVE DATE 08/03/2010
Reactor Recirculation Pump MG Set Stops PPL Rev. 2 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES ACTIONS A.1 (continued)
Either the electrical or the mechanical stop can provide backup protection to the procedural controls in place to maintain recirculation pump operation within the system design limits and initial conditions of analyzed events. In the event one of these backup features is inoperable, it is reasonable to extend the restoration time (in the event conditions do not permit more timely corrective action) until the next scheduled required calibration. With the backup protection of the electrical or mechanical stop remaining OPERABLE, backup protection remains and allows time to schedule and plan appropriate repairs. Since Chapter 15 analyses assume that the MG sets reach full speed, this Completion Time is considered appropriate.
B.1 With both the electrical and mechanical stops inoperable for any recirculation pump MG set, the automatic backup protection is not available.
In this case, the scoop tube is locked in place to protect against unintended /
inadvertent speed increases. This action conservatively compensates for lack of backup protection and allows continued operation until at least one MG set stop function (electrical or mechanical) is restored to operable status. The Required Action is modified by a Note allowing intermittent unlocking of the scoop tube. This may be required for power reductions or other power level adjustments. The administrative control consists of stationing a dedicated operator at the controls while the scoop tube is unlocked and the duration should be limited to the time necessary to complete the change in core flow.
TRS The TRS assures that the stops are demonstrated OPERABLE at least once per cycle. Normal scoop tube positioner calibration is performed after each refueling outage. Inoperable stops are detectable on line during scoop tube positioner calibration.
REFERENCES 1. FSAR Section 5.4.1.4.
- 2. FSAR Section 7.7.2.3.1.
- 3. FSAR Section 15.4.5.
SUSQUEHANNA - UNIT 2 TRM / B 3.3-21 EFFECTIVE DATE 08/03/2010