ML102010412
| ML102010412 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/12/2010 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML102010412 (42) | |
Text
Jul.
12, 2010 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-29065 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 07/12/2010 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/15/2010 ADD MANUAL TABLE OF CONTENTS DATE: 07/09/2010 CATEGORY:
DOCUMENTS TYPE: TRM2
/
'A Aeoi/
Jul.
12, 2010 Page 2
of 2
ID:
TEXT 3.3.4 ADD:
REV:
6 REMOVE:
REV:5 CATEGORY:
DOCUMENTS ID:
TEXT B3.11.4.1 ADD:
REV:
3 REMOVE:
REV:2 CATEGORY:
DOCUMENTS ID:
TEXT B3.3.4 ADD:
REV:
4 TYPE: TRM2 TYPE: TRM2 REMOVE:
REV:3 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS LOES REV:60 TYPE: TRM2 ADD:
REV:
61 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
07/09/2010 Procedure Name TEXT LOES
Title:
LIST OF EF]
Rev 61 FECTIVE SECTIONS Issue Date 07/09/2010 Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
17 04/05/2010 TABLE OF CONTENTS 0
11/19/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 9
02/12/2010
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0
Title:
4 05/23/2008 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8
05/14/2009
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Page 1 of 15 Report Date: 07/09/10 Page 1 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3. 1
Title:
INSTRUMENTATION 0
11/19/2002 RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2
11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3
Title:
INSTRUMENTATION 2
11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3. 6
Title:
INSTRUMENTATION 2
10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 15 Report Date: 07/09/10 Page 2 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of 15 Report Date: 07/09/10
SSES MANUA-AI Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
SYSTEMS C02 SYSTEMS 2
SYSTEMS HALON SYSTEMS 04/16/2009 04/16/2009 TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 8
01/20/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 07/09/10 Page 4 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2
06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7. 8
Title:
PLANT SYSTEMS SNUBBERS 6
06/21/2007 TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
PLANT SYSTEMS 1
10/02/2009 TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT 3.8.3 1
04/05/2010
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES Page5 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Page 6 of 15 Report Date: 07/09/10
SSES MANU.AL~
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM EFFLUENTS 1
12/14/2004 EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3
11/14/2006 VENTILATION EXHAUST 4
09/16/2009 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 EFFLUENTS TOTAL DOSE 3
04/26/2006 EFFLUENTS MONITORING PROGRAM 2
04/26/2006 EFFLUENTS LAND USE CENSUS Page 2 of 15 Report Date: 07/09/10 Page7 of
.15 Report Date: 07/09/10
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM TEXT 3.12.2
Title:
LOADS CONTROL PROGRAM TEXT 3.12.3
Title:
LOADS CONTROL PROGRAM 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM 0
11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL 4
04/17/2008 HEAVY LOADS REQUIREMENTS 0
11/19/2002 LIGHT LOADS REQUIREMENTS TEXT 4. 1
Title:
TEXT 4. 2
Title:
TEXT 4. 3
Title:
TEXT 4. 4
Title:
TEXT 4. 5
Title:
TEXT 4. 6
Title:
TEXT 4. 7
Title:
0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING TEXT B3.0 4
05/23/2008 9
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY Page 8 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD AND CHECK VALVE TRANSIENT WITHOUT SCRAM ALTERNATE DRIVE (CRD)
HOUSING SUPPORT BLOCK INSTRUMENTATION SCRAM ACCUMULATORS INSTRUMENTATION TEXT B3.2.1
Title:
CORE OPERATING L TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION IMITS 0
11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1
11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3
10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1
11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM Page i of 15 Report Date: 07/09/10 Page 9 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 3
05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 1
12/18/2008 BASES REACTOR RECIRCULATION PUMP MG 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION SET STOPS TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR TEXT B3.5.1 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION Page 10 of 1_55 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1
Title:
CONTAINMENT TEXT B3.6.2
Title:
CONTAINMENT INDICATION 0
11/19/2002 BASES VENTING OR PURGING 0
11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS 1
04/26/2006 HALON SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS Page ii of 15 Report Date: 07/09/10 Page 11 of 15 Report Date: 07/09/10
SSES MANTJA-Z Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1
04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 FIRE RATED ASSEMBLIES 1
01/12/2004 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 2
06/27/2008 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2
01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS Page ia of 15 Report Date: 07/09/10 Page 12 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.11
Title:
STRUCTURAL TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
04/14/2010 INTEGRITY 2
03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM Page 13 of 15 Report Date: 07/09/10 Page 13 of
.15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.10.1
Title:
MISCELLANEOUS TEXT B3.10.2
Title:
MISCELLANEOUS 0
11/19/2002 BASES SEALED SOURCE CONTAMINATION 1
04/10/2007 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.'1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0
11/19/2002 EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS 1
12/14/2004 BASES DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM Page 14 of 15 Report Date: 07/09/10 Page 14 of 15 Report Date: 07/09/10
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.5 4
11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3
07/09/2010
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1
10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page i~
of 15 Report Date: 07/09/10 Page 15 of
.15 Report Date: 07/09/10
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM /1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page. TRM / 2.0-8 Page TRM I 2.0-9 Page TRM I 2.0-10 Page TRM /2.0-11 Page TRM 12.0-12 Pages TRM / 2.0-13 and TRM /2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM 13.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM 1 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Effective Date 03/25/2010 08/3111998 10/04/2002 08/31/1998 08131/1998 01/28/2005 06/2512002 04/12/1999 04/15/2009 05/1512008 04/15/2009 11/15/2004 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 3.1 3.2 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.3 SUSQUEHANNA
- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/30/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM /3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM 13.3-13 Page TRM / 3.3-14 Page TRM 1 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM 1 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM 1 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM 13.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/3112007 06/30/2010 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 II 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM 1 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM /13.7-12 Page TRM /3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM 1 3.7-17 Page TRM 1 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM 1 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM 1 3.7-25 and TRM I 3.7-26 Page TRM 13.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM I 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM 1 3.7-53 Page TRM / 3.7-54 Page TRM 13.7-55 Page TRM / 3.7-56 Effective Date 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04107/2009 01/21/2000 08/02/1999 04/07/2009 08(09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 01/13/2010 11/30/2005 11/1612001 01/09/2004 10/05/2002 03/3112006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/2012008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA-UNIT2 TRM / LOES-3 EFFECTIVE DATE 06/30/2010 SUSQUEHANNA - UNIT 2 TRM / LOES EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4.
Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM I 3.8-27 Page TRM /3.8-28 Page TRM / 3.8-29 Effective Date 04/02/2002 01/28/2005 01/31/2005 04/02/2002 1p/31/2007 08/10/2004 12/03/2004 03/2512010 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM /3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/0311004 09/01/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3A11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM /3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA-UNIT2 TRM / LOES-5 EFFECTIVE DATE 06/30/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM I B 3.0-10 Pages TRM / B 3.0-11 and TRM I B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM I B 3.3-3a Page TRM I B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM I B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM I B 3.3-24 and TRM / B 3.3-25 Effective Date 0813111998 01/1012007 04/14/2008 08/31/1998 04112/2007 08/31/1998 03/15/2002 11130/2005 03/15/2002 07/13/1999 10/3112007 08/3111998 03/27/2007 02/18/1999 08/31/1998 0410712000 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/2212003 0312712007 03/27/2007 04/17/2009 03/27/2007 12/111/2008 05/16/2003 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM/ILOES-6 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 B3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM I B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM I B 3.6-1 Page TRM I B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM i B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM I B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM I B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM I B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM I B 3.7-24 through TRM / B 3.7-29 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08102/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10105/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 06/30/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 06/3012010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM I B 3.7-34 Page TRM I B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM I B 3.8-3 Page TRM I B 3.8-3a Page TRM / B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM I B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 06/07/2007 10/05/2006 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 0912512009 04/01/2009 04/08/2010 04/02/2002 01128/2005 03/01/2010 04/02/2002 04/02/2002 04/02/2002 08/1012004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/2812009 08/31/1998 10/2311998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08131/1998 04102/2002 04/02/2002 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM I B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRMIB 3.11-13 Page TRM / B 3.11-14 Page TRM/ B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM I B 3.11-20 Page TRM / B 3.11-20a SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 06/30/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 61 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM I B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 05/13/2005 11114/2006 05113/2005 01/21/2004 08/31/1998 11/30/2005 06130/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 02/05/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 716/10 SUSQUEHANNA
- UNIT 2 TRM / LOES-9 EFFECTIVE DATE 06/30/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 06130/2010
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 6 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.4-1 ACTIONS
NOTES-
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.06 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Enter the Condition Immediately channel inoperable, referenced in Table 3.3.4-1 for the channel.
B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A. 1 and referenced alternate method of in Table 3.3.4-1.
monitoring the appropriate parameter(s).
AND B.2 Restore the required channel 7 days to OPERABLE status.
C. As required by Required C.1 Restore the required 30 days Action A. 1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.3-9 EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME OR D.2 Verify SRV tailpipe temperature indication and alarm are available for the tailpipe associated with the inoperable acoustic monitor.
OR D.3 Verify that the following alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE:
- Function 1
- Function 2
- Function 3
- Function 10 AND D.4.
Restore the required channel(s) to OPERABLE status.
Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Immediately AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 30 days OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA - UNIT 2 TRM / 3.3-9a EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.6 TECHNICAL REQUIREMENT SURVEILLANCE NOTES.
- 1.
Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.
SUSQUEHANNA - UNIT 2 TRM / 3.3-10 EFFECTIVE DATE 10/31/2007
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.6 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 1.
Suppression Chamber Air Temperature
- 2.
Main Steam Safety/Relief Valve Position Indicator (Acoustic Monitor)
- 3.
Reactor Building Vent Noble Gas Monitor 1,2 1,2 2
1/valve C
D TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.2 TRS 3.3.4.3
- a. Mid Range(b)
- b. High Range(b) 1,2, (a) 1,2, (a)
I I
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- a. Mid Range(b)
- b. High Range(b) 1,2, (a) 1,2, (a) 2 B (Both Ch. Inop)
C (One Ch. Inop) 2 B (Both Ch. Inop)
C (One Ch. Inop)
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4
- 5.
Turbine Building Vent Noble Gas Monitor
- a. Mid Range(b)
- b. High Range(b) 1,2 1,2 2
B (Both Ch. Inop)
C (One Ch. Inop) 2 B (Both Ch. Inop)
C (One Ch. Inop)
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 (continued)
SUSQUEHANNA - UNIT 2 TRM / 3.3-11 EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.6 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
- a.
Effluent System flow rate monitor(b)
- b. Sampler flow rate monitor(b) 1,2, (a) 1,2, (a)
I 1
- 7.
Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
- a.
Effluent System flow rate monitor(b)
- b. Sampler flow rate monitor(b)
- 8.
Containment H 2 and 02 Analyzer(b) 1,2 1,2 1,2 2
TRS 3.3.4.1 TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) The provisions of TRO 3.0.4 are not applicable.
SUSQUEHANNA - UNIT 2 TRM / 3.3-11 a EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation PPL Rev. 4 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident,"
NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NEDO-33160-A Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System" (Reference 6). It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
LOOP A LOOP B TE-25703 TE-25725 TT-25703 0
TT-25725 TR-25795A
° TR-25795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position include SRV Tailpipe Temperature and the following Functions from Technical Specification Table 3.3.3.1-1:
Suppression Chamber Water Level (Function 3)
Suppression Chamber Water Temperature (Function 10)
Reactor Vessel Water Level (Function 2)
Reactor Steam Dome Pressure (Function 1)
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-4 EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev. 4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued)
The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.
For the Noble Gas Monitors the only required channels are the mid range and high range. For the Standby Gas Treatment System Vent Noble Gas Monitor and the Turbine Building Vent Noble Gas Monitor, the "2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor; and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.
The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-5 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation PPL Rev. 4 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of the I acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The Technical Requirement Surveillances (TRS) are modified by two Notes.
Note 1 states that the TRSs for each Post Accident Monitoring instrumentation Function are located in the SR column of Table 3.3.4-1.
Note 2 modifies the Surveillances to indicate that when a channel is placed in a inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or associated Function are available. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-6 EFFECTIVE DATE 06/30/2010
TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev. 4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS (continued)
The alternate means of monitoring the parameter or the associated function are: I Parameter Alternate Means/Associated Function Suppression Chamber Air Temperature Main Steam Safety/Relief Valve Position Indicator Reactor Building Vent Noble Gas Monitor Standby Gas Treatment System Vent Noble Gas Monitor Turbine Building Vent Noble Gas Monitor Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
Turbine Building Accident Vent Stack Sampling System (PAVSSS)
Containment H2and 02 Analyzer One channel of Suppression Chamber Air Temperature Suppression Pool level Suppression Pool Temperature RPV level RPV pressure SRV Tailpipe Temperature Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
Turbine Building Accident Vent Stack Sampling System (PAVSSS)
Reactor Building Vent Noble Gas Monitor Standby Gas Treatment System Vent Noble Gas Monitor Turbine Building Vent Noble Gas Monitor One channel of Containment H2 and 02 The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-7 EFFECTIVE DATE 10/31/2007
TRM Post Accident Monitoring Instrumentation PPL Rev. 4 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS TRS 3.3.4.1 (continued)
Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability.
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES
- 1.
Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident."
- 2.
NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
- 3.
Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.
- 4.
Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "S" acoustic monitor.
- 5.
Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
- 6.
NEDO-33160-A, Revision 1, "Regulatory Relaxation For The Post Accident SRV Position Indication System," dated October 2006.
- 7.
NRC letter, "Final Safety Evaluation For Boiling Water Reactor Owners' Group (BWROG) Topical Report (TR) NEDO-33160, Regulatory Relaxation For The Post Accident SRV [Safety Relief Valve] Position Indication System (TAC No. MC5446)," dated September 26, 2006.
SUSQUEHANNA - UNIT 2 TRM / B 3.3-8 EFFECTIVE DATE 06/30/2010
Monitoring Program PPL Rev. 3 B 3.11.4.1 B 3.11.4.1 Monitoring Program BASES TRO The radiological environmental monitoring program required by this Requirement provides representative measurements of radiation and of radioactive materials in those environmental exposure pathways and for those radionuclides that lead to the highest potential radiation exposures of MEMBERS OF THE PUBLIC resulting from the station operation. This monitoring program thereby supplements the radiological effluent monitoring program by verifying that the measurable concentrations of radioactive materials and levels of radiation are not higher than expected on the basis of the effluent measurements and modeling of the environmental exposure pathways. Changes to the radiological environmental monitoring program specified in Table 3.11.4.1-1 may be made based on expected SSES operation and the results of radiological environmental monitoring during SSES operation.
The required detection capabilities for environmental sample analyses are tabulated in terms of the lower limits of detection (LLDs). The LLDs required by Table 3.11.4.1-3 are considered optimum for routine environmental measurements in industrial laboratories. It should be recognized that the LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
Detailed discussion of the LLD, and other detection limits, can be found in HASL Procedures Manual, HASL-300 (revised annually); Currie, L. A., "Limits for Qualitative Detection and Quantitative Determination - Application to Radiochemistry" Anal. Chem. 40, 586-93 (1968); and Hartwell, J. K., "Detection Limits for Radioanalytical Counting Techniques," Atlantic Richfield Hanford Company Report ARH-SA-215 (June 1975). (Reference 1)
This section of the TRM is also part of the ODCM (Reference 2).
Actions The Actions are defined to ensure proper corrective measures are taken when requirements are not met. Once a Condition Report is generated (per the applicable Action), the TRO may be exited because at that time, the Condition that caused the TRO is no longer out of compliance with the program.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-28 EFFECTIVE DATE 11/3012005
Monitoring Program PPL Rev. 3 B 3.11.4.1 B 3.11.4.1 Monitoring Program BASES ACTIONS Per Action A.1, the Annual Radiological Environmental Operating Report shall (continued) provide a description of the reasons for not conducting the program as required and the plans for preventing a recurrence.
The Special Report submitted per Action B.1 shall identify the cause(s) for exceeding the limit(s) and define the corrective actions to be taken to reduce radioactive effluents so that the potential annual dose to a MEMBER OF THE PUBLIC is less than the calendar year limits of Requirements 3.11.1.2, 3.11.2.2 and 3.11.2.3.
Include revised figure(s) and table for the ODCM reflecting the new locations for obtaining samples per Action F.1 in the next Radioactive Effluent Release Report.
TRS The TRSs are defined to be performed at the specified frequency to ensure that the requirements are implemented. Monitoring samples collected per TRS 3.11.4.1.1 shall be from the specific locations given in the table and figure in the ODCM. (Reference 2)
The TRSs are modified by a Note to take exception to TRS 3.0.3.
Table 3.11.4.1-1 Sample Locations Specific parameters of distance and direction sector from the centerline of one reactor, and additional description where pertinent, shall be provided for each and every sample location in this Table and in a table and figure(s) in the ODCM. Refer to NUREG-0133, "Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants," October 1978, and to Radiological Assessment Branch Technical Position, Revision 1, November 1979. (Reference 3) Deviations are permitted from the required sampling schedule if specimens are unobtainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons. If specimens are unobtainable due to sampling equipment malfunction, every effort shall be made to complete corrective action prior to the end of the next sampling (continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-29 EFFECTIVE DATE 11/30/2005
Monitoring Program PPL Rev. 3 B 3.11.4.1 B 3.11.4.1 Monitoring Program BASES TRS period. All deviations from the sampling schedule shall be documented in the (continued)
Annual Radiological Environmental Operating Report. It is recognized that, at times, it may not be possible or practicable to continue to obtain samples of the media of choice at the most desired location or time.
In these instances suitable alternative media and locations may be chosen for the particular pathway in question and appropriate substitutions made within 30 days in the radiological environmental monitoring program. Identify the cause of the unavailability of samples for that pathway and identify the new location(s) for obtaining replacement samples in the next Radioactive Effluent Release Report and also include in the report a revised figure(s) and table for the ODCM reflecting the new location(s).
Direct Radiation One or more instruments, such as a pressurized ion chamber, for measuring and recording dose rate continuously may be used in place of, or in addition to, integrating dosimeters. For the purposes of this table, a thermoluminescent dosimeter (TLD) is considered to be one phosphor; two or more phosphors in a packet are considered as two or more dosimeters. Film badges shall not be used as dosimeters for measuring direct radiation.
Radioiodine and Particulates - Sampling and Collection Frequency The charcoal cartridges used in the airborne radioiodine sampling conducted as part of the radiological environmental monitoring program are designed and tested by the manufacturer to assure a high efficiency in the capture of radioiodine. Certificates from the manufacturer of the cartridges are provided with each batch of cartridges certifying the percent retention of the radiodine for stated air flows.
Radioiodine and Particulates - Particulate Sample; Waterborne -Surface, Ground, Sediment: Food Products Gamma isotopic analysis means the identification and quantification of gamma-emitting radionuclides that may be attributable to the effluents from the facility.
Waterborne - Surface The "upstream sample" shall be taken at a distance beyond significant influence of the discharge. The "downstream" sample shall be taken within the discharge line or just downstream of the discharge line near the mixing zone.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-30 EFFECTIVE DATE 06/30/2010
Monitoring Program B 3.11.4.1 PPL Rev. 3 B 3.11.4.1 Monitoring Program BASES TRS (continued)
Waterborne - Drinking - Sampling and Collection Frequency A composite sample is one in which the quantity (aliquot) of liquid sampled is proportional to the quantity of flowing liquid and in which the method of sampling employed results in a specimen that is representative of the liquid flow. In this program composite samples shall be collected at time intervals that are very short (e.g.,
hourly) relative to the compositing period (e.g., monthly) in order to assure obtaining a representative sample.
Waterborne - Ground - Samples and Sample Locations Groundwater samples shall be taken when this source is tapped for drinking or irrigation purposes in areas where the hydraulic gradient or recharge properties are suitable for contamination.
Drinking Water 131 Analyses Calculation of the dose projected from 1-131 in drinking water to determine if 1-131 analyses of the water are required shall be performed for the maximum organ and age group using the methodology and parameters of the ODCM.
Food Products - Sampling and Collection Frequency If harvest occurs more than once a year, sampling shall be performed during each discrete harvest. If harvest occurs continuously, sampling shall be monthly. Attention shall be paid to including samples of tuborous and root food products.
Table 3.11.4.1-3 This list does not mean that only these nuclides are to be considered. Other peaks that are identifiable at 95% confidence level together with those of the above nuclides, shall also be analyzed and reported in the Annual Radiological Environmental Operating report.
Required detection capabilities for thermoluminescent dosimeters used for environmental measurements are given in Regulatory Guide 4.13.
(Reference 4)
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-31 EFFECTIVE DATE 08/31/1998
Monitoring Program B 3.11.4.1 PPL Rev. 3 B 3.11.4.1 Monitoring Program BASES TRS (continued)
The LLD is defined, for purpose of these Requirements, as the smallest concentration of radioactive material in a sample that will yield a net count (above system background) that will be detected with 95% probability with only 5% probability of falsely concluding that a blank observation represents a "real" signal.
For a particular measurement system (which may include radiochemical separation):
4.66sb LLD
E 9 V e 2.22
- Y 9 exp(-2At)
Where:
LLD is the a priori lower limit of detection as defined above (as picrocuries per unit mass or volume),
sb is the standard deviation of the background counting rate or of the countingrate of a blank sample as appropriate (as counts per minute),
E is the counting efficiency, as counts per disintegration, V is the sample size, in units of mass or volume, 2.22 is the number of disintegrations per minute per picrocurie, Y is the fractional radiochemical yield, when applicable, X is the radioactive decay constant for the particular radionuclide, and At for environmental samples is the elapsed time between sample collection (or end of the sample collection period) and time of counting.
Typical values of E, V, Y, and At should be used in the calculation.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-32 EFFECTIVE DATE 08/31/1998
Monitoring Program B 3.11.4.1 PPL Rev. 3 B 3.11.4.1 Monitoring Program BASES TRS (continued)
It should be recognized that the LLD is defined as a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement. Analyses shall be performed in such a manner that the stated LLDs will be achieved under routine conditions. Occasionally background fluctuations, unavoidably small sample sizes, the presence of interfering nuclides, or other uncontrollable circumstances may render these LLDS unachievable. In such cases, the contributing factors shall be identified and described in the Annual Radiological Environmental Operating Report.
REFERENCES
- 1. HASL Procedures Manual, HASL-300 (revised annually); Curie, L.A.,
"Limits for Qualitative Detection and Quantitative Determination -
Application to Radiochemistry" Anal. Chem. 40, 586-93 (1968); and Hartwell, J. K., "Detection Limits for Radioanalytical Counting Techniques," Atlantic Richfield Hanford Company Report ARH-SA-215 (June 1975) Offsite Dose Calculation Manual.
- 3. NUREG-0133, "Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants," October 1978, and to Radiological Assessment Branch Technical Position, Revision 1, November 1979.
- 5. NUREG-1302, Offsite Dose Calculation Manual Guidance: "Standard Radiological Effluent Controls for Boiling Water Reactors," April 1991.
SUSQUEHANNA - UNIT 2 TRM / B 3.11-33 EFFECTIVE DATE 06/30/2010