GNRO-2010/00056, NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G | 30 September 2010 | NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G | Finite Element Analysis Flow Induced Vibration |
ML102660406 | 30 September 2010 | NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix B Through Appendix D | |
ML102660401 | 30 September 2010 | NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Cover Through Appendix a | |
GNRO-2010/00064, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System | 29 September 2010 | Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System | |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
GNRO-2010/00065, Notification Letter Designating Grand Gulf Nuclear Station Balance of-Plant Systems within the Cyber Security Rule Scope | 23 September 2010 | Notification Letter Designating Grand Gulf Nuclear Station Balance of-Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML12019A302 | 22 September 2010 | Drawing M-1066B-002 (LRA-M-1066B-SH02), Rev. 002, Piping & Instrumentation Diagram Lube Oil System, Unit 1 | |
ML12019A301 | 22 September 2010 | Drawing M-1066B-001 (LRA-M-1066B-SH01), Rev. 0 02, Piping & Instrumentation Diagram Lube Oil System, Unit 1 | |
ML12019A090 | 9 September 2010 | Drawing M-1054, (LRA-M-1054), Rev. 038, P & I Diagram Feedwater System | |
ML102660403 | 8 September 2010 | License Amendment Request Extended Power Uprate | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Squib Pressure and Temperature Limits Report Minimum Critical Power Ratio Scram Discharge Volume Feedwater Controller Failure Fuel cladding |
ML102660408 | 8 September 2010 | Grid Stability Evaluation | Safe Shutdown High winds Loop seal Ultimate heat sink Mission time Anticipated operational occurrence Time to boil Internal Flooding Probabilistic Risk Assessment Scram Discharge Volume Large early release frequency Severe Accident Management Guideline Time Critical Operator Action Earthquake Fuel cladding Coast down Power Uprate Failure to Scram |
ML102660405 | 8 September 2010 | Extended Power Uprate Environmental Assessment | Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Environmental Justice Power Uprate |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102430571 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - Grand Gulf Nuclear Station | |
ML102660399 | 31 August 2010 | NEDO-33477, Revision 0, Safety Analysis Report for Grand Gulf Nuclear Station Constant Pressure Power Uprate. | |
GNRO-2010/00061, Transmittal of Report OAR-1-00010, Inservice Inspection Summary Report | 23 August 2010 | Transmittal of Report OAR-1-00010, Inservice Inspection Summary Report | |
ML12019A022 | 20 August 2010 | Drawing M-0034B (LRA-M-0034B), Rev. 048, P & I Diagram Domestic Water System, Unit 1. | |
ML102660400 | 20 August 2010 | GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull Withholding from Public Disclosure Proprietary Report NEDC-33477P | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal Ultimate heat sink Stroke time Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Feedwater Controller Failure MELLLA Flow Induced Vibration |
TAC:ME4679 | 20 August 2010 | ||
ML12017A224 | 20 August 2010 | Drawing M-1072F (LRA-M-1072F), Rev. 010, P & I Diagram Plant Service Water System, Unit 1. | |
ML12019A307 | 19 August 2010 | Drawing M-1067A (LRA-M-1067A), Rev. 063 Piping & Instrumentation Diagram Instrument Air System, Unit 1 | |
GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 | 17 August 2010 | Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 | High Radiation Area Anticipated operational occurrence Fuel cladding |
GNRO-2010/00059, Report of 10CFR72.48 Evaluations - July 1, 2009 Through June 30,2010 | 17 August 2010 | Report of 10CFR72.48 Evaluations - July 1, 2009 Through June 30,2010 | |
IR 05000416/2010403 | 9 August 2010 | NRC Security Inspection Report 05000416-10-403 | Significance Determination Process Affidavit |
ENOC-10-00027, Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment | 6 August 2010 | Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment. | Severe Accident Management Guideline Earthquake |
ML102170281 | 5 August 2010 | Acceptance Review | Cyber Security |
ML102170222 | 5 August 2010 | Acceptance Review of License Amendment Request for Approval of Cyber Security Plan | Cyber Security |
GNRO-2010/00057, Response to NRC Regulatory Issue Summary RIS-10-008, Preparation and Scheduling of Operator Licensing Examinations | 4 August 2010 | Response to NRC Regulatory Issue Summary RIS-10-008, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML102150029 | 29 July 2010 | Responses to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System | Anticipated operational occurrence Cyber Security |
TAC:ME4379 | 22 July 2010 | ||
GNRO-2010/00047, Operating License Amendment Withdrawal and Request, Cyber Security Plan | 22 July 2010 | Operating License Amendment Withdrawal and Request, Cyber Security Plan | Cyber Security Incorporated by reference |
IR 05000416/2010003 | 19 July 2010 | IR 05000416-10-003, on 03/28/2010 - 06/27/2010, Grand Gulf Nuclear Station, Integrated Resident and Regional Report, Maintenance Risk Assessments and Emergent Work Control, and Operability Evaluations | Boric Acid High Radiation Area Water Inventory Control Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Significance Determination Process Fire Protection Program Substantial potential for overexposure Operability Assessment |
IR 05000416/2010301 | 16 July 2010 | IR 05000416-10-301, on 06/25/10 - 07/08/10 for Grand Gulf Nuclear Station; Initial Operator Licensing Examination Report | |
GNRO-2010/00049, 2010-06-Post Exam Licensee Analysis | 7 July 2010 | 2010-06-Post Exam Licensee Analysis |