Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
RA-10-074, Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | 24 September 2010 | Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
SVPLTR 10-0037, 2011 Dresden Nuclear Power Station Initial Examination Outline Submittal | 23 September 2010 | 2011 Dresden Nuclear Power Station Initial Examination Outline Submittal | Earthquake |
TAC:ME2570 | 23 September 2010 | ||
ML102670675 | 23 September 2010 | Ltr. 09/23/2010 Dresden Re Confirmation of Initial License Examination | |
ML102660195 | 23 September 2010 | Request for Additional Information Related to Exelon Request to Amend Standby Liquid Control Technical Specifications | Safe Shutdown Enforcement Discretion |
ML102581132 | 22 September 2010 | Acknowledgement of Cyber Security Plan Supplement Based NEI 08-09, Revision 6 | Cyber Security |
SVPLTR 10-0039, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | 16 September 2010 | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
RS-10-152, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | 15 September 2010 | Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Reactor Vessel Water Level Hydrostatic Grace period |
ML102530572 | 10 September 2010 | Notification of NRC Inspection and Request for Information | Nondestructive Examination Scaffolding |
Press Release-10-154, National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study | 3 September 2010 | Press Release-10-154: National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study | Environmental Justice |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102440366 | 3 September 2010 | Request for Additional Information Related to a Modification That Replaces the Temperature-Based Isolation Instrumentation with Reactor Pressure-Based Isolation Instrumentation | |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102440046 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - Dresden Nuclear Power Station | |
ML102440437 | 20 August 2010 | After Action Report/Improvement Plan, August 10, 2010 Radiological Emergency Preparedness (REP) Program | |
ML102300709 | 18 August 2010 | No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010 | Cyber Security Fuel cladding |
ML101880616 | 16 August 2010 | Issuance of Amendments Authorizing Alternative Methods of Verifying Leakage within the Drywell | Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
RS-10-138, Additional Information Supporting Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Control Program | 13 August 2010 | Additional Information Supporting Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Control Program | Surveillance Frequency Control Program |
ML102070404 | 2 August 2010 | Revised Power Reactor Security Rule Letter | Enforcement Discretion Exemption Request |
IR 05000237/2010003 | 30 July 2010 | IR 05000237-10-003; 05000249-10-003; 0720003-10-001; on 04/01/2010-06/30/2010; Dresden Nuclear Power Station, Units 2 & 3; Heat Sink Performance, Operability Evaluations, Surveillance Testing, Identification and Resolution of Problems, and | High Radiation Area Internal Flooding Hydrostatic Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification VT-2 Significance Determination Process Job Performance Measure License Renewal Exemption Request Control of Heavy Loads Fire Protection Program GOTHIC Power Uprate Failure to Scram |
ML102150530 | 29 July 2010 | Attachment to Draft RAIs -Exelon EAL Upgrade Project | Earthquake |
ML102150527 | 29 July 2010 | Draft NRC RAI Dresden and Quad - Emergency Action Levels Based on NEI 99-01 Rev 5 | |
ML102140080 | 28 July 2010 | Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-10-125, Registration of Use of Cask to Store Spent Fuel | 27 July 2010 | Registration of Use of Cask to Store Spent Fuel | |
ML102070025 | 27 July 2010 | Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security Plan | Cyber Security |
ML102070544 | 26 July 2010 | Ltr. 07/26/10 Dresden Post-Approval Site Inspection Request for Information | Aging Management |
TAC:ME4298 | 23 July 2010 | ||
NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan | 23 July 2010 | Re-Submittal of the Exelon Cyber Security Plan | Cyber Security Incorporated by reference |
ML102040117 | 22 July 2010 | Re NRC Office of Investigations Report No. 3-2009-028 (AMS File No. RIII-2009-A-0005) | Condition Adverse to Quality |
ML100880085 | 21 July 2010 | Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 | |
ML101940422 | 21 July 2010 | RAI, Related to Risk-Informed Relocation of Specific Surveillance Frequency Requirements | Surveillance Frequency Control Program |
TAC:ME2567 | 19 July 2010 | ||
ML101900015 | 9 July 2010 | Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | Cyber Security |
TAC:ME2683 | 9 July 2010 | ||
IR 05000237/2010007 | 2 July 2010 | IR 05000237-10-007; 05000249-10-007; 04/19/2010 - 05/21/2010; Dresden Nuclear Power Station, Units 2 and 3; Component Design Bases Inspection (CDBI) | Safe Shutdown Commercial Grade Dedication Past operability Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Design basis earthquake Time Critical Operator Action Battery sizing Earthquake Weak link Power Uprate Failure to Scram |