ML22362A102 | 28 December 2022 | Proposed License Amendment Request to Supplement Spent Fuel Pool Criticality Safety Analysis | Fuel cladding |
ML22335A414 | 21 December 2022 | Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 | |
ML22353A620 | 19 December 2022 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | |
IR 05000336/2022501 | 14 December 2022 | Reissued Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 | |
ML22336A079 | 2 December 2022 | U2 - Final Qa/Related Forms | Job Performance Measure |
ML22326A033 | 22 November 2022 | Reactor Operator Retake License Examination | |
IR 05000336/2022301 | 22 November 2022 | Initial Operator Licensing Examination Report 05000336/2022301 | |
ML22325A104 | 21 November 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 | |
ML22318A192 | 16 November 2022 | NRC Office of Investigations Case No. 1-2021-019 | |
ML22320A575 | 16 November 2022 | E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel | |
IR 05000336/2022003 | 14 November 2022 | Integrated Inspection Report 05000336/2022003 and 05000423/2022003 | High winds Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Flooding Focused Evaluation Through-Wall Leak Fire Protection Program Operability Assessment |
ML22312A443 | 7 November 2022 | NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI | |
ML22280A170 | 2 November 2022 | Connecticut'S Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 | |
IR 05000336/2022010 | 1 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000336/2022010 and 05000423/2022010 | Probabilistic Risk Assessment Aging Management Significance Determination Process License Renewal |
ML22300A100 | 27 October 2022 | End of Cycle 21 Steam Generator Tube Inspection Report | Nondestructive Examination |
ML22298A205 | 25 October 2022 | Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles | |
ML22292A321 | 19 October 2022 | Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program | |
ML22277A841 | 18 October 2022 | Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel | |
ML22297A180 | 7 October 2022 | Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 | |
ML22278A093 | 5 October 2022 | E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 | |
ML22278A069 | 5 October 2022 | Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Planned Transition to Framatome Gaia Fuel at Millstone Power Station, Unit No. 3 | |
ML22277A252 | 4 October 2022 | Requalification Program Inspection | |
ML22272A549 | 29 September 2022 | Decommissioning Trust Fund Disbursement Revision to Previous Thirty-Day Written Notification | |
ML22272A033 | 29 September 2022 | Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle | Boric Acid Pressure Boundary Leakage Dissimilar Metal Weld |
ML22271A913 | 28 September 2022 | Alternative Request IR-4-11, Proposed Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces | Boric Acid Locked High Radiation Area Pressure Boundary Leakage |
ML22258A302 | 15 September 2022 | Proposed Request for Alternative Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps | |
ML22258A278 | 14 September 2022 | 10 CFR Part 50, Appendix E, Evacuation Time Estimate | Pandemic COVID-19 |
ML22251A129 | 9 September 2022 | Request for Additional Information Related to Response to Generic Letter 2004-04 | |
ML22252A177 | 9 September 2022 | Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) | |
IR 05000336/2022011 | 8 September 2022 | Triennial Fire Protection Inspection Report 05000336/2022011 and 05000423/2022011 | Safe Shutdown Fire Protection Program |
ML22243A032 | 7 September 2022 | Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis | |
ML21320A007 | 7 September 2022 | Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) | |
ML22245A003 | 2 September 2022 | Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed License Amendment Request for Millstone Power Station, Unit No. 3 | |
IR 05000336/2022005 | 31 August 2022 | Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2022005 and 05000423/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request COVID-19 COVID19 Fire Protection Program |
ML22236A060 | 29 August 2022 | Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral | Boric Acid Pressure Boundary Leakage Dissimilar Metal Weld |
ML22236A567 | 24 August 2022 | Operator Licensing Examination Approval | |
ML22236A556 | 24 August 2022 | Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed Alternative Request for Millstone Power Station, Unit No. 3 | |
ML22242A045 | 23 August 2022 | NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) | |
ML22213A120 | 19 August 2022 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 21 | |
IR 05000336/2022002 | 11 August 2022 | Integrated Inspection Report 05000336/2022002 and 05000423/2022002 | Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Operability Determination Moisture barrier Fire Protection Program Power change Operability Assessment |
ML22215A287 | 9 August 2022 | Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request | |
ML22213A122 | 28 July 2022 | Startup Test Report for Cycle 22 | |
ML22201A508 | 28 July 2022 | Authorization and Safety Evaluation for Alternative Request No. IR-04-09 | Hydrostatic |
ML22208A274 | 27 July 2022 | Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed Alternative Request for Millstone Power Station, Unit No. 3 | |
ML22095A107 | 11 July 2022 | Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD | |
ML22193A067 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Safe Shutdown Earthquake Weld Overlay FLEX Design basis earthquake Earthquake Power-Operated Valves Power Operated Valves Dissimilar Metal Weld |
ML22193A132 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | Hot Short Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Earthquake Fire Protection Program Early Warning Fire Detection Scaffolding Backfit |
ML22193A072 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted | Incorporated by reference |
ML22193A128 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting FLEX TORMIS License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Biofouling Fire Protection Program Unidentified leakage Siren Exit Sign |
ML22193A130 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Loop seal Fire Barrier Tornado Missile Internal Flooding FLEX TORMIS Earthquake Biofouling Fire Protection Program |