Issue date | Title | Topic | |
---|---|---|---|
RA-21-0106, Core Operating Limits Report (COLR) for Unit 2 Cycle 25 Reload Core | 31 March 2021 | Core Operating Limits Report (COLR) for Unit 2 Cycle 25 Reload Core | Boric Acid Shutdown Margin |
PMNS20210274, Stations Annual Assessment Meeting | 31 March 2021 | Stations Annual Assessment Meeting | |
RA-21-0036, Duke Energy Carolinas, LLC - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | 30 March 2021 | Duke Energy Carolinas, LLC - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | Decommissioning Funding Plan Authorized possession limits |
ML21078A150 | 30 March 2021 | Reassignment of Branch Chief | |
ML21089A173 | 30 March 2021 | EOC Slides Final | Coronavirus |
RA-21-0037, Duke Energy - Biennial Decommissioning Financial Assurance Reports | 30 March 2021 | Duke Energy - Biennial Decommissioning Financial Assurance Reports | |
Press Release-II-21-003, NRC to Hold Virtual Meeting to Discuss Performance of the Catawba, McGuire, and Oconee Nuclear Power Plants | 26 March 2021 | Press Release-II-21-003: NRC to Hold Virtual Meeting to Discuss Performance of the Catawba, McGuire, and Oconee Nuclear Power Plants | |
ML21081A124 | 22 March 2021 | EOC Slides Final | Coronavirus |
RA-21-0047, Onsite Property Insurance Coverage | 18 March 2021 | Onsite Property Insurance Coverage | |
RA-21-0046, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 18 March 2021 | CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML21070A002 | 16 March 2021 | Upcoming Steam Generator Tube Inservice Inspection | Stress corrosion cracking |
RA-21-0028, Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal | 15 March 2021 | Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal | Aging Management License Renewal |
ML21071A037 | 15 March 2021 | Letter: Review of the Draft Environmental Assessment and Finding of No Significant Impact for Catawba Nuclear Station and Oconee Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plan | Decommissioning Funding Plan |
ML21075A003 | 12 March 2021 | Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 | |
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 11 March 2021 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Tornado Missile Met Tower Emergency Lighting Incorporated by reference FLEX Open House Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Siren Overexposure |
IR 05000413/2020006 | 3 March 2021 | Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2020006 and 05000414/2020006 | Fitness for Duty Open Phase Condition License Renewal Exemption Request Power-Operated Valves COVID-19 |
IR 05000413/2021401 | 26 February 2021 | Security Baseline Inspection Report 05000413/2021401 and 05000414/2021401 | Coronavirus COVID-19 |
ML21055A607 | 23 February 2021 | 301 Exam Corporate Notification Letter | |
ML21053A319 | 22 February 2021 | Single Positive Test Form Collected on 04/30/2020 | |
ML21053A318 | 22 February 2021 | Annual Report Form for Drug and Alcohol Tests for 2020 | |
ML21053A320 | 22 February 2021 | Single Positive Test Form Collected on 05/15/2020 | |
ML21053A321 | 22 February 2021 | Single Positive Test Form Collected on 06/10/2020 | |
ML21053A322 | 22 February 2021 | Single Positive Test Form Collected on 7/22/2020 | |
ML21053A323 | 22 February 2021 | Single Positive Test Form Collected on 09/08/2020 | |
ML21053A324 | 22 February 2021 | Annual Fatigue Report Form for 2020 | |
ML21029A335 | 16 February 2021 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | VT-2 Incorporated by reference |
RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 | 11 February 2021 | Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( | |
ML21049A263 | 4 February 2021 | NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan | FLEX Siren |
RA-21-0017, Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage | 29 January 2021 | Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage | |
IR 05000413/2020004 | 28 January 2021 | Integrated Inspection Report 05000413/2020004 and 05000414/2020004 | Internal Flooding Enforcement Discretion Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower |
ML21019A393 | 11 January 2021 | 1 GFE Annual Letter for Fy 2021 | Generic Fundamentals Examination COVID-19 |
ML21007A372 | 7 January 2021 | NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) | |
ML21006A430 | 6 January 2021 | Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation |