Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
Press Release-III-18-008, NRC to Hold Open House to Discuss 2017 Performance of Duane Arnold Nuclear Power Plant29 March 2018Press Release-III-18-008: NRC to Hold Open House to Discuss 2017 Performance of Duane Arnold Nuclear Power PlantOpen House
ML18088A01028 March 2018NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05)Internal Flooding
NG-18-0041, Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control28 March 2018Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlReactor Vessel Water Level
Water Inventory Control
NG-18-0036, Supplemental Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-0327 March 2018Supplemental Information, Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03
ML18086B06627 March 2018Facility Cover Letter - Riii - March 2018 - GFE
L-2018-063, CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or Applications26 March 2018CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2018-060, Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3)26 March 2018Florida Power & Light: Nuclear Property Insurance - 10 CFR 50.54(w)(3)
IR 05000331/201841123 March 2018NRC Security Baseline Inspection Report 05000331/2018411 - (Cover Letter Only)Affidavit
CAC:L2482722 March 2018
ML17139C43022 March 2018Ltr a Leek, IA Dph, Re Review of the Draft EA and Fonsi for the Duane Arnold Energy Center ISFSI Decommissioning Funding Plan (72-32) (L24827)(ML16209A457-RLSO)Decommissioning Funding Plan
NG-18-0035, Transmittal of Change to Emergency Plan Implementing Procedure Form EAL-01, Hot Matrix EAL Board20 March 2018Transmittal of Change to Emergency Plan Implementing Procedure Form EAL-01, Hot Matrix EAL Board
L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table19 March 2018Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table
IR 05000331/201801016 March 2018NRC Triennial Fire Protection Inspection Report 05000331/2018010 (DRS-A.Dahbur)Safe Shutdown
Hydrostatic
Probabilistic Risk Assessment
FLEX
B.5.b
Significance Determination Process
Fire Protection Program
L-2018-030, Nuclear Energy Institute Commitments9 March 2018Nuclear Energy Institute Commitments
ML18016A6279 March 2018Issuance of License Amendment No. 304 Revision to Technical Specification 3.1.2, Reactor AnomaliesAnticipated operational occurrence
Fire Protection Program
ML18072A1048 March 2018NextEra Energy-Entergy Joint Composite Adversary Force
L-2018-064, NextEra Energy-Entergy Joint Composite Adversary Force8 March 2018NextEra Energy-Entergy Joint Composite Adversary Force
ML18011A0597 March 2018Issuance of License Amendment No. 303 Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block InstrumentationAnticipated operational occurrence
Process Control Program
Fire Protection Program
ML18057B2985 March 2018Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109Tornado Missile
FLEX
Battery sizing
Hardened vent
IR 05000331/20170062 March 2018Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006)
ML18064A2462 March 20184/4/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Duane Arnold Energy Center Performance for the 2017 Calendar YearOpen House
ML18064A2312 March 2018Public Outreach/Open House to Discuss NRC 2017 End-Of-Cycle Plant Performance Assessment of Duane Arnold Energy Center
ML18061A1502 March 2018Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman)Cyber Security
NG-18-0024, Response to Request for Additional Information Regarding License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, EGGS-Operating1 March 2018Response to Request for Additional Information Regarding License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, EGGS-Operating
ML18032A4831 March 2018Correction of Errors in Safety Evaluation Associated with License Amendment No. 301
ML18059A47528 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18058A05327 February 2018Letter: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 ISFSIDecommissioning Funding Plan
ML18058A05227 February 2018Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2)Decommissioning Funding Plan
Authorized possession limits
IR 05000331/201841026 February 2018NRC Material Control and Accounting Program Inspection Report 05000331/2018410Affidavit
ML18047A11723 February 2018Request for Withholding Information from Public Disclosure Re. LAR to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers
ML18053A76322 February 2018Annual Fatigue Report Form for 2017
ML18046A98821 February 2018Audit Plan and Setup of Online Reference Portal for License Amendment Request - 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System and Components for Nuclear Power Plants (CAC No. MG0199; EPID L-2017-LLA-0283)
ML18037B0036 February 2018NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288
NG-18-0013, Response to Second Request for Additional Information, Fifth Inservice Inspection Lnterval Program Plan, Relief Request RR-0326 January 2018Response to Second Request for Additional Information, Fifth Inservice Inspection Lnterval Program Plan, Relief Request RR-03
NG-18-0004, Submittal of Revision 1 to the Cyber Security Plan25 January 2018Submittal of Revision 1 to the Cyber Security PlanCyber Security
ML18025A23624 January 2018NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors
IR 05000331/201700422 January 2018NRC Integrated Inspection Report 05000331/2017004; 07200032/2017001; and Emergency Preparedness Annual Inspection Report 05000331/2017501Reactor Vessel Water Level
Packing leak
High Radiation Area
Tornado Missile
Internal Flooding
Temporary Modification
Locked High Radiation Area
FLEX
Significance Determination Process
Job Performance Measure
Operability Determination
Fire Protection Program
Scaffolding
Operability Assessment
Unidentified leakage
ML18023A07522 January 2018NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436
NG-18-0008, Flooding Focused Evaluation Summary19 January 2018Flooding Focused Evaluation SummarySafe Shutdown
Ultimate heat sink
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
ML17353A68219 January 2018Request for Relief No. RR 01, Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License TermIncorporated by reference
ML18019A07318 January 2018NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amend Request (LAR)(TSCR-178) - Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers
ML17347A11117 January 2018Safety Evaluation for Request for Relief from Seal Weld Procedure Qualification, Relief Request No. RR-04Nondestructive Examination
NG-18-0006, Emergency Preparedness Department Document Transmittal Dated 12/18/201716 January 2018Emergency Preparedness Department Document Transmittal Dated 12/18/2017
ML18012A54810 January 2018Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000331/2018001 (DRS-A.Dunlop)Ultimate heat sink
Temporary Modification
Flow Induced Vibration