Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-18-038, Annual Property Insurance Status Report | 30 March 2018 | Annual Property Insurance Status Report | |
ML18088A566 | 28 March 2018 | Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 | |
ML18086B066 | 27 March 2018 | Facility Cover Letter - Riii - March 2018 - GFE | |
ML18086B221 | 27 March 2018 | Withdrawal of Submittal of Relief Request for an Alternative to the ASME Code - Revise Main Steam Isolation Valve Partial Stroke Testing Frequency | Surveillance Frequency Control Program Cold shutdown justification |
Press Release-III-18-007, NRC Names New Senior Resident Inspector at Clinton Nuclear Power Plant | 26 March 2018 | Press Release-III-18-007: NRC Names New Senior Resident Inspector at Clinton Nuclear Power Plant | New Resident Inspector |
ML18043A505 | 22 March 2018 | Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MF9666; EPID L-2017-LLA-0223) | Reactor Vessel Water Level Anticipated operational occurrence Water Inventory Control Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Recently irradiated fuel |
Press Release-III-18-006, NRC to Discuss Clinton Nuclear Power Plant 2017 Performance | 22 March 2018 | Press Release-III-18-006: NRC to Discuss Clinton Nuclear Power Plant 2017 Performance | |
ML18066A924 | 13 March 2018 | Transmittal of Final Accident Sequence Precursor Analysis - Clinton Power Station, Shutdown Service Water Pump (Division 3) Start Failure (LER-461-2017-008) | Preliminary White Finding |
U-604409, Notification of Readiness for NRC 95001 Inspection (EA-17-098) | 9 March 2018 | Notification of Readiness for NRC 95001 Inspection (EA-17-098) | |
ML18067A237 | 8 March 2018 | NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Revise Emergency Plan for Midwest Stations | |
ML18065A836 | 7 March 2018 | Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report | |
ML18065A204 | 6 March 2018 | Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program Grace period Power change Siren |
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 5 March 2018 | Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
ML18064A049 | 2 March 2018 | Public Outreach/Open House to Discuss NRC 2017 End-Of-Cycle Plant Performance Assessment of Clinton Power Station | |
ML18064A158 | 2 March 2018 | 3/28/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Clinton Power Station Performance for the 2017 Calendar Year | Open House |
IR 05000461/2017006 | 2 March 2018 | Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2017006) | |
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | 1 March 2018 | Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | Coatings Fire Protection Program |
ML18058A523 | 1 March 2018 | Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements | Surveillance Frequency Control Program Cold shutdown justification |
Press Release-III-18-005, NRC Finalizes White Finding at Clinton Nuclear Power Plant | 28 February 2018 | Press Release-III-18-005: NRC Finalizes White Finding at Clinton Nuclear Power Plant | |
NMP1L3206, Co., Submittal of Emergency Plan Revision | 27 February 2018 | Co., Submittal of Emergency Plan Revision | |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML18058A736 | 27 February 2018 | Annual Fatigue Report Form for 2017 | |
NMP1L3206, Exelon Generation Co., Submittal of Emergency Plan Revision | 27 February 2018 | Exelon Generation Co., Submittal of Emergency Plan Revision | |
ML18053A759 | 22 February 2018 | Submittal of Exelon Cyber Security Plan Revisions | Cyber Security |
IR 05000461/2018091 | 22 February 2018 | Final Significance Determination of a White Finding with Assessment Follow Up and Notice of Violation; NRC Inspection Report No. 05000461/2018091 | Preliminary White Finding |
ML18047A159 | 16 February 2018 | EN-18-002, Issuance of Final Significance Determination and Notice of Violation to Exelon Generation Company, LLC, Clinton Power Station, (EA-17-203) | Significance Determination Process Preliminary White Finding |
ML18043A828 | 12 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
IR 05000461/2017004 | 8 February 2018 | NRC Integrated Inspection Report 05000461/2017004, 07201046/2017001 and Emergency Preparedness Annual Inspection Report 05000461/2017501 | Unanalyzed Condition Internal Flooding Enforcement Discretion Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program Grace period Power change |
IR 05000461/2018090 | 8 February 2018 | NRC Denial of Exelon Generation Company, LLC, Appeal of Clinton Power Station-Final Significance Determination of a White Finding; NRC Inspection Report 05000461/2018090 | |
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | 8 February 2018 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
ML18043A005 | 5 February 2018 | NRR E-mail Capture - Clinton Power Station, Unit 1 - Acceptance Review for Revised Alternative Source Term Dose Calculation License Amendment Request | |
05000461/LER-2017-010 | 5 February 2018 | Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram LER 17-010-00 for Clinton Power Station, Unit 1 Regarding Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram | Unanalyzed Condition |
U-604403, Response to Preliminary White Finding EA-17-203 | 2 February 2018 | Response to Preliminary White Finding EA-17-203 | Preliminary White Finding |
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
ML18053A182 | 31 January 2018 | Enclosure 3 - Clinton Power Station, Unit 1 - Evaluation of Proposed Changes | Safe Shutdown Fitness for Duty Cyber Security Severe Accident Management Guideline Fuel cladding Minimum staff |
ML18053A171 | 31 January 2018 | Attachment 3B - Clinton Power Station, Unit 1 - Clean Emergency Plan EP-AA-1000 Pages | Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A170 | 31 January 2018 | Attachment 3A - Clinton Power Station, Unit 1 - Marked-up Emergency Plan EP-AA-1000 Pages | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
IR 05000461/2017012 | 29 January 2018 | Errata-Clinton Power Station - NRC Special Inspection Report 05000461/2017012 | Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination License Renewal |
IR 05000461/2017011 | 26 January 2018 | NRC Inspection Report 05000461/2017011 and Preliminary White Finding | Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination Preliminary White Finding |
ML18026A967 | 26 January 2018 | NRC Special Inspection Report 05000461/2017012 | Packing leak Functionality Assessment Condition Adverse to Quality Significance Determination Process |
ML18025A799 | 25 January 2018 | Response to Request for Additional Information Regarding Generic Letter 2016-01 | Aging Management |
U-604400, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (Cover Letter Only) | 23 January 2018 | Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (Cover Letter Only) | |
ML17324A354 | 22 January 2018 | Issuance of Amendment Regarding Residual Heat Removal Subsystem Operability Requirements During Decay Heat Removal Operations (CAC No. MF9684; EPID L-2017-LLA-0225) | Surveillance Frequency Control Program |
ML18022A045 | 18 January 2018 | Confirmation of Initial License Examination (DRS-J.Seymour) | |
ML18037A708 | 16 January 2018 | Final After Action Report/Improvement Plan for the Clinton Power Station Radiological Emergency Preparedness Exercise Held on November 1, 2017 | Nuclear Accident Reporting System |
RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | 9 January 2018 | License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | Safe Shutdown Surveillance Frequency Control Program Fuel cladding |
CAC:MB8365 | 9 January 2018 | ||
05000461/LER-2017-009 | 4 January 2018 | Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Voltage Transient on 138 kV Offsite Source. LER 17-009-00 for Clinton, Unit 1, Regarding Trip of Emergency Reserve Auxiliary Transformer Static VAR Compensator Causes Positive Secondary Containment Pressure Following Voltage Transient on 138 kV Offsite Source |