Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 30 March 2017 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML17024A089 | 29 March 2017 | Issuance of Amendments Safety Limit Minimum Critical Power Ratio Change | Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
RS-16-046, Annual Property Insurance Status Report | 29 March 2017 | Annual Property Insurance Status Report | |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
CAC:MF9470 | 28 March 2017 | ||
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17047A353 | 15 March 2017 | Issuance of Amendment Partial Length Fuel Rod Burnup | |
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 13 March 2017 | Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
IR 05000352/2017301 | 13 March 2017 | Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 | |
ML17041A369 | 9 March 2017 | Letter to Those on the Attached List - Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Following Review of Additional Information - Licensee-Reported Category 3 Plants (Batch 2) | |
ML17062A491 | 3 March 2017 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) | |
IR 05000352/2016006 | 1 March 2017 | Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 | Open Phase Condition |
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence | 1 March 2017 | Board Resolutions Associated with Foreign Ownership, Control, or Influence | |
ML16356A272 | 28 February 2017 | Issuance of Amendments to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications | Reactor Vessel Water Level Anticipated operational occurrence |
ML17059D129 | 28 February 2017 | Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events | FLEX Spent Fuel Pool Instrumentation |
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports | 27 February 2017 | Submittal of Annual 2016 Fitness for Duty Performance Data Reports | Fitness for Duty |
ML17058A316 | 27 February 2017 | Annual Fatigue Report Form for 2016 | |
ML17090A365 | 22 February 2017 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML17027A191 | 15 February 2017 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief - James Danna | |
ML17045A228 | 14 February 2017 | Annual Report Form for Drug and Alcohol Tests for 2016 | |
RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-10 | 8 February 2017 | Summary of Changes to Quality Assurance Topical Report NO-AA-10 | |
IR 05000352/2016004 | 8 February 2017 | Integrated Inspection Report 05000352/2016004 and 05000353/2016004 | High Radiation Area Fire Barrier Commercial Grade Dedication Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Operability Determination |
ML17004A063 | 7 February 2017 | Proposed Alternative Request GVRR-8 Inservice Testing Program Third 10-Year Interval | Incorporated by reference |
ML17031A415 | 6 February 2017 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML17006A268 | 6 February 2017 | Safety Evaluation of Relief Requests I4R-05, I4R-06, I4R-07, I4R-08, I4R-09, I4R-11, I4R-12, and I4R-13, for the Fourth 10-Year Interval of the Inservice Inspection Program for Limerick Generating Station, Units 1 and 2 | VT-2 Incorporated by reference |
ML17037B850 | 6 February 2017 | 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments | |
05000352/LER-2017-001 | 27 January 2017 | Condition Prohibited by TS due to Parts Quality Issue LER 17-001-00 for Limerick Generating Station, Units 1 and 2 Regarding Condition Prohibited by TS due to Parts Quality Issue | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
IR 05000352/2016008 | 17 January 2017 | Problem Identification and Resolution Inspection Report 05000352/2016008 and 05000353/2016008 | Operability Determination |
ML17090A366 | 17 January 2017 | Final Qa/Related Forms - Form ES-401-6 (Folder 1) | |
ML17018A282 | 17 January 2017 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17072A432 | 16 January 2017 | Post Exam Comments and Technical References (Folder 1) | |
ML17075A384 | 16 January 2017 | Final Operating Test (Sections a, B and C) (Folder 3) | Water Inventory Control Probabilistic Risk Assessment Squib Job Performance Measure Time Critical Operator Action Overtravel Power change |
ML17075A383 | 16 January 2017 | Handouts to Applicants, Limerick (Folder 3) | |
ML17075A382 | 16 January 2017 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Shutdown Margin Half scram Stroke time Squib Surveillance Frequency Control Program Scram Discharge Volume B.5.b Mitigating Strategies Overtravel Earthquake Power change |
ML17075A380 | 16 January 2017 | Final Outlines (Folder 3) | Locked High Radiation Area |
ML17069A421 | 16 January 2017 | Draft Operating Exam (Section a, Section B and Section C) (Folder 2) | |
ML17069A420 | 16 January 2017 | Draft Written Exam | Safe Shutdown Shutdown Margin Half scram Stroke time Squib Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume B.5.b Mitigating Strategies Overtravel Earthquake Power change |
ML17069A418 | 16 January 2017 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML17069A417 | 16 January 2017 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML17013A227 | 13 January 2017 | Initial Operator Licensing Operating Test and Written Examination Approval, Limerick Generating Station Units 1 and 2 | |
ML16363A395 | 9 January 2017 | Request for Withholding Information from Public Disclosure for Limerick Generating Station, Unit 2 | |
ML17009A404 | 9 January 2017 | Acceptance of Requested Licensing Action Regarding Amendment-Safety Limit Minimum Critical Power Ratios | Minimum Critical Power Ratio |
ML17009A379 | 9 January 2017 | Acceptance of Requested Licensing Action Regarding Amendment-Partial Length Fuel Rod Burn-up | |
ML17009A293 | 9 January 2017 | Acceptance of Requested Licensing Action Regarding Amendment-Partial Length Fuel Rod Burn-up | |
ML17003A329 | 3 January 2017 | Acceptance Review - Limerick Unit 2 - Safety Limit Minimum Critical Power Ratios | Minimum Critical Power Ratio |