Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-17-030, Guarantee of Payment of Deferred Premiums - 2016 Annual Report31 March 2017Guarantee of Payment of Deferred Premiums - 2016 Annual Report
ML17088A75231 March 2017Transmittal of Draft Safety Evaluation for Proposed Extended Power Uprate License Amendments
CNL-17-021, Decommissioning Funding Status Report30 March 2017Decommissioning Funding Status Report
CNL-17-009, Revision to Commitment to Develop Technical Specification Requirements for the Emergency High Pressure Makeup Pump System in Technical Specifications30 March 2017Revision to Commitment to Develop Technical Specification Requirements for the Emergency High Pressure Makeup Pump System in Technical SpecificationsProbabilistic Risk Assessment
Fire Protection Program
CNL-17-031, Annual Insurance Status Report30 March 2017Annual Insurance Status Report
ML17089A31430 March 2017Fws to NRC, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Extended Power Uprate, List of Threatened and Endangered Species That May Occur in Your Project Location And/Or May Be Affected by Your Proposed Project
ML17034A36027 March 2017Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ...
CAC:MF760127 March 2017
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
IR 05000259/201740320 March 2017U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000259/2017403, 05000260/2017403 and 05000296/2017403 (Letter Only)Affidavit
IR 05000259/201740517 March 2017Cyber Security Follow-Up Inspection Report 05000259/2017405, 05000260/2017405 and 05000296/2017405 (Letter Only)Cyber Security
Affidavit
ML17052A13616 March 2017Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendment Nos. 297, 321, and 281 to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (CAC Nos. MF8125, MF8126, and MF8127)Cyber Security
ML17045A77214 March 2017Browns Ferry Nuclear Plant, Units 2 and 3 - Relief Request 2-ISI-30 and 3-ISI-27 - Relief from ASME Code, Section XI Requirements for Periods of Extended Operation for RPV Circumferential Shell Weld Examinations (CAC Nos. MF7795 and MF7796)
ML17072A49113 March 2017NRR E-mail Capture - Status of Browns Ferry Preferred Pump Logic LAR
CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..10 March 2017Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..Fukushima Dai-Ichi
CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information3 March 2017Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information
ML17061A2382 March 2017Site Emergency Plan Implementing Procedure Revisions
IR 05000259/20160061 March 2017Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Report 05000259/2016006, 05000260/2016006 and 05000296/2016006)Open Phase Condition
Spent Fuel Pool Instrumentation
Power Uprate
ML17059C45028 February 2017Single Positive Test Form Collected on 02/11/2016
CAC:MF812728 February 2017
ML17059D15128 February 2017NRR E-mail Capture - (External_Sender) State Consultation: Request for Comments on Amend to Browns Ferry 1, 2, and 3 Operating Licenses Related to Cyber Security Plan Milestone 8 Implementation ScheduleCyber Security
ML17059C47628 February 2017Single Positive Test Form Collected on 09/06/2016
ML17059C48028 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2017Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Internal Flooding
FLEX
Seismically rugged
ML17059C46828 February 2017Single Positive Test Form Collected on 03/09/2016
ML17059C47828 February 2017Single Positive Test Form Collected on 09/28/2016
ML17059C45628 February 2017Single Positive Test Form Collected on 02/15/2016
ML17059C46428 February 2017Single Positive Test Form Collected on 09/21/2016
ML17059C86628 February 2017Single Positive Test Form Collected on 02/27/2015
ML17059C47028 February 2017Single Positive Test Form Collected on 03/09/2016
ML17059C47228 February 2017Single Positive Test Form Collected on 09/29/2016
ML17059C44828 February 2017Single Positive Test Form Collected on 02/11/2016
ML17059C46728 February 2017Single Positive Test Form Collected on 02/11/2016
ML17059C45228 February 2017Single Positive Test Form Collected on 02/11/2016
ML17059C46528 February 2017Single Positive Test Form Collected on 06/06/2016
ML17059C45728 February 2017Single Positive Test Form Collected on 01/04/2016
ML17059C46128 February 2017Single Positive Test Form Collected on 09/12/2016
ML17059C85528 February 2017Annual Fatigue Report Form for 2016
ML17059C45528 February 2017Single Positive Test Form Collected on 02/04/2016
ML17059C45828 February 2017Single Positive Test Form Collected on 09/08/2016
ML17059C47328 February 2017Single Positive Test Form Collected on 08/31/2016
ML17059C45328 February 2017Single Positive Test Form Collected on 02/02/2016
ML17058A22527 February 2017Core Operating Limits Report for Cycle 20 Operation, Revision 0Shutdown Margin
Coast down
CNL-17-025, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 February 2017Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-17-018, Service List Update for Routine Information16 February 2017Service List Update for Routine Information
CNL-17-019, Plants, Units 1 and 2 - Service List Update for Documents Containing Official Use Only and Safeguards Information16 February 2017Plants, Units 1 and 2 - Service List Update for Documents Containing Official Use Only and Safeguards Information
ML17047A70816 February 2017Boiling Water Reactor Vessel Internals Project (BWRVIP) - Notification of Deviation from BWRVIP-48-A, Vessel Id Attachment Weld Inspection and Flaw Evaluation GuidelinesEVT-1
IR 05000259/20160048 February 2017NRC Integrated Inspection Report 05000259/2016004, 05000260/2016004, and 05000296/2016004Non-Destructive Examination
Fire Barrier
Time to boil
Past operability
Coatings
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Fire Watch
Power change
Downpower
ML17037C8966 February 2017Submittal of Site Emergency Plan Implementing Procedure Revisions
ML17038A1206 February 2017NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance for Review - Request to Adopt TSTF-545, Revision 3 and TSTF-299 Revision 0,