Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNL-17-030, Guarantee of Payment of Deferred Premiums - 2016 Annual Report | 31 March 2017 | Guarantee of Payment of Deferred Premiums - 2016 Annual Report | |
ML17088A752 | 31 March 2017 | Transmittal of Draft Safety Evaluation for Proposed Extended Power Uprate License Amendments | |
CNL-17-021, Decommissioning Funding Status Report | 30 March 2017 | Decommissioning Funding Status Report | |
CNL-17-009, Revision to Commitment to Develop Technical Specification Requirements for the Emergency High Pressure Makeup Pump System in Technical Specifications | 30 March 2017 | Revision to Commitment to Develop Technical Specification Requirements for the Emergency High Pressure Makeup Pump System in Technical Specifications | Probabilistic Risk Assessment Fire Protection Program |
CNL-17-031, Annual Insurance Status Report | 30 March 2017 | Annual Insurance Status Report | |
ML17089A314 | 30 March 2017 | Fws to NRC, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Extended Power Uprate, List of Threatened and Endangered Species That May Occur in Your Project Location And/Or May Be Affected by Your Proposed Project | |
ML17034A360 | 27 March 2017 | Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... | |
CAC:MF7601 | 27 March 2017 | ||
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
IR 05000259/2017403 | 20 March 2017 | U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000259/2017403, 05000260/2017403 and 05000296/2017403 (Letter Only) | Affidavit |
IR 05000259/2017405 | 17 March 2017 | Cyber Security Follow-Up Inspection Report 05000259/2017405, 05000260/2017405 and 05000296/2017405 (Letter Only) | Cyber Security Affidavit |
ML17052A136 | 16 March 2017 | Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendment Nos. 297, 321, and 281 to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (CAC Nos. MF8125, MF8126, and MF8127) | Cyber Security |
ML17045A772 | 14 March 2017 | Browns Ferry Nuclear Plant, Units 2 and 3 - Relief Request 2-ISI-30 and 3-ISI-27 - Relief from ASME Code, Section XI Requirements for Periods of Extended Operation for RPV Circumferential Shell Weld Examinations (CAC Nos. MF7795 and MF7796) | |
ML17072A491 | 13 March 2017 | NRR E-mail Capture - Status of Browns Ferry Preferred Pump Logic LAR | |
CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. | 10 March 2017 | Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. | Fukushima Dai-Ichi |
CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information | 3 March 2017 | Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information | |
ML17061A238 | 2 March 2017 | Site Emergency Plan Implementing Procedure Revisions | |
IR 05000259/2016006 | 1 March 2017 | Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Report 05000259/2016006, 05000260/2016006 and 05000296/2016006) | Open Phase Condition Spent Fuel Pool Instrumentation Power Uprate |
ML17059C450 | 28 February 2017 | Single Positive Test Form Collected on 02/11/2016 | |
CAC:MF8127 | 28 February 2017 | ||
ML17059D151 | 28 February 2017 | NRR E-mail Capture - (External_Sender) State Consultation: Request for Comments on Amend to Browns Ferry 1, 2, and 3 Operating Licenses Related to Cyber Security Plan Milestone 8 Implementation Schedule | Cyber Security |
ML17059C476 | 28 February 2017 | Single Positive Test Form Collected on 09/06/2016 | |
ML17059C480 | 28 February 2017 | Annual Report Form for Drug and Alcohol Tests for 2016 | |
CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2017 | Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Internal Flooding FLEX Seismically rugged |
ML17059C468 | 28 February 2017 | Single Positive Test Form Collected on 03/09/2016 | |
ML17059C478 | 28 February 2017 | Single Positive Test Form Collected on 09/28/2016 | |
ML17059C456 | 28 February 2017 | Single Positive Test Form Collected on 02/15/2016 | |
ML17059C464 | 28 February 2017 | Single Positive Test Form Collected on 09/21/2016 | |
ML17059C866 | 28 February 2017 | Single Positive Test Form Collected on 02/27/2015 | |
ML17059C470 | 28 February 2017 | Single Positive Test Form Collected on 03/09/2016 | |
ML17059C472 | 28 February 2017 | Single Positive Test Form Collected on 09/29/2016 | |
ML17059C448 | 28 February 2017 | Single Positive Test Form Collected on 02/11/2016 | |
ML17059C467 | 28 February 2017 | Single Positive Test Form Collected on 02/11/2016 | |
ML17059C452 | 28 February 2017 | Single Positive Test Form Collected on 02/11/2016 | |
ML17059C465 | 28 February 2017 | Single Positive Test Form Collected on 06/06/2016 | |
ML17059C457 | 28 February 2017 | Single Positive Test Form Collected on 01/04/2016 | |
ML17059C461 | 28 February 2017 | Single Positive Test Form Collected on 09/12/2016 | |
ML17059C855 | 28 February 2017 | Annual Fatigue Report Form for 2016 | |
ML17059C455 | 28 February 2017 | Single Positive Test Form Collected on 02/04/2016 | |
ML17059C458 | 28 February 2017 | Single Positive Test Form Collected on 09/08/2016 | |
ML17059C473 | 28 February 2017 | Single Positive Test Form Collected on 08/31/2016 | |
ML17059C453 | 28 February 2017 | Single Positive Test Form Collected on 02/02/2016 | |
ML17058A225 | 27 February 2017 | Core Operating Limits Report for Cycle 20 Operation, Revision 0 | Shutdown Margin Coast down |
CNL-17-025, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 27 February 2017 | Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
CNL-17-018, Service List Update for Routine Information | 16 February 2017 | Service List Update for Routine Information | |
CNL-17-019, Plants, Units 1 and 2 - Service List Update for Documents Containing Official Use Only and Safeguards Information | 16 February 2017 | Plants, Units 1 and 2 - Service List Update for Documents Containing Official Use Only and Safeguards Information | |
ML17047A708 | 16 February 2017 | Boiling Water Reactor Vessel Internals Project (BWRVIP) - Notification of Deviation from BWRVIP-48-A, Vessel Id Attachment Weld Inspection and Flaw Evaluation Guidelines | EVT-1 |
IR 05000259/2016004 | 8 February 2017 | NRC Integrated Inspection Report 05000259/2016004, 05000260/2016004, and 05000296/2016004 | Non-Destructive Examination Fire Barrier Time to boil Past operability Coatings Functionality Assessment Significance Determination Process Foreign Material Exclusion Operability Determination Fire Watch Power change Downpower |
ML17037C896 | 6 February 2017 | Submittal of Site Emergency Plan Implementing Procedure Revisions | |
ML17038A120 | 6 February 2017 | NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance for Review - Request to Adopt TSTF-545, Revision 3 and TSTF-299 Revision 0, |