1 NRR-PMDAPEm Resource From:
Saba, Farideh Sent:
Monday, February 06, 2017 5:10 PM To:
Williams, Gordon Robert (grwilliams1@tva.gov); Hammargren, Benjamin John (bjhammargren@tva.gov)
Cc:
Schrull, Edward Dustin (edschrull@tva.gov); Hon, Andrew; Beasley, Benjamin; Blamey, Alan; Tilton, Caroline
Subject:
Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance for Review - Request to Adopt TSTF-545, Revision 3 and TSTF-299 Revision 0, (CAC Nos. MF9084, MF9085, and MF9086)
Importance:
High
- Gordon, By letter dated January 17, 2017 (Agencywide Documents Access and Management System Accession No. ML17018A149, the Tennessee Valley Authority submitted an amendment request for Browns Ferry Nuclear Plant, Units 1, 2, and 3. The proposed amendment would revise the Technical Specifications by adoption of the changes contained in Technical Specification Task Force (TSTF) Traveler TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and TSF-299, Revision 0, Administrative Controls Program 5.5.2.b Test Interval and Exception, which clarifies the intent of refueling cycle intervals with respect to the system leak test requirements (i.e., 24 month intervals) and adds the following sentence, The provisions of SR 3.0.2 are applicable.. The purpose of this e mail is to provide you with the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is January 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at 301-415-1447.
Farideh E. Saba, P.E.
2 Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
Hearing Identifier:
NRR_PMDA Email Number:
3325 Mail Envelope Properties (Farideh.Saba@nrc.gov20170206170900)
Subject:
Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance for Review -
Request to Adopt TSTF-545, Revision 3 and TSTF-299 Revision 0, (CAC Nos. MF9084, MF9085, and MF9086)
Sent Date:
2/6/2017 5:09:57 PM Received Date:
2/6/2017 5:09:00 PM From:
Saba, Farideh Created By:
Farideh.Saba@nrc.gov Recipients:
"Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>
Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None "Blamey, Alan" <Alan.Blamey@nrc.gov>
Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None "Hammargren, Benjamin John (bjhammargren@tva.gov)" <bjhammargren@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3226 2/6/2017 5:09:00 PM Options Priority:
High Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received: