Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PLA-7449, Nuclear Property Insurance Program | 31 March 2016 | Nuclear Property Insurance Program | |
05000387/LER-2015-006 | 30 March 2016 | Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow Controller found in Manual LER 15-006-01 for Susquehanna, Unit 1, Regarding Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow... | Time of Discovery Reactor Vessel Water Level |
ML16062A216 | 28 March 2016 | Issuance of Amendments Emergency Action Level Scheme Change | Fuel cladding |
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
PLA-7446, Submittal of Cycle 20 Core Operating Limits Report (COLR) | 24 March 2016 | Submittal of Cycle 20 Core Operating Limits Report (COLR) | Shutdown Margin |
ML16060A230 | 24 March 2016 | Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers | Ultimate heat sink |
ML16081A366 | 21 March 2016 | Notice of Annual Assessment Meeting - Susquehanna Steam Electric Station, Units 1 & 2, on April 27, 2016 | Open House |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16063A473 | 7 March 2016 | NRC Investigation Report No. 1-2015-018 | |
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 4 March 2016 | Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
IR 05000387/2015006 | 2 March 2016 | ROP 16 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Inspection Report 05000387/2015006 and 05000388/2015006) | Spent Fuel Pool Instrumentation |
ML16057A840 | 26 February 2016 | Annual Fatigue Report Form for 2015 | |
ML16057A853 | 26 February 2016 | Single Positive Test Form Collected on 04/14/2015 | |
ML16057A846 | 26 February 2016 | Single Positive Test Form Collected on 03/16/2015 | |
ML16057A858 | 26 February 2016 | Single Positive Test Form Collected on 10/23/2015 | |
ML16057A849 | 26 February 2016 | Single Positive Test Form Collected on 03/25/2015 | |
ML16057A848 | 26 February 2016 | Single Positive Test Form Collected on 03/23/2015 | |
ML16057A850 | 26 February 2016 | Single Positive Test Form Collected on 03/30/2015 | |
ML16057A851 | 26 February 2016 | Single Positive Test Form Collected on 03/30/2015 | |
ML16057A845 | 26 February 2016 | Single Positive Test Form Collected on 03/16/2015 | |
ML16057A847 | 26 February 2016 | Single Positive Test Form Collected on 03/23/2015 | |
ML16057A836 | 26 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16057A854 | 26 February 2016 | Single Positive Test Form Collected on 04/14/2015 | |
ML16057A860 | 26 February 2016 | Single Positive Test Form Collected on 03/30/2015 | |
ML16057A852 | 26 February 2016 | Single Positive Test Form Collected on 3/30/2015 | |
ML16057A857 | 26 February 2016 | Single Positive Test Form Collected on 08/31/2015 | |
ML16057A856 | 26 February 2016 | Single Positive Test Form Collected on 05/15/2015 | |
ML16057A859 | 26 February 2016 | Single Positive Test Form Collected on 11/10/2015 | |
ML16057A844 | 26 February 2016 | Single Positive Test Form Collected on 03/09/2015 | |
ML16057A855 | 26 February 2016 | Single Positive Test Form Collected on 04/17/2015 | |
ML16007A201 | 25 February 2016 | Letter to Susquehanna Steam Electric Station, Units 1 and 2, Project Manager Assignment for Tanya Hood | |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML16050A046 | 18 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049) | FLEX Spent Fuel Pool Instrumentation |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML16049A426 | 17 February 2016 | NRC Office of Investigations Case No. 1-2015-012 | |
PLA-7439, Emergency Plan, Revision 59 | 10 February 2016 | Emergency Plan, Revision 59 | |
05000387/LER-2015-001 | 10 February 2016 | Inoperability of the 'B' Emergency Diesel Generator due to Fuel Oil Leakage LER 15-001-01 for Susquehanna, Unit 1, Regarding Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Steam Dome - Low Switches | Time of Discovery Mission time |
ML16041A358 | 10 February 2016 | NRC Office of Investigations Case No. 1-2015-011 | |
ML16054A243 | 9 February 2016 | NPDES Permit No. PA 0047325 Renewal Application | |
IR 05000387/2015004 | 9 February 2016 | IR 05000387/2015004 & 05000388/2015004 - Susquehanna Steam Electric Station Integrated Inspection Report, October 1, 2015 - December 31, 2015 | Ultimate heat sink Fire Barrier Stroke time Water Inventory Control Internal Flooding Enforcement Discretion Functionality Assessment Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Operability Assessment Siren |
ML16074A136 | 9 February 2016 | Certificate of Liability Insurance for Susquehanna, Units 1 and 2 | |
ML16040A203 | 3 February 2016 | Technical Specification Bases Manual | Shutdown Margin High Radiation Area Ultimate heat sink Stroke time Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML16039A269 | 3 February 2016 | Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna | |
PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 | 29 January 2016 | Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 | Surveillance Frequency Control Program Pressure Boundary Leakage |
PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 | 28 January 2016 | Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 | Safe Shutdown Ultimate heat sink |
CAC:MF7298 | 28 January 2016 | ||
PLA-7434, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. | 27 January 2016 | Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
05000387/LER-2015-003 | 26 January 2016 | Secondary Containment Inoperability Due to Failure to Meet Technical Specification Surveillance Requirement 3.6.4.1.1 LER 15-003-01 for Susquehanna, Unit 1, Regarding Secondary Containment Inoperability Due to Failure to Meet Technical Specification Surveillance Requirement 3.6.4.1.1 | Time of Discovery High winds |
ML15356A247 | 20 January 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulation Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |